|
|
|
![]() |
|
|||||||
|
||||||||
![]() |
| Thread Tools | Rate Thread | Display Modes |
|
#1
|
||||
|
||||
|
Draft KOP Checklist for Control System revealed
Check out this post on Bill's Blog..regarding the early shipment of the control system. There is a link to the
Draft 2009 KOP Checklist for the early shipment of the control system http://frcdirector.blogspot.com/2008...ol-system.html Lots of good stuff... cRIO of course and its components but also a camera, joysticks, Jaguar Motor Controllers, a single Victor Motor Controller, etc.. Check it out!!! |
|
#2
|
|||||
|
|||||
|
Re: Draft KOP Checklist for Control System revealed
It comes with a screwdriver!
Wetzel |
|
#3
|
|||
|
|||
|
Re: Draft KOP Checklist for Control System revealed
It only looks like, feels like, smells like, works like, and is like a screwdriver. Actually, it is a WAGO TOOL. This wonderful item grants you access to the magic of the PD's output connectors.
|
|
#4
|
||||
|
||||
|
Re: Draft KOP Checklist for Control System revealed
I searched the Jaguar part number and it looks like it will be available from Mouser soon!
http://parts.digikey.com/1/parts/1604184-mod-brushed-dc-motor-ctrl-w-can-mdl-bdc-b.html Currently they are listed at $98.50 per controller with a minimum quantity of 20, and estimated availability on December 12. I would imagine they would discount that price a little more for FIRST teams though. |
|
#5
|
|||||
|
|||||
|
Re: Draft KOP Checklist for Control System revealed
Quote:
Wetzel |
|
#6
|
||||
|
||||
|
Re: Draft KOP Checklist for Control System revealed
Here is an actual page having info about the Jaguar specifically for FIRST teams.
http://www.luminarymicro.com/jaguar |
|
#7
|
|||||
|
|||||
|
Re: Draft KOP Checklist for Control System revealed
I find it very frustrating that FIRST has not yet announced pricing of a second control system. We are quickly approaching the start of the season, and the cost of the controller will determine whether many teams are able to build practice robots or not.
|
|
#8
|
|||||
|
|||||
|
Re: Draft KOP Checklist for Control System revealed
Quote:
I know my team priced out the cRIO modules at cost from the NI website and has budgeted for a second one at that price while hoping it wouldn't cost that much. There are so many kids involved this year the lead mentors don't know what to do other than build two bots. Wetzel |
![]() |
| Thread Tools | |
| Display Modes | Rate This Thread |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Inspection Checklist Draft Available | Yan Wang | General Forum | 1 | 26-02-2004 20:14 |
| **IMPORTANT FIRST BLAST**/2004 KOP Checklist Deadline Extension Correction | miketwalker | FIRST E-Mail Blast Archive | 0 | 16-01-2004 16:02 |
| **IMPORTANT FIRST BLAST**/2004 KOP Checklist Deadline Extension | miketwalker | FIRST E-Mail Blast Archive | 3 | 16-01-2004 15:54 |
| Will buy used Control System for... | archiver | 2000 | 0 | 23-06-2002 22:52 |
| Will buy used Control System for... | archiver | 2000 | 1 | 23-06-2002 22:51 |