Go to Post I remember seeing that hair do. It is what inspired me to become an MC one day. - Tetraman [more]
Home
Go Back   Chief Delphi > Technical > Electrical
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
Closed Thread
Thread Tools Rate Thread Display Modes
  #16   Spotlight this post!  
Unread 12-08-2008, 09:06
IndySam's Avatar
IndySam IndySam is offline
Registered User
FRC #0829 (Digital Goats)
Team Role: Mentor
 
Join Date: Nov 2005
Rookie Year: 2004
Location: Indy
Posts: 3,354
IndySam has a reputation beyond reputeIndySam has a reputation beyond reputeIndySam has a reputation beyond reputeIndySam has a reputation beyond reputeIndySam has a reputation beyond reputeIndySam has a reputation beyond reputeIndySam has a reputation beyond reputeIndySam has a reputation beyond reputeIndySam has a reputation beyond reputeIndySam has a reputation beyond reputeIndySam has a reputation beyond repute
Re: 2009 Distribution Block

Well said Al. We never had a single failure withe the Rockwell. Properly used they were very reliable.

Any product improperly used is subject to failure.
__________________
"Champions are champions not because they do anything extraordinary but because they do the ordinary things better than anyone else." —Chuck Knoll


2015 Indianapolis District Winner
2014 Boilermaker Regional Industrial Design Award
2013 Smoky Mountain Regional Industrial Design Award
2012 Boilermaker Engineering Excellence Award
2010 Boilermaker Rockwell Innovation in Control Award.
2009 Buckeye J&J Gracious Professionalism Award
2009 Boilermaker J&J Gracious Professionalism Award
2008 Boilermaker J&J Gracious Professionalism Award
2007 St Louis Regional Winners
  #17   Spotlight this post!  
Unread 12-08-2008, 10:17
jonboy jonboy is offline
Engineer/Mentor
FRC #0885 (The Green Team)
Team Role: Engineer
 
Join Date: Jan 2003
Rookie Year: 2003
Location: Tunbridge, Vermont
Posts: 46
jonboy is an unknown quantity at this point
Re: 2009 Distribution Block

I also agree we Al.

I think we should remember GP and realize that everyone associated with the FIRST organization is trying with all their ability to do their best and that no one is perfect. As for the IR receiver board we did not have a problem with it and appreciated the introduction of a new component. All we did was follow the directions on how to install and use. My impression was the developer and producer was trying his best and probably at a sacrifice to some other more important business or personal endeavors. It seems that anytime there is change introduced to a system especially trying to make an improvement in technology there are going to be some rough spots to be dealt with. GP goes a long way to separate FIRST from many other organizations. Let us all pull together to improve our technology, hardware, software and most importantly the culture for the students. Constructive criticism works the best! Reading and following the documentation works very well too.
__________________
... jon
  #18   Spotlight this post!  
Unread 12-08-2008, 10:46
dlavery's Avatar
dlavery dlavery is offline
Curmudgeon
FRC #0116 (Epsilon Delta)
 
Join Date: Jun 2001
Rookie Year: 1996
Location: Herndon, VA
Posts: 3,176
dlavery has a reputation beyond reputedlavery has a reputation beyond reputedlavery has a reputation beyond reputedlavery has a reputation beyond reputedlavery has a reputation beyond reputedlavery has a reputation beyond reputedlavery has a reputation beyond reputedlavery has a reputation beyond reputedlavery has a reputation beyond reputedlavery has a reputation beyond reputedlavery has a reputation beyond repute
Re: 2009 Distribution Block

Although not necessarily a fan of the Rockwell distribution block because of its size, we had no complaints about its performance. We followed the manufacturers directions regarding wire prep. All inbound wires were secured with strain reliefs. We used wires of the appropriate gauge size, and left the ends loose (unsoldered). As a result, we never had a problem with wires working loose from the block during the entire season. We checked the clamp screws periodically to see if there was an issue, but found that they never worked loose and did not need to be retightened.

Although I have not had a chance to play with one yet (c'mon, when are they going to announce who is in the beta test program? ), I expect that the 2009 distribution block will perform just as well if reasonable care is taken to use it properly. Follow the manufacturers recommendations, use the correct wire size, tie down all wires properly (this is a VERY important step - anticipate that wire bundles will be vibrating and shaking, and apply appropriate countermeasures to minimize the transmitted forces), tighten everything to spec, and I suspect that you won't see a whole lot of problems.

-dave


.
__________________
"I know what you're thinking, punk," hissed Wordy Harry to his new editor, "you're thinking, 'Did he use six superfluous adjectives or only five?' - and to tell the truth, I forgot myself in all this excitement; but being as this is English, the most powerful language in the world, whose subtle nuances will blow your head clean off, you've got to ask yourself one question: 'Do I feel loquacious?' - well do you, punk?"
- Stuart Vasepuru, 2006 Bulwer-Lytton Fiction Contest



My OTHER CAR is still on Mars!!!
  #19   Spotlight this post!  
Unread 12-08-2008, 11:10
RyanN's Avatar
RyanN RyanN is offline
RyanN
AKA: Ryan Nazaretian
FRC #4901 (Garnet Squadron)
Team Role: Mentor
 
Join Date: Jun 2006
Rookie Year: 2005
Location: Columbia, SC
Posts: 1,126
RyanN has a reputation beyond reputeRyanN has a reputation beyond reputeRyanN has a reputation beyond reputeRyanN has a reputation beyond reputeRyanN has a reputation beyond reputeRyanN has a reputation beyond reputeRyanN has a reputation beyond reputeRyanN has a reputation beyond reputeRyanN has a reputation beyond reputeRyanN has a reputation beyond reputeRyanN has a reputation beyond repute
Re: 2009 Distribution Block

We never had any issues with the Rockwell PD Blocks. Although the screws did start to back off after a while, or maybe the wire was shifting around a little, we never did lose power, and all we did was tighten the screws more. After one tightening, all was well.

Also, I'd imagine that the smaller wire sizes will make a difference with how they're secured. I've never had any issue with smaller wires coming out of this compression type of connection. There's a right wire size for every hole. If the new PD block manufactures did their homework, then I believe everything will go well.
__________________
Garnet Squadron
FRC 4901
Controls Mentor
@rnazaretian

Previous mentor and student from Team Fusion, FRC 364
  #20   Spotlight this post!  
Unread 12-08-2008, 14:42
Cory's Avatar
Cory Cory is offline
Registered User
AKA: Cory McBride
FRC #0254 (The Cheesy Poofs)
Team Role: Engineer
 
Join Date: May 2002
Rookie Year: 2001
Location: Redwood City, CA
Posts: 6,807
Cory has a reputation beyond reputeCory has a reputation beyond reputeCory has a reputation beyond reputeCory has a reputation beyond reputeCory has a reputation beyond reputeCory has a reputation beyond reputeCory has a reputation beyond reputeCory has a reputation beyond reputeCory has a reputation beyond reputeCory has a reputation beyond reputeCory has a reputation beyond repute
Send a message via AIM to Cory
Re: 2009 Distribution Block

We never had an issue with the Rockell PDB other than it being massive and the fact that we loved the IFI breaker board.

One of the reasons is probably that we used 4 gauge wire instead of 6.

It seemed like too many teams who really know what they are doing *did* have trouble, though.
__________________
2001-2004: Team 100
2006-Present: Team 254
  #21   Spotlight this post!  
Unread 12-08-2008, 15:12
artdutra04's Avatar
artdutra04 artdutra04 is offline
VEX Robotics Engineer
AKA: Arthur Dutra IV; NERD #18
FRC #0148 (Robowranglers)
Team Role: Engineer
 
Join Date: Mar 2005
Rookie Year: 2002
Location: Greenville, TX
Posts: 3,078
artdutra04 has a reputation beyond reputeartdutra04 has a reputation beyond reputeartdutra04 has a reputation beyond reputeartdutra04 has a reputation beyond reputeartdutra04 has a reputation beyond reputeartdutra04 has a reputation beyond reputeartdutra04 has a reputation beyond reputeartdutra04 has a reputation beyond reputeartdutra04 has a reputation beyond reputeartdutra04 has a reputation beyond reputeartdutra04 has a reputation beyond repute
Re: 2009 Distribution Block

Quote:
Originally Posted by Hachiban VIII View Post
This one uses screws to clamp down the leads... the same method the Rock-fail-well Distro' block used Those screws always came loose.
Perhaps someone who knows more about this can help me here, but is it possible to use split lock washers [between the top of the crimp connector and the bottom of the screw head - e.g. not between the main contact area of the connector and the terminal strip] on terminal strips to help prevent the screws from backing out?

EDIT: Thanks Al.
__________________
Art Dutra IV
Robotics Engineer, VEX Robotics, Inc., a subsidiary of Innovation First International (IFI)
Robowranglers Team 148 | GUS Robotics Team 228 (Alumni) | Rho Beta Epsilon (Alumni) | @arthurdutra

世上无难事,只怕有心人.

Last edited by artdutra04 : 12-08-2008 at 15:20.
  #22   Spotlight this post!  
Unread 12-08-2008, 15:17
Unsung FIRST Hero
Al Skierkiewicz Al Skierkiewicz is offline
Broadcast Eng/Chief Robot Inspector
AKA: Big Al WFFA 2005
FRC #0111 (WildStang)
Team Role: Engineer
 
Join Date: Jun 2001
Rookie Year: 1996
Location: Wheeling, IL
Posts: 10,770
Al Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond repute
Re: 2009 Distribution Block

Quote:
Originally Posted by artdutra04 View Post
Perhaps someone who knows more about this can help me here, but is it possible to use split lock washers [between the top of the crimp connector and the bottom of the screw head - e.g. not between the main contact area of the connector and the terminal strip] on terminal strips to help prevent the screws from backing out?
Art,
I am guessing you are asking about the new PD panel. I believe the intent is to ship with a nut designed for the power studs. (I don't have time to go look up the spec sheet, but I think they are metric) As I remember, that nut has built in anti-back thread so that it won't come loose. In any installation, some method of locking the turning device is recommended. Also, plan on securing the wiring so that it won't be distrubed when changing batteries.
__________________
Good Luck All. Learn something new, everyday!
Al
WB9UVJ
www.wildstang.org
________________________
Storming the Tower since 1996.
  #23   Spotlight this post!  
Unread 12-08-2008, 16:00
=Martin=Taylor= =Martin=Taylor= is offline
run the trap!!!
FRC #0100 (The Wild Hat Society)
Team Role: Human Player
 
Join Date: Feb 2006
Rookie Year: 2005
Location: Bezerkeley, California
Posts: 1,255
=Martin=Taylor= has a reputation beyond repute=Martin=Taylor= has a reputation beyond repute=Martin=Taylor= has a reputation beyond repute=Martin=Taylor= has a reputation beyond repute=Martin=Taylor= has a reputation beyond repute=Martin=Taylor= has a reputation beyond repute=Martin=Taylor= has a reputation beyond repute=Martin=Taylor= has a reputation beyond repute=Martin=Taylor= has a reputation beyond repute=Martin=Taylor= has a reputation beyond repute=Martin=Taylor= has a reputation beyond repute
Re: 2009 Distribution Block

Quote:
Originally Posted by dlavery View Post
Although not necessarily a fan of the Rockwell distribution block because of its size, we had no complaints about its performance. We followed the manufacturers directions regarding wire prep. All inbound wires were secured with strain reliefs. We used wires of the appropriate gauge size, and left the ends loose (unsoldered). As a result, we never had a problem with wires working loose from the block during the entire season. We checked the clamp screws periodically to see if there was an issue, but found that they never worked loose and did not need to be retightened.

This is very good advice. Thank you. I'll remind the electrical people to actually read the manual next time

For the record, it never gave us any trouble either, but sometimes when we checked it we found that one of the wires was falling out

What method do teams use to secure the wires prior to entering the block?
__________________
"Cooperation; because life is a team sport"
-Philip J. Fry
  #24   Spotlight this post!  
Unread 12-08-2008, 18:06
ATannahill ATannahill is online now
Registered User
AKA: Alex Tannahill
no team
 
Join Date: Feb 2008
Rookie Year: 2008
Location: Southfield, Michigan
Posts: 3,257
ATannahill has a reputation beyond reputeATannahill has a reputation beyond reputeATannahill has a reputation beyond reputeATannahill has a reputation beyond reputeATannahill has a reputation beyond reputeATannahill has a reputation beyond reputeATannahill has a reputation beyond reputeATannahill has a reputation beyond reputeATannahill has a reputation beyond reputeATannahill has a reputation beyond reputeATannahill has a reputation beyond repute
Re: 2009 Distribution Block

I am a great wire maker (cutting, stripping and crimping) so i am not fond of the PD block used the past two years. But going with the team tradition of needing to bend an instrument before the screw turns, we had no problem keeping the wires in. I am also sad to see crimping being reduced so much.
  #25   Spotlight this post!  
Unread 12-08-2008, 19:50
EricVanWyk EricVanWyk is offline
Registered User
no team
 
Join Date: Jan 2007
Rookie Year: 2000
Location: Boston
Posts: 1,597
EricVanWyk has a reputation beyond reputeEricVanWyk has a reputation beyond reputeEricVanWyk has a reputation beyond reputeEricVanWyk has a reputation beyond reputeEricVanWyk has a reputation beyond reputeEricVanWyk has a reputation beyond reputeEricVanWyk has a reputation beyond reputeEricVanWyk has a reputation beyond reputeEricVanWyk has a reputation beyond reputeEricVanWyk has a reputation beyond reputeEricVanWyk has a reputation beyond repute
Send a message via AIM to EricVanWyk
Re: 2009 Distribution Block

Quote:
Originally Posted by rtfgnow View Post
I am also sad to see crimping being reduced so much.
Wow. I just lost a $20 bet.
  #26   Spotlight this post!  
Unread 12-08-2008, 20:46
waialua359's Avatar
waialua359 waialua359 is offline
Mentor
AKA: Glenn
FRC #0359 (Hawaiian Kids)
Team Role: Mentor
 
Join Date: Apr 2003
Rookie Year: 2000
Location: Waialua, HI
Posts: 3,298
waialua359 has a reputation beyond reputewaialua359 has a reputation beyond reputewaialua359 has a reputation beyond reputewaialua359 has a reputation beyond reputewaialua359 has a reputation beyond reputewaialua359 has a reputation beyond reputewaialua359 has a reputation beyond reputewaialua359 has a reputation beyond reputewaialua359 has a reputation beyond reputewaialua359 has a reputation beyond reputewaialua359 has a reputation beyond repute
Re: 2009 Distribution Block

finally got a chance to look at Bilfred's post. Looks great!
The 07 and 08 ones were terrible. It was a couple of extra stages and space taken up we didnt need.
Looked more like car stereo ones.
__________________

2016 Hawaii Regional #1 seed, IDesign, Safety Award
2016 NY Tech Valley Regional Champions, #1 seed, Innovation in Controls Award
2016 Lake Superior Regional Champions, #1 seed, Quality Award, Dean's List
2015 FRC Worlds-Carver Division Champions
2015 Hawaii Regional Champions, #1 seed.
2015 Australia Regional Champions, #2 seed, Engineering Excellence Award
2015 Inland Empire Regional Champions, #1 seed, Industrial Design Award
2014 OZARK Mountain Brawl Champions, #1 seed.
2014 Hawaii Regional Champions, #1 seed, UL Safety Award
2014 Dallas Regional Champions, #1 seed, Engineering Excellence Award
2014 Northern Lights Regional Champions, #1 seed, Entrepreneurship Award
2013 Championship Dean's List Winner
2013 Utah Regional Champion, #1 seed, KP&B Award, Deans List
2013 Boilermaker Regional Champion, #1 seed, Motorola Quality Award
2012 Lone Star Regional Champion, #1 seed, Motorola Quality Award
2012 Hawaii Regional Champions #1 seed, Motorola Quality Award
  #27   Spotlight this post!  
Unread 12-08-2008, 20:50
Unsung FIRST Hero
Al Skierkiewicz Al Skierkiewicz is offline
Broadcast Eng/Chief Robot Inspector
AKA: Big Al WFFA 2005
FRC #0111 (WildStang)
Team Role: Engineer
 
Join Date: Jun 2001
Rookie Year: 1996
Location: Wheeling, IL
Posts: 10,770
Al Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond repute
Re: 2009 Distribution Block

Quote:
Originally Posted by EricVanWyk View Post
Wow. I just lost a $20 bet.
Erik,
We can't let that go! Do tell?!?

Also, are the PDs shipping with hardware and are the studs metric?
__________________
Good Luck All. Learn something new, everyday!
Al
WB9UVJ
www.wildstang.org
________________________
Storming the Tower since 1996.
  #28   Spotlight this post!  
Unread 12-08-2008, 21:46
EricVanWyk EricVanWyk is offline
Registered User
no team
 
Join Date: Jan 2007
Rookie Year: 2000
Location: Boston
Posts: 1,597
EricVanWyk has a reputation beyond reputeEricVanWyk has a reputation beyond reputeEricVanWyk has a reputation beyond reputeEricVanWyk has a reputation beyond reputeEricVanWyk has a reputation beyond reputeEricVanWyk has a reputation beyond reputeEricVanWyk has a reputation beyond reputeEricVanWyk has a reputation beyond reputeEricVanWyk has a reputation beyond reputeEricVanWyk has a reputation beyond reputeEricVanWyk has a reputation beyond repute
Send a message via AIM to EricVanWyk
Re: 2009 Distribution Block

Quote:
Originally Posted by Al Skierkiewicz View Post
Eric,
We can't let that go! Do tell?!?

Also, are the PDs shipping with hardware and are the studs metric?
I bet that no one would ever miss crimping, as it is one of the major sources of faults in the power system. A single poor crimp can and will take down a robot spectacularly. Personally, I've been wanting to remove failure modes since I started back in high school.
  #29   Spotlight this post!  
Unread 12-08-2008, 23:51
Unsung FIRST Hero
Greg Marra Greg Marra is offline
[automate(a) for a in tasks_to_do]
FRC #5507 (Robotic Eagles)
Team Role: Mentor
 
Join Date: Oct 2004
Rookie Year: 2005
Location: San Francisco, CA
Posts: 2,030
Greg Marra has a reputation beyond reputeGreg Marra has a reputation beyond reputeGreg Marra has a reputation beyond reputeGreg Marra has a reputation beyond reputeGreg Marra has a reputation beyond reputeGreg Marra has a reputation beyond reputeGreg Marra has a reputation beyond reputeGreg Marra has a reputation beyond reputeGreg Marra has a reputation beyond reputeGreg Marra has a reputation beyond reputeGreg Marra has a reputation beyond repute
Re: 2009 Distribution Block

Quote:
Originally Posted by EricVanWyk View Post
I bet that no one would ever miss crimping, as it is one of the major sources of faults in the power system. A single poor crimp can and will take down a robot spectacularly. Personally, I've been wanting to remove failure modes since I started back in high school.
Next thing you know they'll take away radio issues and popping the main breaker!
  #30   Spotlight this post!  
Unread 13-08-2008, 01:36
=Martin=Taylor= =Martin=Taylor= is offline
run the trap!!!
FRC #0100 (The Wild Hat Society)
Team Role: Human Player
 
Join Date: Feb 2006
Rookie Year: 2005
Location: Bezerkeley, California
Posts: 1,255
=Martin=Taylor= has a reputation beyond repute=Martin=Taylor= has a reputation beyond repute=Martin=Taylor= has a reputation beyond repute=Martin=Taylor= has a reputation beyond repute=Martin=Taylor= has a reputation beyond repute=Martin=Taylor= has a reputation beyond repute=Martin=Taylor= has a reputation beyond repute=Martin=Taylor= has a reputation beyond repute=Martin=Taylor= has a reputation beyond repute=Martin=Taylor= has a reputation beyond repute=Martin=Taylor= has a reputation beyond repute
Re: 2009 Distribution Block

Quote:
Originally Posted by Greg Marra View Post
Next thing you know they'll take away radio issues and popping the main breaker!
I thought they were keeping the old breaker? It made a handy on/off switch

No more radios though! (not sure about issues...)
__________________
"Cooperation; because life is a team sport"
-Philip J. Fry
Closed Thread


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
pic: 2009 Distribution Block Billfred FRC Control System 16 22-04-2008 17:16
distribution block Magnechu Electrical 11 14-02-2008 19:07
Distribution Block Magnechu Electrical 3 04-02-2008 21:38
Stinger Fuse Block and Power Distribution Block Don Wright Electrical 2 30-03-2004 10:45
Anyone knowwhere to buy maxi block distribution block? BrianB Kit & Additional Hardware 0 23-01-2003 12:46


All times are GMT -5. The time now is 10:00.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi