|
|
|
![]() |
|
|||||||
|
||||||||
![]() |
|
|
Thread Tools | Rate Thread | Display Modes |
|
|
|
#1
|
||||||
|
||||||
|
Re: Five weeks instead of six??
I would be fine with 5 weeks, Bring it on! I look at it as more of a challenge and it would it makes people push themselves even more.
I suspect that the change would not be as drastic as people think. It would just be a call to work more efficiently. Seriously folks I would bet that most teams have at least 3-4 "wasted" meetings where nothing gets done. Give us 5 weeks and we don't have that luxury. I fully support the change, bring it on! The 40lb allowance makes this even easier as you can keep working on 1/3 of your robot until the event. |
|
#2
|
||||
|
||||
|
Re: Five weeks instead of six??
I think a 5 week period would be a challenge for sure and I would think it would be a fun challenge given the game we have to build for is easy and simple enough to counteract the one less week.
But the game is never easy, never simple...and I'm quite sure in retrospect it wouldn't be fun. What would be fun is giving us an extra week and ask to build two robots. |
|
#3
|
|||||
|
|||||
|
Re: Five weeks instead of six??
Quote:
I recall previous years where we've missed at least a week or more of meetings around the middle of build without access to the shop (really busy would-be productive times). I can't imagine having that happen & be cut from 6 weeks (current time) to 5 in past years because of that, and now to 4 if that were to happen during a 5-week schedule. ![]() |
|
#4
|
||||
|
||||
|
Re: Five weeks instead of six??
I'll admit that I heard this rumor as well. The source explained it was due to kickoff being delayed AND some week regionals having dates already contracted. Since then I've heard from the same source that the shorter schedule is no longer going to happen.
I agree with those here that have already stated, wait for the official calendar. No use worrying about it until then. |
|
#5
|
||||
|
||||
|
Re: Five weeks instead of six??
I've determined that the only thing rumors are good for is putting your knickers in a twist.
|
|
#6
|
|||
|
|||
|
Re: Five weeks instead of six??
But it IS funny.
|
|
#7
|
|||||
|
|||||
|
Re: Five weeks instead of six??
Besides, what else is there to do???
We only have about elevendy-billion weeks before kick off... ![]() |
|
#8
|
||||
|
||||
|
Re: Five weeks instead of six??
|
|
#9
|
|||
|
|||
|
Re: Five weeks instead of six??
Watching people think they are true and get all worked up. Just like watching the game hint threads.
And in my defense Jane, I do NOT turn into an Eeyore! I am naturally that way. (Im assuming you meant that one way, if I am WAY off target here disregard the above comment) |
|
#10
|
|||
|
|||
|
Re: Five weeks instead of six??
Quote:
What ever happened the pushing the limits folks? If it is a true rumor, I'd love for it to be true. Bring it. |
|
#11
|
|||||
|
|||||
|
Re: Five weeks instead of six??
Quote:
|
|
#12
|
||||
|
||||
|
Re: Five weeks instead of six??
Quote:
![]() |
|
#13
|
|||||
|
|||||
|
Re: Five weeks instead of six??
Not when you have a full time job on the side.
Of course, the family would probably complain if one spent much more than the 85 hours a week at robotics (although my wife is very understanding and has done some robotics volunteering herself) and I can understand that. They feel left out. ![]() |
|
#14
|
|||
|
|||
|
Re: Five weeks instead of six??
I would hate if the build season became any shorter. My team is unorganized as it is, we have not finished a robot before ship since at least 2005, maybe earlier. Any shorter of a build period would pretty much destroy our chances.
I know of course the easy solution is to organize my team more, but that's a far more difficult task than one would think and I have yet to do. |
|
#15
|
|||
|
|||
|
Re: Five weeks instead of six??
Of course, if we tell the manufacturing group that it's only five weeks, the programmers get a whole week to work on the robot!
![]() |
![]() |
| Thread Tools | |
| Display Modes | Rate This Thread |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| FIRSTcast: Season 4 Episode 6 - Five weeks to go | Jeff Rodriguez | General Forum | 3 | 11-01-2009 22:33 |
| A Breakdown of the Six Weeks for Rookies | Wayne C. | General Forum | 10 | 13-01-2005 18:21 |
| Why Six Weeks? | Gabriel | General Forum | 20 | 22-02-2004 23:18 |
| How did YOU drive your team nuts these six weeks? | archiver | 2001 | 10 | 24-06-2002 01:13 |
| An idea for the 2000 games..(is six weeks enough?) | archiver | 1999 | 18 | 23-06-2002 23:17 |