Go to Post Wait...you're supposed to have a driver? I guess I should have read past the Autonomous section in the manual :D - ASD20 [more]
Home
Go Back   Chief Delphi > ChiefDelphi.com Website > Extra Discussion
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
 
 
Thread Tools Rate Thread Display Modes
Prev Previous Post   Next Post Next
  #4   Spotlight this post!  
Unread 15-01-2010, 16:48
Greg Needel's Avatar Unsung FIRST Hero
Greg Needel Greg Needel is offline
REVving up for a new season
FRC #2848 (All-sparks)
Team Role: Engineer
 
Join Date: Jan 2002
Rookie Year: 2002
Location: Dallas, TX
Posts: 3,104
Greg Needel has a reputation beyond reputeGreg Needel has a reputation beyond reputeGreg Needel has a reputation beyond reputeGreg Needel has a reputation beyond reputeGreg Needel has a reputation beyond reputeGreg Needel has a reputation beyond reputeGreg Needel has a reputation beyond reputeGreg Needel has a reputation beyond reputeGreg Needel has a reputation beyond reputeGreg Needel has a reputation beyond reputeGreg Needel has a reputation beyond repute
Re: pic: Our design on the bump

http://www.chiefdelphi.com/media/photos/32175


I would also like to remind you to consider R25 (copied below). I am not passing judgment either way as I do not know your team/process/details of your design and I am a firm believer that each team needs to figure out their own interpretations and decisions. Please Carefully read the rules and make sure you feel you are not in violation with your design.


Quote:
<R25> Prior to the Kick-off: Before the formal start of the Robot Build Season, teams are encouraged to think as much as they please about their ROBOTS. They may develop prototypes, create proof-of-concept models, and conduct design exercises. Teams may gather all the raw stock materials and COTS COMPONENTS they want. But absolutely no final design, fabrication, or assembly of any elements intended for the final ROBOT is permitted prior to the Kick-off presentation.

Example: A TEAM designs and builds a two-speed shifting transmission during the fall as a training exercise. When designing their competition ROBOT, they utilize all the design principles they learned. To optimize the transmission design for their ROBOT, they improve the transmission gear ratios and reduce the size, and build two new transmissions, and place them on the ROBOT. All parts of this process are permitted activities.

Example: The same TEAM realizes that the transmission designed and built in the fall perfectly fits their need for a transmission to drive the ROBOT arm. They build an exact copy of the transmission from the original design plans, and bolt it to the ROBOT. This would be prohibited, as the transmission – although fabricated during the competition season – was built from detailed designs developed prior to kick-off.

Example: A TEAM developed an omni-directional drive system for the 2008 competition. Over the summer of 2009 they refined and improved the control software (written in C) to add more precision and capabilities. They decided to use a similar system for the 2010 competition. They copied large sections of unmodified code over into the control software of the new ROBOT (also written in C). This would be a violation of the schedule constraint, and would not be allowed.

Example: The same TEAM decides to use the LabView as their software environment for 2010. Following kickoff, they use the previously-developed C code as a reference for the algorithms and calculations required to implement their omni-directional control solution. Because they developed new LabView code as they ported over their algorithms, this would be permitted.

Example: A different team develops a similar solution during the fall, and plans to use the developed software on their competition ROBOT. After completing the software, they post it in a generally accessible public forum and make the code available to all teams. Because they have made their software generally available, under the terms of Rule <R67> it is considered COTS software and they can use it on their ROBOT.
__________________
Greg Needel│www.robogreg.com
Co-founder REV Robotics LLC www.REVrobotics.com
2014 FRC World Champions with 254, 469, & 74
Reply With Quote
 


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Over the bump or under the tower quinxorin Rules/Strategy 44 18-01-2010 14:17
pic: The IRI Bump Greg Marra Extra Discussion 2 26-07-2008 02:59
pic: Our New T-Shirt Design!!! Nathan Pell Extra Discussion 19 10-01-2005 00:10
Q&A Discuss: How long is the bump from the ramp to the top? CD47-Bot Extra Discussion 1 11-01-2003 09:48
How long is the bump from the ramp to the top? Tton Rules/Strategy 1 09-01-2003 18:26


All times are GMT -5. The time now is 07:15.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi