Go to Post One must agree that a Bus full of FIRSTers is always Fun'n Frolic. :) - RoboMadi [more]
Home
Go Back   Chief Delphi > FIRST > General Forum
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
 
 
Thread Tools Rate Thread Display Modes
Prev Previous Post   Next Post Next
  #22   Spotlight this post!  
Unread 26-12-2007, 19:30
ChrisH's Avatar Unsung FIRST Hero
ChrisH ChrisH is offline
Generally Useless
FRC #0330 (Beach 'Bots)
Team Role: Engineer
 
Join Date: Jun 2001
Rookie Year: 1998
Location: Hermosa Beach, CA
Posts: 1,230
ChrisH has a reputation beyond reputeChrisH has a reputation beyond reputeChrisH has a reputation beyond reputeChrisH has a reputation beyond reputeChrisH has a reputation beyond reputeChrisH has a reputation beyond reputeChrisH has a reputation beyond reputeChrisH has a reputation beyond reputeChrisH has a reputation beyond reputeChrisH has a reputation beyond reputeChrisH has a reputation beyond repute
Re: Kickoff Procedure?

Most of our team gets together to watch the Kickoff via the NASA channel or the webcast. A few memebers will go to the local remote Kickoff to pick up the Kit.

After Kickoff we sit down and read the rules. Then we simulate the game in a variety of ways. Some simulations are tabletop versions of the game. Other times we use people to simulate robots. The purpose of thses simulations is to determine one thing. "How do we guarantee we will win the match?" We want to know what the field needs to look like at the end of the mach to ensure victory. This process can take up to several days.

Then we figure out how to make the field look the way we want it to at the end. We probably have several ideas on how to do this up front but we work to find the best one. We will also prioritize game tasks and figure out which ones are more important. For example, last year we decided that hanging tubes was more important to us than lifting robots, so we worked the arm and gripper first. We didn't perfect our ramps until our second regional. This strategizing process can again take up to several days.

It can take 10-14 days for us to finalize a concept. On the other hand once we have a concept, design and fab go full bore and we get a prototype running within days if not hours. The prototype also gives the software guys something to play with. In addition, if we should get bogged down in fabrication for our real robot, we could ship the prototype and compete with that if we had to. It wouldn't have our traditional blue and yellow, but it would be well tested.
__________________
Christopher H Husmann, PE

"Who is John Galt?"
Reply With Quote
 


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Rendering procedure and questions wt200999 3D Animation and Competition 17 10-02-2007 22:43
FIRST Kickoff/Remote Kickoff Info Now Up Ricky Q. General Forum 13 25-10-2005 16:34
Visualisation entry procedure & forms thoughtful 3D Animation and Competition 0 16-02-2004 23:33
Standard Operating Procedure K. Skontrianos General Forum 7 01-03-2003 14:02


All times are GMT -5. The time now is 02:19.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi