Go to Post I feel like watching match videos from 2003 could be considered a form of cruel and unusual punishment. - Cory [more]
Home
Go Back   Chief Delphi > FIRST > General Forum
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
 
 
Thread Tools Rating: Thread Rating: 12 votes, 5.00 average. Display Modes
Prev Previous Post   Next Post Next
  #1   Spotlight this post!  
Unread 12-01-2010, 13:06
MrForbes's Avatar
MrForbes MrForbes is offline
Registered User
AKA: Jim
FRC #1726 (N.E.R.D.S.)
Team Role: Mentor
 
Join Date: Feb 2006
Rookie Year: 2006
Location: Sierra Vista AZ
Posts: 5,988
MrForbes has a reputation beyond reputeMrForbes has a reputation beyond reputeMrForbes has a reputation beyond reputeMrForbes has a reputation beyond reputeMrForbes has a reputation beyond reputeMrForbes has a reputation beyond reputeMrForbes has a reputation beyond reputeMrForbes has a reputation beyond reputeMrForbes has a reputation beyond reputeMrForbes has a reputation beyond reputeMrForbes has a reputation beyond repute
BOM-list all KOP parts

Interesting changes in the accounting rules this year. The cost end of it is pretty much the same, but the Bill of Materials (BOM) must now include ALL Kit of Part parts. Also it must be submitted electronically, paper won't do. And you must use the specified template, it's not optional.

Quote:
<R21> All items and materials used in the construction of a ROBOT, and their associated costs, shall be recorded (in US dollars) in a consolidated Bill Of Materials (BOM). The BOM must use the FIRST-approved template available for download at http://www.usfirst.org/community/frc...nt.aspx?id=452. Please refer to Rule <R89> in Section 8.3.11 - Robot Inspection for information regarding submission of the BOM.
• All KOP items used on the ROBOT must be included in the BOM. The source for each of the KOP items should be listed as “KOP” and the indicated cost should be listed as “$0.00.”
Quote:
<R89> At the time of inspection, teams must submit an electronic copy of their Bill Of Materials (BOM) of all items used in the construction of their ROBOT, and their associated costs, to the inspector (see Rule <R21>). BOMs must be transferred to inspectors at the event via USB drive (inspector or team provided).
I wonder if this is so that FIRST can see what parts of the kit we actually use?
Reply With Quote
 


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Schematics of KOP parts Al Skierkiewicz Electrical 0 14-01-2009 08:43
Missing Parts in 2009 KOP woogit General Forum 13 04-01-2009 18:18
KOP Cost List Richard McClellan Kit & Additional Hardware 1 16-06-2008 19:49
2006 KOP Wish List Andrew Blair Kit & Additional Hardware 33 19-05-2006 17:08
BOM parts question (Water Closet Flange) Alan Ing Kit & Additional Hardware 7 29-12-2001 16:55


All times are GMT -5. The time now is 07:59.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi