Go to Post A VERY credible statement ... coming from a 400-pound Pooh Bear - Rich Kressly [more]
Home
Go Back   Chief Delphi > Technical > Control System > FRC Control System
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
 
 
Thread Tools Rate Thread Display Modes
Prev Previous Post   Next Post Next
  #15   Spotlight this post!  
Unread 24-11-2008, 13:10
Dave Flowerday Dave Flowerday is offline
Software Engineer
VRC #0111 (Wildstang)
Team Role: Engineer
 
Join Date: Feb 2002
Rookie Year: 1995
Location: North Barrington, IL
Posts: 1,366
Dave Flowerday has a reputation beyond reputeDave Flowerday has a reputation beyond reputeDave Flowerday has a reputation beyond reputeDave Flowerday has a reputation beyond reputeDave Flowerday has a reputation beyond reputeDave Flowerday has a reputation beyond reputeDave Flowerday has a reputation beyond reputeDave Flowerday has a reputation beyond reputeDave Flowerday has a reputation beyond reputeDave Flowerday has a reputation beyond reputeDave Flowerday has a reputation beyond repute
Re: New Info on 2009 control system, maybe

Quote:
Originally Posted by Mike Soukup View Post
Ridiculous.

We used the 1 byte display on the IFI controller for quick pot calibration in the pits and at our practice field and for feedback about our autonomous programs. Now our drivers will have to hook up a laptop instead? Bad move FIRST.
Sounds like the driver's station is a real mess. Check out the thread that Joe Ross posted on the FIRST forums. When a joystick is unplugged, the controller keeps sending the old value! Clearly, they were more concerned with whiz-bang features on this system than basic safety. As a counter-example, IFI design IN HARDWARE a mechanism that if a joystick was unplugged, the output went to a safe value (so you know they were thinking about it from the outset). I grow increasingly concerned that safety seems to be an afterthought with the new system. We're dealing with such dangerous machines here - many people trust the control system to keep them safe. Joe mentioned a 2-second lag that sometimes occurs. Does this affect the robot disable signal as well?

Scary stuff. I once again suggest that everyone keep their bodies well clear of any robot powered by the new system whenever it is turned on. No more trusting the disable switch until the new system proves it is safe (which it clearly isn't right now).

To say I'm disappointed that they'd ship a system with these types of safety defects is an understatement.
Reply With Quote
 


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
2009 Control System wedellm FRC Control System 11 23-11-2008 22:38
2009 Control System Layout Mark McLeod FRC Control System 36 23-11-2008 11:39
NEW 2009 Control System Released qnetjoe FRC Control System 296 15-08-2008 15:02
pic: 2009 Control System, Mounted Billfred FRC Control System 23 01-05-2008 19:02
2009 Control System Possibility? Racer26 Rumor Mill 121 25-04-2008 09:05


All times are GMT -5. The time now is 23:19.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi