|
|
|
![]() |
|
|||||||
|
||||||||
|
|
Thread Tools | Rate Thread | Display Modes |
|
#1
|
||||
|
||||
|
2009 controls system pre-ship
I understand that First plans to ship the new control systems (to teams that requested it) by early December. My question is, what will they ship? I assume the CRIO at the minimum, but what about the driver's station? Will they ship an Ethernet camera? How about all the required peripheral stuff, like the power distribution block, sidecars, wireless access point etc? Does anybody know?
Last edited by martin417 : 21-10-2008 at 12:09. |
| Thread Tools | |
| Display Modes | Rate This Thread |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Pre-Ship Scrimmage | neoshaakti | Fundraising | 10 | 26-06-2008 12:53 |
| batteries,controls, why ship | johnr | General Forum | 17 | 07-02-2007 20:59 |
| Our pre ship | Timmyd | Off-Season Events | 6 | 21-02-2005 14:22 |
| Pre-Ship Competition in southern WI | joe_balint | Off-Season Events | 2 | 07-02-2002 20:42 |
| Pre-Ship party in Indiana | Wayne Doenges | General Forum | 0 | 21-01-2002 16:08 |