|
|
|
![]() |
|
|||||||
|
||||||||
![]() |
| Thread Tools |
Rating:
|
Display Modes |
|
#1
|
||||
|
||||
|
What would you do if build were longer?
Imagine that instead of six weeks, FIRST gave us two months. Or three months. Or a year.
Now, the actual amount of time given isn't what matters though, its what you would do with it. Would you spent more time designing or prototyping? What about building? Or debugging code? Or more driver practice? What would you do with more time to build? (I'm not pro longer-build-season, I'm just wondering) |
|
#2
|
||||
|
||||
|
Re: What would you do if build were longer?
It would allow us to get more advanced machining done, do prototyping on a whole different level, and get some really good driver practice.
The big thing that the longer build season would do for us is we would be able to explore more of the "wilder" ideas that come up during brainstorming that we don't think wouldn't work, but sure enough we see a similar idea working on a robot during a competition. |
|
#3
|
||||
|
||||
|
Re: What would you do if build were longer?
I would sleep. (: Just kidding... no one sleeps during build season. I would probably put a little bit more time into every part of the process- they are all very important to a final outcome. I would say the thing that always gets pushed aside for too long is the code, so a longer build season would make sure that gets the attention that it deserves. More driver practice would also be great. And yeah... now that I think about it, sleeping sounds great.
I like the fact that there are only six weeks, though. It forces us to be creative and to use our time wisely. It also mirrors "real-world" engineering projects where deadlines are very important. |
|
#4
|
|||||
|
|||||
|
Re: What would you do if build were longer?
I think there would be more students flunking out of school, mentor divorces, etc....
Having an impossible schedule is a benefit, it drives teams to work hard! |
|
#5
|
||||
|
||||
|
Re: What would you do if build were longer?
I would use 6 weeks to build the robot. Then after that my team would work on a time machine.
|
|
#6
|
||||
|
||||
|
Re: What would you do if build were longer?
(for 2009's game)we would have probobly built our robot, then we would have made it better
...... |
|
#7
|
||||
|
||||
|
Re: What would you do if build were longer?
More prototyping, testing, and drive practice.
Specifically this year, if we had 2 more weeks we'd be building a crab drive chassis instead of our 4 wheel chassis. |
|
#8
|
|||||
|
|||||
|
Re: What would you do if build were longer?
Everything on our bot would be machined (even more than it is now). But in all honesty, more driver practice and more performance tweaking. Also, I wouldn't be doing two months of hw right now
![]() |
|
#9
|
|||||
|
|||||
|
Re: What would you do if build were longer?
If it were longer, I'd be redesigning, raiding ideas, etc...
However, there is a reason it's only 6 weeks. Woodie was once asked "Why do we only get 6 weeks?" at Kickoff. (This when they had a Q&A session instead of the game show...) His response? "We wanted to make it easier for the rookies." Or something to that effect. The reasoning given was: Rookie team gets the game and kit. They build a robot in 3 weeks. They see another robot that looks better, redesign, and spend the next 3 weeks rebuilding. Repeat the cycle until you run out of time. You cut it at 6 weeks, they aren't stuck in the cycle more than once. |
|
#10
|
||||
|
||||
|
Re: What would you do if build were longer?
A lot more prototyping, a lot more care put into manufacturing parts, probably sending off CAD files to get some parts milled, and more homework.
|
|
#11
|
||||
|
||||
|
Re: What would you do if build were longer?
We would probably finish and drive our robot BEFORE it's shipped.
|
|
#12
|
|||||
|
|||||
|
Re: What would you do if build were longer?
Quote:
![]() |
|
#13
|
|||||
|
|||||
|
Re: What would you do if build were longer?
+1
We haven't done this for the last two years, but I'm sure it'll happen again sometime. We wont spend 48 hours in a row (just about) finishing it before shipping. |
|
#14
|
||||
|
||||
|
Re: What would you do if build were longer?
Quote:
I would hope our team would probably mostly make use of extra time programming, though I fear we might use it mostly for building. |
|
#15
|
|||||
|
|||||
|
Re: What would you do if build were longer?
I would probably use more of the time to do my homework. Procrastination is good for now though, I'll get caught up later.
|
![]() |
| Thread Tools | |
| Display Modes | Rate This Thread |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| What Do You Wish You Would Have Known Your Rookie Year? | SlaminSwimster | General Forum | 77 | 16-12-2008 12:13 |
| What would you buy if you could? | IKE | Technical Discussion | 53 | 23-07-2008 15:56 |
| What would you do... | stuffssguy | General Forum | 8 | 22-02-2008 20:36 |
| what what would you like to see in a team website? | fimmel | Website Design/Showcase | 24 | 08-11-2006 08:32 |
| Speaking of T-Shirts... What size do you want if you were to trade? | Elgin Clock | General Forum | 0 | 08-01-2004 23:45 |