|
Re: Rev. 2 Blueprint corrections
Posted by Paul at 1/9/2001 4:13 PM EST
Engineer on team #365, Miracle of Engineering, from Avon Grove HS and DuPont.
In Reply to: Rev. 2 Blueprint corrections
Posted by Paul on 1/9/2001 4:10 PM EST:
Another problem caused by the revised blue print. A dimension of 3'-0 1/2" was added for the goal base, view C-C. The bill of material still has this dimension at 34-1/4". Last time I checked, 3 ft = 36". Which dimension is correct?
__________________
This message was archived from an earlier forum system. Some information may have been left out. Start new discussion in the current forums, and refer back to these threads when necessary.
|