|
|
|
![]() |
|
|||||||
|
||||||||
|
|
Thread Tools | Rate Thread | Display Modes |
|
#12
|
|||||
|
|||||
|
Re: Week 4 - Building The Crate
It is a matter of design, not material. I do not see a need for a hinged door, so I have not designed a crate with one. Maybe someone with a crated designed for an opening door will speak up?
|
| Thread Tools | |
| Display Modes | Rate This Thread |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Building the FRC Crate | guyserman82 | General Forum | 20 | 05-12-2008 21:08 |
| **FIRST EMAIL**/"Building the Crate; Shipping the Robot" Teleconference | KathieK | FIRST E-Mail Blast Archive | 0 | 05-02-2008 14:58 |
| the size of the shipping crate, the maximum dimensions?????????? | MASherry | General Forum | 5 | 13-01-2004 22:30 |
| FIRST to reduce 6-week building period to 5-week | archiver | 2001 | 12 | 24-06-2002 01:27 |
| Help on crate/cart building | archiver | 2000 | 4 | 23-06-2002 22:06 |