Go to Post There is beauty in pure simplicity. - artdutra04 [more]
Home
Go Back   Chief Delphi > FIRST > General Forum
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
 
 
Thread Tools Rate Thread Display Modes
Prev Previous Post   Next Post Next
  #7   Spotlight this post!  
Unread 01-01-2008, 23:32
AndyB's Avatar
AndyB AndyB is offline
Ambitiously Disappointing
AKA: Andy Burchardt
FRC #0171 (Cheese Curd Herd)
Team Role: College Student
 
Join Date: Mar 2005
Rookie Year: 2004
Location: Platteville, WI
Posts: 1,185
AndyB has a reputation beyond reputeAndyB has a reputation beyond reputeAndyB has a reputation beyond reputeAndyB has a reputation beyond reputeAndyB has a reputation beyond reputeAndyB has a reputation beyond reputeAndyB has a reputation beyond reputeAndyB has a reputation beyond reputeAndyB has a reputation beyond reputeAndyB has a reputation beyond reputeAndyB has a reputation beyond repute
Re: Build Timeline

I believe Andy Baker did a nice presentation on this in Atlanta a few years back for the championship. I'll see if I can find a link.

It seems we've always gone with this on 269.

Day 1
  • Review Game
  • Analyze Game by determining all available options to play the game
  • Decide how we want to play the game

Week 1
  • Individuals sketch ideas
  • Mentors help break down the ideas and determine the possible success of each
  • Decide on drive system
  • We usually have a mentor that kind of settles into their part of the robot. For instance, we had a mentor that helped the kids with the lift system. We had one that helped with the elevator for tube placement, and we had two that really just focused on the drive system the whole time. Of course we have our electrical and programming mentors as well.
  • Mockups
  • Prototyping

Week 2
  • Frame Design
  • CAD Designs of Individual Components
  • Optimization of Designs
  • Constraining Each Component (Weight, Size)
  • Continued Game Analysis
  • Frame Manufacturing
  • Drive Prototype Done

Week 3
  • Part Manufacturing
  • Drive Assembly (Depending on drive, could be later)
  • Manipulator Assembly
  • Refining Parts and CAD Drawings

Week 4
  • Component Testing
  • Robot Assembly
  • First drive test
  • Usually completely taking half the robot off and putting it in the dumpster and redesigning it. Usually the most crucial component...
  • Driver practice near end of week if lucky

Week 5
  • Programming optimization
  • Programming of the individual components
  • Driver Practice
  • Fixing problems

Week 6
  • Fixing
  • Optimizing
  • Practicing
  • Shipping
  • Finally, sleep... But probably not.

This definitly varies from year to year, but this seems to be the best starting point. Some years like last, we worked on the drive all the way into week 4 and really didn't finish assembling the robot and uploading the finished code until people were sitting there yelling at us that we needed to crate the thing.
__________________
Team 171 :: Cheese Curd Herd :: College Mentor, 2008-Present
Team 269 :: CooneyTech Robotics :: Student, 2005-2007
Reply With Quote
 


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
vex timeline? Morenoh149 FIRST Tech Challenge 2 17-10-2005 17:50
Timeline, The Book LBK Rules Chit-Chat 6 07-12-2003 09:31
timeline archiver 2000 1 23-06-2002 22:08
Regional Timeline archiver 2000 2 23-06-2002 22:08
Timeline? Pengiun Joe Chairman's Award 2 27-01-2002 16:35


All times are GMT -5. The time now is 13:48.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi