|
|
|
![]() |
|
|||||||
|
||||||||
|
|
Thread Tools | Rate Thread | Display Modes |
|
#7
|
|||
|
|||
|
Re: Week 4 - Building The Crate
Hello All,
I have enclosed an estimative for the Crate #1 mentioned by Squirrel, it comes about at $87.50 Team 135 brings a good point about "...being able to open and close the crate multiple times without compromising the integrity..." Does anyone have a list of material to make a "door" for a crate ? If someone post the material necessary, I will go get an estimate for a Crate in which I will creatively call Crate #2. Last edited by xitaqua : 27-01-2009 at 16:07. |
| Thread Tools | |
| Display Modes | Rate This Thread |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Building the FRC Crate | guyserman82 | General Forum | 20 | 05-12-2008 21:08 |
| **FIRST EMAIL**/"Building the Crate; Shipping the Robot" Teleconference | KathieK | FIRST E-Mail Blast Archive | 0 | 05-02-2008 14:58 |
| the size of the shipping crate, the maximum dimensions?????????? | MASherry | General Forum | 5 | 13-01-2004 22:30 |
| FIRST to reduce 6-week building period to 5-week | archiver | 2001 | 12 | 24-06-2002 01:27 |
| Help on crate/cart building | archiver | 2000 | 4 | 23-06-2002 22:06 |