|
|
|
![]() |
|
|||||||
|
||||||||
|
|
Thread Tools | Rate Thread | Display Modes |
|
#10
|
|||
|
|||
|
Re: 12 inches ??
Posted by Joe Ross at 1/12/2001 2:46 AM EST
Engineer on team #330, Beach Bot 2001, from Hope Chapel Academy and NASA/JPL and J&F Machine. In Reply to: 12 inches ?? Posted by Justin Ridley on 1/12/2001 1:17 AM EST: : PS: We're gonna do it, 12" inches or not ![]() So are we (but not necessarily all the time). We assumed that the 18" figure is to the top of the schedule 40 pipe. The diameter of the pipe is 1 5/8" (the 1 1/4" figure is only inside diameter). There is also a 4x4 on the ground, which is really 3.5" x 3.5". This works out so that the gap is 12.875" Joe Ross Beach Bot 2001, team 330 |
| Thread Tools | |
| Display Modes | Rate This Thread |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| What is allowable contact with the lexan rail on the ramp? | Randy Ai | Rules/Strategy | 1 | 06-01-2003 17:17 |
| Area next to ramp? | Scott358 | General Forum | 14 | 06-01-2003 13:13 |
| over/under the rail | archiver | 2001 | 8 | 24-06-2002 01:03 |
| controversial opinion? | archiver | 1999 | 11 | 23-06-2002 23:15 |
| Field and shelf missing dimensions | kmcclary | Off-Season Events | 3 | 12-10-2001 18:21 |