Go to Post We can not close our eyes, ears and minds from March to December. - Dave Campbell [more]
Home
Go Back   Chief Delphi > FIRST > General Forum
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
Reply
Thread Tools Rate Thread Display Modes
  #1   Spotlight this post!  
Unread 18-03-2008, 21:09
writchie writchie is offline
Engineering Mentor
AKA: Wally Ritchie
FRC #2152 (Team Daytona)
Team Role: Coach
 
Join Date: Dec 2007
Rookie Year: 2007
Location: Daytona Beach, Florida
Posts: 148
writchie has a reputation beyond reputewritchie has a reputation beyond reputewritchie has a reputation beyond reputewritchie has a reputation beyond reputewritchie has a reputation beyond reputewritchie has a reputation beyond reputewritchie has a reputation beyond reputewritchie has a reputation beyond reputewritchie has a reputation beyond reputewritchie has a reputation beyond reputewritchie has a reputation beyond repute
Field Damage/Safety Issues

At the end of last match we were advised that our team was now on a
"Watch List" for damaging the field in FLR match 68.

After investigating a bit further what we found was that our PVC "hand",
made of 1" Capped Schedule 80, was able to pentrate the grating of the
robocoach station. While pulling back to disengage, the hand was caught
on the grating and our 4 CIM drive was enough to pull the grating out from
it's welds, although there is some doubt that it was actually welded.

It appears that this grating is 1.5 x 1.5 inch steel mesh. This has an open area
of about 2.25 square inches. Rule <R04> raises a flag for projections with
areas under 1 inch and we easily exceed this with the CAP on our PVC.
However, we are smaller than the 2.25 square inch opening in the grate,
which by the way, we cannot find on the specs for the field.

Like most teams, we take great care to meet all rules. However, it seems
that the 2008 field design is not exactly complementary to <R04>. It seems
to me that if grating is relied upon, the openings should be smaller than the
smallest allowed projection.

Furthermore, this contact occurred in the bumper zone. It seems that the
bumper zones on the field, especially those on the crash wall (otherwise
known as the robo-coach station) should be plate. Additionally, it seems
that since there are students behind the robocoach station, the grate should
actually be the support for a polycarbonate plate. There is, I think, a bit
of a safety hazard in the present design of the Robotcoach stations which
IMHO should be more like the driver stations and offer better protection from
both robots and flying parts.

While we did get a few laughs over the prospects of becoming known as
the yellow impaler, this is perhaps a potential safety area that should be
looked at. We are having trouble finding fault with our design. If 1.5 x 1.5
steel grate is going to be used for protection, <R04> should require that
no part of the robot be able to pass through the opening in the grate.
At the very minimum, a piece of this grate ought to be used during
inspection to flag teams (and Robocoaches) of the potential hazard.
Reply With Quote
Reply


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Floor Damage? BHS Bucs General Forum 8 09-02-2008 07:25
Damage to Innertubes macwhoo Technical Discussion 14 17-01-2007 16:26
Ball Damage MaddyW Rules/Strategy 4 29-01-2006 13:36
Ball Damage cbolin Technical Discussion 30 26-01-2006 01:45
Question about rules: Does ball damage count as field damage? Jevin H Rules/Strategy 11 17-01-2006 14:21


All times are GMT -5. The time now is 09:10.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi