Go to Post You're never too cool for a giant conga line around an arena. - Michelle 236 [more]
Home
Go Back   Chief Delphi > Other > VEX
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
 
 
Thread Tools Rating: Thread Rating: 2 votes, 5.00 average. Display Modes
Prev Previous Post   Next Post Next
  #34   Spotlight this post!  
Unread 18-04-2008, 22:49
gblake's Avatar
gblake gblake is offline
6th Gear Developer; Mentor
AKA: Blake Ross
no team (6th Gear)
Team Role: Mentor
 
Join Date: May 2006
Rookie Year: 2006
Location: Virginia
Posts: 1,935
gblake has a reputation beyond reputegblake has a reputation beyond reputegblake has a reputation beyond reputegblake has a reputation beyond reputegblake has a reputation beyond reputegblake has a reputation beyond reputegblake has a reputation beyond reputegblake has a reputation beyond reputegblake has a reputation beyond reputegblake has a reputation beyond reputegblake has a reputation beyond repute
Re: New FTC Platform

Quote:
Originally Posted by Rick TYler View Post
I'm in Atlanta right now -- the information above is correct. I stopped by the demo field and and never saw a robot moving under remote control -- but the demo teams said they only had two weeks to build their 'bots so that's not a big surprise (at least to me). Overall, it's a lot of value for $450, and includes three SDKs in the box (Labview, RobotC, and something else -- the LegoNXT environment?). Got to run to dinner now...
If I remember correctly we ("the teams") had 4 weeks or a bit longer to build our bots. Whoever told you two weeks did not get to use all of the time that was available.

The bots can, do and did move under remote control. However, what you saw was evidence of the non-trivial software problems that we encountered in this version of the kit and field control system. I presume that more mature versions of all the different software tools will be shipped; but I wouldn't be surprised if the first season encounters a few bumps in the proverbial road when hundreds of FTCers truly start field-testing them.

Blake
__________________
Blake Ross, For emailing me, in the verizon.net domain, I am blake
VRC Team Mentor, FTC volunteer, 5th Gear Developer, Husband, Father, Triangle Fraternity Alumnus (ky 76), U Ky BSEE, Tau Beta Pi, Eta Kappa Nu, Kentucky Colonel
Words/phrases I avoid: basis, mitigate, leveraging, transitioning, impact (instead of affect/effect), facilitate, programmatic, problematic, issue (instead of problem), latency (instead of delay), dependency (instead of prerequisite), connectivity, usage & utilize (instead of use), downed, functionality, functional, power on, descore, alumni (instead of alumnus/alumna), the enterprise, methodology, nomenclature, form factor (instead of size or shape), competency, modality, provided(with), provision(ing), irregardless/irrespective, signage, colorized, pulsating, ideate
Reply With Quote
 


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
[FTC]: New Jersey FTC Tournament Ben Mitchell FIRST Tech Challenge 2 04-03-2008 22:23
[FTC]: FTC]: FTC Champ Tournament - Ontario (Scoring Breakdown) Mr. Lim FIRST Tech Challenge 2 03-03-2008 11:54
[FTC]: [FTC]: Ontario Provincial FTC Start/End Times cbhl FIRST Tech Challenge 8 16-12-2007 13:37
[FTC]: Hey FTC teams, Vex and a chance to be on MTV? Rich Kressly FIRST Tech Challenge 1 12-09-2007 13:35
[FVC]: New FTC logo available now KathieK FIRST Tech Challenge 3 12-07-2007 12:43


All times are GMT -5. The time now is 12:37.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi