|
|
|
![]() |
|
|||||||
|
||||||||
| Thread Tools | Rate Thread | Display Modes |
|
#1
|
|||
|
|||
|
Metal strips on ends of bridge
Posted by Mike Fenton at 1/24/2001 7:33 PM EST
Engineer on team #121, Rhode Warrior, from Middletown High School and NUWC. i looked at the dwgs and it seems that the 5 inch metal strips hang over the platform ends by 3 inches. Does the part attached to the plywood go over the carpet or under the carpet? |
|
#2
|
|||
|
|||
|
Re: Metal strips on ends of bridge
Posted by Brian at 1/24/2001 7:59 PM EST
Student on team #56, Robbe Xtreme, from Bound Brook High School and Ethicon Inc.. In Reply to: Metal strips on ends of bridge Posted by Mike Fenton on 1/24/2001 7:33 PM EST: It goes over the carpet |
|
#3
|
|||
|
|||
|
update 5... metal strip hanging out longer
Posted by Ken Leung at 1/25/2001 5:10 AM EST
Student on team #192, Gunn Robotics Team, from Henry M. Gunn Senior High School. In Reply to: Metal strips on ends of bridge Posted by Mike Fenton on 1/24/2001 7:33 PM EST: According to team update 5, the metal strips are hanging out 4 inches from the platform ends instead of 3inches. |
| Thread Tools | |
| Display Modes | Rate This Thread |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Curie Division Robots information... (not complete) | archiver | 2001 | 3 | 06-24-2002 03:13 AM |
| Team 111 Picture | archiver | 2001 | 18 | 06-24-2002 12:50 AM |
| Wedge and Solenoids | archiver | 2001 | 3 | 06-24-2002 12:17 AM |
| The bridge ... moves? | archiver | 2001 | 3 | 06-23-2002 11:04 PM |
| Using Base 36 "Compression" For Easier Scouting and Other Interesting Tidbits | Adrian Wong | Rules/Strategy | 9 | 09-21-2001 08:28 PM |