|
|
|
![]() |
|
|||||||
|
||||||||
|
|
Thread Tools | Rate Thread | Display Modes |
|
#37
|
|||
|
|||
|
Re: MERGED: Universal Hanging System/Standardized Partner Suspension
In order to prevent the large cantilever load from a "piggy back" robot, how about the second robot drive under the first suspended robot. Assume the lifted robot can go through the tunnel and therefore could fit under. Since the bumpers are pretty well defined a simple pair of "L" brackets could provide a nest. Then the first robot climbs a little higher lifting both. Both CGs are only a few feet from the tower.
|
| Thread Tools | |
| Display Modes | Rate This Thread |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| **FIRST EMAIL**/FSM & Partner Control System/Driver's Station & Beta Testing Call | Mark McLeod | FIRST E-Mail Blast Archive | 0 | 13-11-2009 14:01 |
| First Week Regionals *Merged* | Tom Bottiglieri | Regional Competitions | 34 | 11-03-2005 18:42 |
| Standardized Scouting System/File Format | phrontist | General Forum | 15 | 18-04-2004 17:05 |
| Favorite Part of FIRST <-Merged with old thread | dk5sm5luigi | General Forum | 36 | 25-01-2004 12:11 |