|
|
|
![]() |
|
|||||||
|
||||||||
|
|
Thread Tools | Rate Thread | Display Modes |
|
#2
|
||||
|
||||
|
Re: Electrical CheckList
Is this for maintence between matches? I would mainly check that the pwm and power wires are connected. Breakers and wire guages are rearely effected during a match.
If you are more geared towards a pre-inspection lookover, than be sure that the rules laid down about wire gauge and breaker sizes are followed, check that batteries are taped at the terminals and that you are not grounded into the robot, and that there are no jumpers on the sidecar that shouldn't be. These are very general instructions. Making a checklist and bringing it to competition can be helpful. |
| Thread Tools | |
| Display Modes | Rate This Thread |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| KoP checklist | scirobotics | General Forum | 3 | 04-01-2009 10:44 |
| Pre-match Checklist | scottydoh | General Forum | 21 | 26-03-2008 16:27 |
| Tools Checklist | aksimhal | General Forum | 2 | 20-02-2007 21:25 |
| Robot Inspection Checklist | ChuckDickerson | Technical Discussion | 2 | 16-02-2006 21:30 |
| Checklist | Francis-134 | Rules/Strategy | 1 | 16-02-2003 17:51 |