Go to Post The season ended. Not cool. - Koko Ed [more]
Home
Go Back   Chief Delphi > Competition > Rules/Strategy
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
 
 
Thread Tools Rate Thread Display Modes
Prev Previous Post   Next Post Next
  #6   Spotlight this post!  
Unread 20-01-2009, 14:00
ScottOliveira ScottOliveira is offline
Registered User
FRC #3455 (Carpe Robotum)
Team Role: Mentor
 
Join Date: Feb 2008
Rookie Year: 2006
Location: McLean, VA
Posts: 133
ScottOliveira is just really niceScottOliveira is just really niceScottOliveira is just really niceScottOliveira is just really niceScottOliveira is just really nice
Re: Old control box

We need more information about the control box. If it is not a COTS part then refer to rule R24.

Quote:
<R24>
Prior to the Kick-off: Before the formal start of the Robot Build Season, teams are encouraged to think as much as they please about their ROBOTS. They may develop prototypes, create proof-of-concept models, and conduct design exercises. Teams may gather all the raw stock materials and COTS COMPONENTS they want. But absolutely no final design, fabrication, or assembly of any elements intended for the final ROBOT is permitted prior to the Kick-off presentation.
•
Example: A TEAM designs and builds a two-speed shifting transmission during the fall as a training exercise. When designing their competition ROBOT, they utilize all the design principles they learned. To optimize the transmission design for their ROBOT, they improve the transmission gear ratios and reduce the size, and build two new transmissions, and place them on the ROBOT. All parts of this process are permitted activities.
•
Example: The same TEAM realizes that the transmission designed and built in the fall perfectly fits their need for a transmission to drive the ROBOT arm. They build a copy of the transmission from the original design plans, and bolt it to the ROBOT. This would be prohibited, as the transmission – although fabricated during the competition season – was built from detailed designs developed prior to kick-off.
•
Example: A TEAM developed an omni-directional drive system for the 2008 competition. Over the summer they refined and improved the control software (written in C) to add copied large sections of unmodified code over into the control software of the new ROBOT (also written in C). This would be a violation of the schedule constraint, and would not be allowed.
•
Example: The same TEAM decides to use the LabView as their software environment for 2009. Following kickoff, they use the previously-developed C code as a reference for the algorithms and calculations required to implement their omni-directional control solution. Because they developed new LabView code as they ported over their algorithms, this would be permitted.
•
Example: A different team develops a similar solution during the fall, and plans to use the developed software on their competition ROBOT. After completing the software, they post it in a generally accessible public forum and make the code available to all teams. Because they have made their software generally available, under the terms of Rule <R65> it is considered COTS software and they can use it on their ROBOT.

Or you can reference the simpler explanation of rule R33.
Quote:
<R33>
FABRICATED ITEMS from ROBOTS entered in previous FIRST competitions shall not be used on ROBOTS in the 2009 competition.
 


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
control box cloud_254 Technical Discussion 2 13-02-2008 19:05
Control Box Dimensions Zultraranger General Forum 7 11-02-2008 21:41
Custom Control Box D.Viddy Programming 3 15-02-2003 11:35
Box Control Tton General Forum 2 12-02-2003 23:38
control box archiver 2000 8 24-06-2002 00:20


All times are GMT -5. The time now is 01:31.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi