|
|
|
![]() |
|
|||||||
|
||||||||
|
|
Thread Tools |
Rating:
|
Display Modes |
|
#9
|
||||
|
||||
|
Re: **FIRST EMAIL**/ FRC 2009 Control System Early Release Update
Quote:
UPDATE: At a LabVIEW seminar today, I found out that we will NOT be receiving 8.6 in the kit in January. A NI instructor stated that since 8.6 was just released in August, for "stability assurance reasons" we all will be receiving a "FIRST Labeled Version" of 8.5.1 in the kit. (They consider 8.5.1 to be "very stable".) It is still OK to load up the 8.6 Eval now though, and develop code in it throughout the fall. There's a "save as" option which allows you to save anything developed in 8.6 in the 8.5 file format. That will allow you to use it with the KoP version of LabVIEW. - Keith |
| Thread Tools | |
| Display Modes | Rate This Thread |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| 2009 FRC Control System Forums Open now | BornaE | FRC Control System | 7 | 01-10-2008 19:02 |
| **FIRST EMAIL**/FIRST Scholarship Early March Update | Mark McLeod | FIRST E-Mail Blast Archive | 5 | 18-04-2008 02:40 |
| **FIRST EMAIL**/Early Team Update #15 - Rule Intent | Mark McLeod | FIRST E-Mail Blast Archive | 3 | 06-03-2008 15:27 |
| **FIRST EMAIL**/FRC Robot Control System Survey | Mark McLeod | FIRST E-Mail Blast Archive | 4 | 11-09-2007 00:45 |
| **FIRST EMAIL**/Special Early Offers for 2007 FRC Teams | Rich Wong | FIRST E-Mail Blast Archive | 0 | 02-11-2006 17:16 |