Go to Post It's easy to get so caught up in the intensity of build that we forget we need some down time to recharge and get a fresh head. Taking a day off will only happen if you make it a priority as important as any other team meeting. Long hours do not equate to productive hours. - Greg Hainsworth [more]
Home
Go Back   Chief Delphi > Technical > Control System > FRC Control System
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
Reply
Thread Tools Rating: Thread Rating: 6 votes, 5.00 average. Display Modes
  #31   Spotlight this post!  
Unread 17-04-2008, 11:56
Kyle Fenton Kyle Fenton is offline
GET IT ON!!
FRC #0121 (Rhode Warrior)
Team Role: Engineer
 
Join Date: May 2001
Rookie Year: 2000
Location: Middletown, R.I.
Posts: 785
Kyle Fenton has much to be proud ofKyle Fenton has much to be proud ofKyle Fenton has much to be proud ofKyle Fenton has much to be proud ofKyle Fenton has much to be proud ofKyle Fenton has much to be proud ofKyle Fenton has much to be proud ofKyle Fenton has much to be proud ofKyle Fenton has much to be proud ofKyle Fenton has much to be proud of
Send a message via AIM to Kyle Fenton
Re: NEW 2009 Control System Released

Does anyone know if this is mac and linux compatible. I know that there is a Labview IDE for mac os x, but is there a compiler for the new control board
__________________
121
Rhode Warriors
NAVSEA/Raytheon/URI/Middletown, Portsmouth, Tiverton, Mt. Hope HS
Quality Robots Since 1996
Reply With Quote
  #32   Spotlight this post!  
Unread 17-04-2008, 12:02
Bongle's Avatar
Bongle Bongle is offline
Registered User
FRC #2702 (REBotics)
Team Role: Mentor
 
Join Date: Feb 2004
Rookie Year: 2002
Location: Waterloo
Posts: 1,069
Bongle has a reputation beyond reputeBongle has a reputation beyond reputeBongle has a reputation beyond reputeBongle has a reputation beyond reputeBongle has a reputation beyond reputeBongle has a reputation beyond reputeBongle has a reputation beyond reputeBongle has a reputation beyond reputeBongle has a reputation beyond reputeBongle has a reputation beyond reputeBongle has a reputation beyond repute
Send a message via MSN to Bongle
Re: NEW 2009 Control System Released

Hmmm... If it's using 802.11, I wonder what effect that will have on in-pit wireless networks (I wonder if it is why they weren't allowed in Atlanta)

Cool system though. I hope I'm near a team next year so I can play with it some.
Reply With Quote
  #33   Spotlight this post!  
Unread 17-04-2008, 12:15
writchie writchie is offline
Engineering Mentor
AKA: Wally Ritchie
FRC #2152 (Team Daytona)
Team Role: Coach
 
Join Date: Dec 2007
Rookie Year: 2007
Location: Daytona Beach, Florida
Posts: 148
writchie has a reputation beyond reputewritchie has a reputation beyond reputewritchie has a reputation beyond reputewritchie has a reputation beyond reputewritchie has a reputation beyond reputewritchie has a reputation beyond reputewritchie has a reputation beyond reputewritchie has a reputation beyond reputewritchie has a reputation beyond reputewritchie has a reputation beyond reputewritchie has a reputation beyond repute
Re: NEW 2009 Control System Released

Quote:
Originally Posted by Bongle View Post
Hmmm... If it's using 802.11, I wonder what effect that will have on in-pit wireless networks (I wonder if it is why they weren't allowed in Atlanta)

Cool system though. I hope I'm near a team next year so I can play with it some.
The docs suggest there will be a different wireless modem for the competition.

I do hope that whoever provided the answers in the FAQ isn't engineering the wireless. 802.11 does NOT have 11 clear channels. There are only 3 non-overlapping channels in 802.11b/g.

Also the estimated date of availability to teams "KICKOFF", suggests that this program has already seriously slipped. That's not an estimate - its a drop dead deadline.
Reply With Quote
  #34   Spotlight this post!  
Unread 17-04-2008, 12:16
scirobotics's Avatar
scirobotics scirobotics is offline
Registered User
AKA: Oscar Hazelaar
FRC #2013 (Cyber Gnomes)
Team Role: Communications
 
Join Date: Feb 2008
Rookie Year: 2004
Location: Stayner
Posts: 41
scirobotics is a jewel in the roughscirobotics is a jewel in the roughscirobotics is a jewel in the rough
Re: NEW 2009 Control System Released

man, this is gonna be hge, have any of you guys thought of the posibilities?

too bad that we can't program ahead now, due to the whole system changing. doe sthis mean we only have 6 weeks to really get programming done?
__________________
now who has more balls?

I would propably cut my self trying to screw a nut on our bot, but hey, without money we wouldn't have that nut to begin with "Support devision of 2013 motto"

2013, living after the end (2012 :@)

2007 Rookie inspiration award Greater Toronto Regional
2008 Imagery award Waterloo Regional
2008 Imagery award Greater Tortonto Regional
2008 Finalists Waterloo Regional

no we can't give you gnome hats, not they are not dunche caps, NO you can't wear my beard....
Reply With Quote
  #35   Spotlight this post!  
Unread 17-04-2008, 12:31
Jonathan Norris Jonathan Norris is offline
Jno
FRC #0610 (Crescent Robotics)
Team Role: Mentor
 
Join Date: Nov 2005
Rookie Year: 2004
Location: Toronto
Posts: 1,080
Jonathan Norris has a reputation beyond reputeJonathan Norris has a reputation beyond reputeJonathan Norris has a reputation beyond reputeJonathan Norris has a reputation beyond reputeJonathan Norris has a reputation beyond reputeJonathan Norris has a reputation beyond reputeJonathan Norris has a reputation beyond reputeJonathan Norris has a reputation beyond reputeJonathan Norris has a reputation beyond reputeJonathan Norris has a reputation beyond reputeJonathan Norris has a reputation beyond repute
Re: NEW 2009 Control System Released

They are talking alot about how rugged the controller is... but it looks like every other component is exposed. Like the Power distribution, IO, Digital side car are basically just electrical boards. Hopefully these arn't the final product, the controller looks sweet and all.
__________________
Co-Founder of Taplytics.com
2013 World Champions (1241, 1477, 610)
Crescent Robotics Team 610 Mentor
K-Botics Team 2809 Founding Mentor ('09-'11)
Queen's University Mechanical Engineering, Applied Science '11

Crescent Robotics Team 610 Alumni
Reply With Quote
  #36   Spotlight this post!  
Unread 17-04-2008, 12:33
laultima laultima is offline
Registered User
FRC #1458 (Danvillans)
Team Role: Alumni
 
Join Date: Feb 2007
Rookie Year: 2005
Location: Danville, CA
Posts: 87
laultima is on a distinguished road
Send a message via AIM to laultima
Re: NEW 2009 Control System Released

One thing I am extremely exited about is the new power distribution block. Last year the PDB was the bane of our teams existence.
Quote:
Originally Posted by Jonathan Norris View Post
They are talking alot about how rugged the controller is... but it looks like every other component is exposed. Like the Power distribution, IO, Digital side car are basically just electrical boards. Hopefully these arn't the final product, the controller looks sweet and all.
Thats something that worries me about the new OI/Driver Station. Theres absolutely no protective housing. Though from the picture here http://first.wpi.edu/FRC/driverstation.html, I don't see any of the bottom buttons or headers labeled, making me think there will eventually be an enclosure for it.
__________________
2007 Davis/Sacramento Regional Winner (100, 997, 1458)

2008 Davis/Sacramento Regional Gracious Professionalism Award Winner


Last edited by laultima : 17-04-2008 at 12:35.
Reply With Quote
  #37   Spotlight this post!  
Unread 17-04-2008, 12:43
writchie writchie is offline
Engineering Mentor
AKA: Wally Ritchie
FRC #2152 (Team Daytona)
Team Role: Coach
 
Join Date: Dec 2007
Rookie Year: 2007
Location: Daytona Beach, Florida
Posts: 148
writchie has a reputation beyond reputewritchie has a reputation beyond reputewritchie has a reputation beyond reputewritchie has a reputation beyond reputewritchie has a reputation beyond reputewritchie has a reputation beyond reputewritchie has a reputation beyond reputewritchie has a reputation beyond reputewritchie has a reputation beyond reputewritchie has a reputation beyond reputewritchie has a reputation beyond repute
Re: NEW 2009 Control System Released

Quote:
Originally Posted by Jonathan Norris View Post
They are talking alot about how rugged the controller is... but it looks like every other component is exposed. Like the Power distribution, IO, Digital side car are basically just electrical boards. Hopefully these arn't the final product, the controller looks sweet and all.
If you dig down to the photos you will see that there are fairly well insulated cases for everything. Electrically, its now a kitbot and FRC will now be a field of LABVIEW demobots.

It remains to be seen whether there will be any viable C/C++ platform possible for 2009. Certainly not if you can't get your hands on anything until kickoff.
Reply With Quote
  #38   Spotlight this post!  
Unread 17-04-2008, 13:02
eitang eitang is offline
Hamosad 1657
AKA: Eitan Galon
FRC #1657 (Hamosad)
Team Role: Alumni
 
Join Date: Jul 2007
Rookie Year: 2008
Location: Israel
Posts: 24
eitang has a spectacular aura abouteitang has a spectacular aura about
Re: NEW 2009 Control System Released

here is the pic of a temp case for the driver station
http://first.wpi.edu/driver_station_in_temp_case.jpg
Reply With Quote
  #39   Spotlight this post!  
Unread 17-04-2008, 13:07
Mr. Lim Mr. Lim is offline
Registered User
AKA: Mr. Lim
no team
Team Role: Leadership
 
Join Date: Jan 2004
Rookie Year: 1998
Location: Toronto, Ontario
Posts: 1,125
Mr. Lim has a reputation beyond reputeMr. Lim has a reputation beyond reputeMr. Lim has a reputation beyond reputeMr. Lim has a reputation beyond reputeMr. Lim has a reputation beyond reputeMr. Lim has a reputation beyond reputeMr. Lim has a reputation beyond reputeMr. Lim has a reputation beyond reputeMr. Lim has a reputation beyond reputeMr. Lim has a reputation beyond reputeMr. Lim has a reputation beyond repute
Re: NEW 2009 Control System Released

We can all hope that they did something similar to when we switched controllers in 2004.

Teams received the EDU-RC which was a smaller footprint version of the new RC. It was functionally the same, and would later become the foundation of the VEX controller.

Based on today's FTC announcement, one would wonder if we couldn't do the same with the new FTC controller? I haven't heard much on that front... but if they use the same programming toolchain, it could happen.
__________________
In life, what you give, you keep. What you fail to give, you lose forever...
Reply With Quote
  #40   Spotlight this post!  
Unread 17-04-2008, 14:03
writchie writchie is offline
Engineering Mentor
AKA: Wally Ritchie
FRC #2152 (Team Daytona)
Team Role: Coach
 
Join Date: Dec 2007
Rookie Year: 2007
Location: Daytona Beach, Florida
Posts: 148
writchie has a reputation beyond reputewritchie has a reputation beyond reputewritchie has a reputation beyond reputewritchie has a reputation beyond reputewritchie has a reputation beyond reputewritchie has a reputation beyond reputewritchie has a reputation beyond reputewritchie has a reputation beyond reputewritchie has a reputation beyond reputewritchie has a reputation beyond reputewritchie has a reputation beyond repute
Re: NEW 2009 Control System Released

Quote:
Originally Posted by SlimBoJones View Post
We can all hope that they did something similar to when we switched controllers in 2004.

Teams received the EDU-RC which was a smaller footprint version of the new RC. It was functionally the same, and would later become the foundation of the VEX controller.

Based on today's FTC announcement, one would wonder if we couldn't do the same with the new FTC controller? I haven't heard much on that front... but if they use the same programming toolchain, it could happen.
The two architectures are completely different. It appears the only commonality would be through labview.

You can get started with the new FRC control system stuff now. The following are current prices:

cRIO 9074 - $2999
Power Supply & Cables $249
9201, 9403, and 9472 Modules and Cables $1219
Subtotal Total Hardware $4467

Software:

Labview for Windows $4099
Labview Real-Time Module $2499
Labview FPGA Module $2499

Subtotal Software $9097

Total $13,564

The above doesn't include the custom undocumented digital sidecar so the above would only get you started on the tool chain and sensor platforms.
Reply With Quote
  #41   Spotlight this post!  
Unread 17-04-2008, 14:08
whytheheckme's Avatar
whytheheckme whytheheckme is offline
Registered User
AKA: Jacob Komar
no team
 
Join Date: Feb 2006
Rookie Year: 2005
Location: Providence, RI
Posts: 1,320
whytheheckme has a reputation beyond reputewhytheheckme has a reputation beyond reputewhytheheckme has a reputation beyond reputewhytheheckme has a reputation beyond reputewhytheheckme has a reputation beyond reputewhytheheckme has a reputation beyond reputewhytheheckme has a reputation beyond reputewhytheheckme has a reputation beyond reputewhytheheckme has a reputation beyond reputewhytheheckme has a reputation beyond reputewhytheheckme has a reputation beyond repute
Send a message via ICQ to whytheheckme Send a message via AIM to whytheheckme Send a message via MSN to whytheheckme Send a message via Yahoo to whytheheckme
Re: NEW 2009 Control System Released

MK, thought out of the blue.

I remember on one of the Control System prediction forms, someone from intelitek said that they couldn't say intelitek's involvement for next years control system, but that they were very excited about it....

Have we heard anything about easyC?

Jacob
Reply With Quote
  #42   Spotlight this post!  
Unread 17-04-2008, 14:24
Roboj Roboj is offline
Registered User
no team (National Instruments)
 
Join Date: Apr 2008
Rookie Year: 2007
Location: Austin, TX
Posts: 15
Roboj is an unknown quantity at this point
Re: NEW 2009 Control System Released

Quote:
Originally Posted by writchie View Post
I do hope that whoever provided the answers in the FAQ isn't engineering the wireless. 802.11 does NOT have 11 clear channels. There are only 3 non-overlapping channels in 802.11b/g.
You are correct that 802.11b/g only have 3 clear channels. However, the FAQ did not say b or g were being used. Other 802.11 variants (such as 802.11a) do have 11 non-overlapping clear channels.
Reply With Quote
  #43   Spotlight this post!  
Unread 17-04-2008, 14:47
dcbrown dcbrown is offline
Registered User
AKA: Bud
no team
Team Role: Mentor
 
Join Date: Jan 2005
Rookie Year: 2005
Location: Hollis,NH
Posts: 236
dcbrown has much to be proud ofdcbrown has much to be proud ofdcbrown has much to be proud ofdcbrown has much to be proud ofdcbrown has much to be proud ofdcbrown has much to be proud ofdcbrown has much to be proud ofdcbrown has much to be proud ofdcbrown has much to be proud ofdcbrown has much to be proud of
Re: NEW 2009 Control System Released

Quote:
Originally Posted by writchie View Post
The two architectures are completely different. It appears the only commonality would be through labview.

You can get started with the new FRC control system stuff now. The following are current prices:

cRIO 9074 - $2999
Power Supply & Cables $249
9201, 9403, and 9472 Modules and Cables $1219
Subtotal Total Hardware $4467

Software:

Labview for Windows $4099
Labview Real-Time Module $2499
Labview FPGA Module $2499

Subtotal Software $9097

Total $13,564

The above doesn't include the custom undocumented digital sidecar so the above would only get you started on the tool chain and sensor platforms.
Also doesn't include the "bumps" for the i/o modules or the cable for the digital side car, or the wireless access point listed as part of the cRIO-FRC kit.

Discounting is steep - to start NI offers 30% discount for 100 or more of same config ordered in a 1 year period. Going to 4 slot chassis from 8 saves $300. The FPGA size is one of the more sensitive pieces. Going from a 1M to 3M FPGA is an increase of $1700.

But anyway you slice it, this is an expensive piece of hardware. If teams want a 2nd one for proto work, its going to put a serious dent in the budget. This could become a factor between have and have-not teams in terms of which have deep pockets and are able to afford a 2nd controller setup unless teams are able to order a cRIO-FRC at discounted price. Of course, if teams can come up with ~$4000 needed now to purchase one they could go that route. But, without the pwm breakout board (digital sidecar), it would be difficult to build a fully functioning robot.

Debug is either via LabVIEW or Wind River IDE. But in order to use Wind River Workbench IDE you need a full license for the WR IDE -- but that isn't listed on the description of what's included in the new controller set.
Reply With Quote
  #44   Spotlight this post!  
Unread 17-04-2008, 14:54
Adam Y.'s Avatar
Adam Y. Adam Y. is offline
Adam Y.
no team (?????)
 
Join Date: Mar 2002
Location: Long Island
Posts: 1,979
Adam Y. is a splendid one to beholdAdam Y. is a splendid one to beholdAdam Y. is a splendid one to beholdAdam Y. is a splendid one to beholdAdam Y. is a splendid one to beholdAdam Y. is a splendid one to beholdAdam Y. is a splendid one to behold
Send a message via AIM to Adam Y.
Re: NEW 2009 Control System Released

Quote:
Originally Posted by dcbrown View Post
Of course, if teams can come up with ~$4000 needed now to purchase one they could go that route. But, without the pwm breakout board (digital sidecar), it would be difficult to build a fully functioning robot.
It's actually not $4000. The academic price is significantly cheaper but still would put a dent in the budget.
__________________
If either a public officer or any one else saw a person attempting to cross a bridge which had been ascertained to be unsafe, and there were no time to warn him of his danger, they might seize him and turn him back without any real infringement of his liberty; for liberty consists in doing what one desires, and he does not desire to fall into the river. -Mill
Reply With Quote
  #45   Spotlight this post!  
Unread 17-04-2008, 14:56
lingomaniac88 lingomaniac88 is offline
Registered User
FRC #1554
Team Role: Alumni
 
Join Date: Jan 2008
Rookie Year: 2007
Location: Long Island, NY / Cambridge, MA
Posts: 230
lingomaniac88 has much to be proud oflingomaniac88 has much to be proud oflingomaniac88 has much to be proud oflingomaniac88 has much to be proud oflingomaniac88 has much to be proud oflingomaniac88 has much to be proud oflingomaniac88 has much to be proud oflingomaniac88 has much to be proud of
Re: NEW 2009 Control System Released

I was looking at some stuff on WPI, and I'm wondering about something. Looking at the driver station, I noticed that there are some extra pins for digital input, digital output, and analog. What are these meant for? Are they meant for custom buttons and switches to control our robots?

I want to make sure I know how things are hooked up. If one end of a PWM cable goes into a Victor speed controller, where does the other end go? Does it go into the SideCar? If so, where? If not, does it go right into the analog module? What about for Spike relays? It would be really disappointing to have a well-built robot that can't do a darn thing because it's not hooked up properly.
__________________
"It is common sense to take a method and try it. If it fails, admit it frankly and try another. But above all, try something."
-- Franklin Delano Roosevelt.
Reply With Quote
Reply


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Buying the 2009 control system BornaE FRC Control System 9 16-10-2008 17:16
2009 Control System Feature Wishlist tdlrali FRC Control System 47 17-06-2008 00:25
pic: 2009 Control System, Mounted Billfred FRC Control System 23 01-05-2008 19:02
2009 Control System Possibility? Racer26 Rumor Mill 121 25-04-2008 09:05
Forum Request: Post-2009 control system? Billfred CD Forum Support 3 22-04-2008 16:22


All times are GMT -5. The time now is 06:52.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi