Go to Post Look at 71's 'walking' bot from last year. One dosn't need wheels/track to move. All you need is an idea. - Jack [more]
Home
Go Back   Chief Delphi > FIRST > General Forum
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
View Poll Results: Should rookie Team 3368 receive a build deadline extension?
Yes 71 51.45%
No 67 48.55%
Voters: 138. You may not vote on this poll

Reply
Thread Tools Rate Thread Display Modes
  #16   Spotlight this post!  
Unread 21-01-2010, 13:27
sloteera's Avatar
sloteera sloteera is offline
Registered User
AKA: Rafa
FRC #1860 (Cephatron)
Team Role: Coach
 
Join Date: Mar 2007
Rookie Year: 2004
Location: Brazil
Posts: 190
sloteera has much to be proud ofsloteera has much to be proud ofsloteera has much to be proud ofsloteera has much to be proud ofsloteera has much to be proud ofsloteera has much to be proud ofsloteera has much to be proud ofsloteera has much to be proud ofsloteera has much to be proud ofsloteera has much to be proud of
Re: KOP recieved 11 days late

But we are talking about a rookie team in another country!!

They need to familiarize with system and softwares as soon as possible!
Imagine a rookie team that never had seen a Labview Interface, for example....
How long do you think they will take to learn how to use the software??

I think that they will need at least one week to learn how to manipulate the software!!!
Reply With Quote
  #17   Spotlight this post!  
Unread 21-01-2010, 13:30
Racer26 Racer26 is offline
Registered User
no team
Team Role: Alumni
 
Join Date: Apr 2003
Rookie Year: 2003
Location: Beaverton, ON
Posts: 2,229
Racer26 has a reputation beyond reputeRacer26 has a reputation beyond reputeRacer26 has a reputation beyond reputeRacer26 has a reputation beyond reputeRacer26 has a reputation beyond reputeRacer26 has a reputation beyond reputeRacer26 has a reputation beyond reputeRacer26 has a reputation beyond reputeRacer26 has a reputation beyond reputeRacer26 has a reputation beyond reputeRacer26 has a reputation beyond repute
Re: KOP recieved 11 days late

The only thing that strikes me about this as being a special case is that they're a rookie team, in Bosnia. I don't know of any Bosnian veteran teams that could help them out.
Reply With Quote
  #18   Spotlight this post!  
Unread 21-01-2010, 13:32
dlavery's Avatar
dlavery dlavery is offline
Curmudgeon
FRC #0116 (Epsilon Delta)
 
Join Date: Jun 2001
Rookie Year: 1996
Location: Herndon, VA
Posts: 3,176
dlavery has a reputation beyond reputedlavery has a reputation beyond reputedlavery has a reputation beyond reputedlavery has a reputation beyond reputedlavery has a reputation beyond reputedlavery has a reputation beyond reputedlavery has a reputation beyond reputedlavery has a reputation beyond reputedlavery has a reputation beyond reputedlavery has a reputation beyond reputedlavery has a reputation beyond repute
Re: KOP recieved 11 days late

Not to kill the thread, but everyone needs to face a little reality. FIRST is not going to extend the deadline for a team just because the KOP arrived late. Ain't gonna happen. No way. No use in even talking about it.

There have been some very rare instances where the deadline has been extended due to truly extreme circumstances. Late arrival of the KOP is not one of those reasons.. The Israel and Brazil teams deal with late kit arrivals every year (and the delays they contend with have been much worse than 11 days), and their deadlines are not extended. So it is not reasonable to expect that it will happen here. To their perpetual credit, the Israeli and Brazilian teams always find a way to work around the late arrival of their kits, and still show up with competitive robots. And, more importantly, they have shown year after year that even if their kits show up late they are still able to extract real value and a positive impact out of their experience, no matter what the robot construction limitations may be.

-dave



.
__________________
"I know what you're thinking, punk," hissed Wordy Harry to his new editor, "you're thinking, 'Did he use six superfluous adjectives or only five?' - and to tell the truth, I forgot myself in all this excitement; but being as this is English, the most powerful language in the world, whose subtle nuances will blow your head clean off, you've got to ask yourself one question: 'Do I feel loquacious?' - well do you, punk?"
- Stuart Vasepuru, 2006 Bulwer-Lytton Fiction Contest



My OTHER CAR is still on Mars!!!
Reply With Quote
  #19   Spotlight this post!  
Unread 21-01-2010, 13:35
IKE's Avatar
IKE IKE is offline
Not so Custom User Title
AKA: Isaac Rife
no team (N/A)
Team Role: Mechanical
 
Join Date: Jan 2008
Rookie Year: 2003
Location: Michigan
Posts: 2,152
IKE has a reputation beyond reputeIKE has a reputation beyond reputeIKE has a reputation beyond reputeIKE has a reputation beyond reputeIKE has a reputation beyond reputeIKE has a reputation beyond reputeIKE has a reputation beyond reputeIKE has a reputation beyond reputeIKE has a reputation beyond reputeIKE has a reputation beyond reputeIKE has a reputation beyond repute
Re: KOP recieved 11 days late

I would be opposed to an extension past the Week1 competition.
Reply With Quote
  #20   Spotlight this post!  
Unread 21-01-2010, 14:32
Tristan Lall's Avatar
Tristan Lall Tristan Lall is offline
Registered User
FRC #0188 (Woburn Robotics)
 
Join Date: Aug 2001
Rookie Year: 1999
Location: Toronto, ON
Posts: 2,484
Tristan Lall has a reputation beyond reputeTristan Lall has a reputation beyond reputeTristan Lall has a reputation beyond reputeTristan Lall has a reputation beyond reputeTristan Lall has a reputation beyond reputeTristan Lall has a reputation beyond reputeTristan Lall has a reputation beyond reputeTristan Lall has a reputation beyond reputeTristan Lall has a reputation beyond reputeTristan Lall has a reputation beyond reputeTristan Lall has a reputation beyond repute
Re: KOP recieved 11 days late

Any deadline change would result in some sort of disparity between this team and all of the others—of course, receiving the KOP late is a significant disparity in its own right, especially for a rookie team which is likely to have depended on its contents to perform even cursory design and prototyping work.

Something like this should depend on why the delay occurred. If the team was allowed to register after the deadline as a courtesy, there may not have been enough time to handle the logistics. On the other hand, if they were not a late registrant, I think FIRST should probably have anticipated that shipping might not be straightforward. Assuming the team registered on time, and is paying for shipping (as teams can do, if they're not picking it up at a kickoff event), timely receipt of their materials would be a wholly reasonable expectation.

There's also the question of whether someone didn't fill out the required forms or customs manifests, or didn't do so in the right language—it's not improbable that the team and/or FIRST could have made an innocent error there. I'm not sure how Bosnia handles these things, but even when dealing with Canada-U.S. shipping, it's important to itemize the contents, indicate the value, and describe the expected use (especially if not for resale).

I suspect this is one of those times when you want to just pay a customs broker to handle everything for you—if that's what FIRST did, and it still arrived late, there's probably not much that can be done, except to ship earlier next year.

I wouldn't be opposed to a short extension, if it was clear (to FIRST) that this wasn't the team's own fault, but a full 11 days is a bit too optimistic. If FIRST is unwilling to contemplate the possibility of an extension of any sort, then perhaps a partial refund is in order—certainly at least the cost of shipping.


Now, on the subject of late kit arrivals every year, that's simply unacceptable. When you understand the problem (because it happened last year), and still can't avoid it, you're doing it wrong.

In terms of a long-term resolution to this issue, maybe there could be a note in the list of deadlines explaining that registrants from outside North America who haven't paid by early November should not expect their KOP to arrive in-country by the kickoff date. If the registrants do pay early, FIRST would have an extra month to put together an early shipment of whatever KOP parts it has on hand at that point, and the team would get the bulk of its materials on time. At least this way, the teams would be forewarned, and have the option to resolve it. (It's not totally fair, because they'd have to raise funds faster than everyone else, but at least it doesn't interfere with the build season.)
Reply With Quote
  #21   Spotlight this post!  
Unread 21-01-2010, 15:08
Racer26 Racer26 is offline
Registered User
no team
Team Role: Alumni
 
Join Date: Apr 2003
Rookie Year: 2003
Location: Beaverton, ON
Posts: 2,229
Racer26 has a reputation beyond reputeRacer26 has a reputation beyond reputeRacer26 has a reputation beyond reputeRacer26 has a reputation beyond reputeRacer26 has a reputation beyond reputeRacer26 has a reputation beyond reputeRacer26 has a reputation beyond reputeRacer26 has a reputation beyond reputeRacer26 has a reputation beyond reputeRacer26 has a reputation beyond reputeRacer26 has a reputation beyond repute
Re: KOP recieved 11 days late

I suppose the biggest part of the difficulty is that the GDC doesnt want these teams to get their kit AHEAD of kickoff, lest a dishonest team open it, and learn something vital about the game (game piece, anyone?) and disclose it to the community on here, for example. Co-ordinating ship dates so things arrive somewhere on a specific day is not easy when using big international shippers like FedEx. This is the very reason that for us Canadians buying off Amazon, for example, we're quoted 9-15 days. They have no idea when it's going to get here.
Reply With Quote
  #22   Spotlight this post!  
Unread 21-01-2010, 15:38
Chris is me's Avatar
Chris is me Chris is me is offline
no bag, vex only, final destination
AKA: Pinecone
FRC #0228 (GUS Robotics); FRC #2170 (Titanium Tomahawks)
Team Role: Mentor
 
Join Date: Dec 2008
Rookie Year: 2006
Location: Glastonbury, CT
Posts: 7,780
Chris is me has a reputation beyond reputeChris is me has a reputation beyond reputeChris is me has a reputation beyond reputeChris is me has a reputation beyond reputeChris is me has a reputation beyond reputeChris is me has a reputation beyond reputeChris is me has a reputation beyond reputeChris is me has a reputation beyond reputeChris is me has a reputation beyond reputeChris is me has a reputation beyond reputeChris is me has a reputation beyond repute
Send a message via AIM to Chris is me
Re: KOP recieved 11 days late

Quote:
Originally Posted by 1075guy View Post
I suppose the biggest part of the difficulty is that the GDC doesnt want these teams to get their kit AHEAD of kickoff, lest a dishonest team open it, and learn something vital about the game (game piece, anyone?) and disclose it to the community on here, for example. Co-ordinating ship dates so things arrive somewhere on a specific day is not easy when using big international shippers like FedEx. This is the very reason that for us Canadians buying off Amazon, for example, we're quoted 9-15 days. They have no idea when it's going to get here.
I don't think that is a big concern. I mean, people put the field together for remote Kickoffs and those people keep their mouth shut in the day or so before Kickoff, so I don't think they hold back the KOPs in fear of people opening them and finding out about the game.
__________________
Mentor / Drive Coach: 228 (2016-?)
--2016 Waterbury SFs (with 3314, 3719), RIDE #2 Seed / Winners (with 1058, 6153), Carver QFs (with 503, 359, 4607)
Mentor / Consultant Person: 2170 (2017-?)
.
College Mentor: 2791 (2010-2015)
-- 2015 TVR Motorola Quality, FLR GM Industrial Design -- 2014 FLR Motorola Quality / SFs (with 341, 4930)
-- 2013 BAE Motorola Quality, WPI Regional #1 Seed / Delphi Excellence in Engineering / Finalists (with 20, 3182)
-- 2012 BAE Imagery / Finalists (with 1519, 885), CT Xerox Creativity / SFs (with 2168, 118)
Student: 1714 (2009) - 2009 MN 10K Lakes Regional Winners (with 2826, 2470)
2791 Build Season Photo Gallery - Look here for mechanism photos My Robotics Blog (Updated April 11 2014)
Reply With Quote
  #23   Spotlight this post!  
Unread 21-01-2010, 15:47
Nadav Zingerman Nadav Zingerman is offline
Registered User
FRC #2230
Team Role: Programmer
 
Join Date: Jul 2009
Rookie Year: 2009
Location: Israel
Posts: 90
Nadav Zingerman is a splendid one to beholdNadav Zingerman is a splendid one to beholdNadav Zingerman is a splendid one to beholdNadav Zingerman is a splendid one to beholdNadav Zingerman is a splendid one to beholdNadav Zingerman is a splendid one to beholdNadav Zingerman is a splendid one to behold
Re: KOP recieved 11 days late

Quote:
Originally Posted by Tristan Lall View Post
Any deadline change would result in some sort of disparity between this team and all of the others—of course, receiving the KOP late is a significant disparity in its own right, especially for a rookie team which is likely to have depended on its contents to perform even cursory design and prototyping work.

Something like this should depend on why the delay occurred. If the team was allowed to register after the deadline as a courtesy, there may not have been enough time to handle the logistics. On the other hand, if they were not a late registrant, I think FIRST should probably have anticipated that shipping might not be straightforward. Assuming the team registered on time, and is paying for shipping (as teams can do, if they're not picking it up at a kickoff event), timely receipt of their materials would be a wholly reasonable expectation.

There's also the question of whether someone didn't fill out the required forms or customs manifests, or didn't do so in the right language—it's not improbable that the team and/or FIRST could have made an innocent error there. I'm not sure how Bosnia handles these things, but even when dealing with Canada-U.S. shipping, it's important to itemize the contents, indicate the value, and describe the expected use (especially if not for resale).

I suspect this is one of those times when you want to just pay a customs broker to handle everything for you—if that's what FIRST did, and it still arrived late, there's probably not much that can be done, except to ship earlier next year.

I wouldn't be opposed to a short extension, if it was clear (to FIRST) that this wasn't the team's own fault, but a full 11 days is a bit too optimistic. If FIRST is unwilling to contemplate the possibility of an extension of any sort, then perhaps a partial refund is in order—certainly at least the cost of shipping.


Now, on the subject of late kit arrivals every year, that's simply unacceptable. When you understand the problem (because it happened last year), and still can't avoid it, you're doing it wrong.

In terms of a long-term resolution to this issue, maybe there could be a note in the list of deadlines explaining that registrants from outside North America who haven't paid by early November should not expect their KOP to arrive in-country by the kickoff date. If the registrants do pay early, FIRST would have an extra month to put together an early shipment of whatever KOP parts it has on hand at that point, and the team would get the bulk of its materials on time. At least this way, the teams would be forewarned, and have the option to resolve it. (It's not totally fair, because they'd have to raise funds faster than everyone else, but at least it doesn't interfere with the build season.)
Actually, this problem is mostly unavoidable. Customs officers can't clear a shipment before it arrives, and the evaluation period can not be anticipated. I can't begin to tell you how many times radios were received long after build season or not at all, thus preventing teams from properly practicing driving their robot. Every design challenge has unexpected difficulties outside of your control. Late shipments are one of them.
Reply With Quote
  #24   Spotlight this post!  
Unread 21-01-2010, 17:18
LovablePsycho's Avatar
LovablePsycho LovablePsycho is offline
Registered User
AKA: Milo H.
FRC #0308 (Walled Lake Monsters)
Team Role: Mascot
 
Join Date: Jan 2010
Rookie Year: 2010
Location: Walled Lake, MI
Posts: 11
LovablePsycho is an unknown quantity at this point
Re: KOP recieved 11 days late

Yeah, that really sucks. But, unfortunately, FIRST will most likely not extend their time. Good luck anyway!
__________________
...The Vorpal Blade went snicker-snack!
He left it dead
And with its head
He went galumphing back.
-From "Jabberwocky" by Lewis Carroll

WE ARE THE MONSTERS!!! HEAR US ROAR!!!
Reply With Quote
  #25   Spotlight this post!  
Unread 21-01-2010, 17:30
jsasaki's Avatar
jsasaki jsasaki is offline
Registered User
AKA: Jun Sasaki
no team
Team Role: Alumni
 
Join Date: Jan 2009
Rookie Year: 2008
Location: Hawaii
Posts: 210
jsasaki has a spectacular aura aboutjsasaki has a spectacular aura aboutjsasaki has a spectacular aura about
Re: KOP recieved 11 days late

I think that it would be reasonable for those that received their KOP late to get an extension on the missing parts deadline but not much more than that. If our KOP came more than a weekend late like it doeds now I would be sad .
Reply With Quote
  #26   Spotlight this post!  
Unread 21-01-2010, 17:41
Blackphantom91's Avatar
Blackphantom91 Blackphantom91 is offline
Mentor + 4 = Stuck For Life
AKA: Malcolm Stirckland
FRC #1986 (Team Titanium)
Team Role: Mentor
 
Join Date: Nov 2009
Rookie Year: 2008
Location: Kansas City
Posts: 232
Blackphantom91 has a spectacular aura aboutBlackphantom91 has a spectacular aura aboutBlackphantom91 has a spectacular aura about
Re: KOP recieved 11 days late

I think that They should have there time extended, pending that they don't compete within that 11 days because it may change their schedual and may not have the full time.
Reply With Quote
  #27   Spotlight this post!  
Unread 21-01-2010, 17:54
EricH's Avatar
EricH EricH is offline
New year, new team
FRC #1197 (Torbots)
Team Role: Engineer
 
Join Date: Jan 2005
Rookie Year: 2003
Location: SoCal
Posts: 19,823
EricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond repute
Re: KOP recieved 11 days late

This is like the real world. Sometimes, a vendor for a critical part for your product can't get the part to you in time for whatever reason. Your customer, who is buying your product, won't wait for the product. If they have to wait, they pay less, or maybe even cancel the deal.

It doesn't look like any of them are on CD. If someone has direct contact to them, could they be informed of CD's existence? It may be helpful if they made contact with veterans, whether "nearby" (Turkey and Israel are the closest countries with teams, and may have some experience with things like this) or farther away via email/CD. We've all been rookies; we may not have had their unique challenges, but we can still help.
__________________
Past teams:
2003-2007: FRC0330 BeachBots
2008: FRC1135 Shmoebotics
2012: FRC4046 Schroedinger's Dragons

"Rockets are tricky..."--Elon Musk

Reply With Quote
  #28   Spotlight this post!  
Unread 21-01-2010, 18:33
Pat Major's Avatar
Pat Major Pat Major is offline
Registered User
#0494 (The Martians)
Team Role: Leadership
 
Join Date: Oct 2001
Location: Goodrich, Michigan
Posts: 97
Pat Major has a reputation beyond reputePat Major has a reputation beyond reputePat Major has a reputation beyond reputePat Major has a reputation beyond reputePat Major has a reputation beyond reputePat Major has a reputation beyond reputePat Major has a reputation beyond reputePat Major has a reputation beyond reputePat Major has a reputation beyond reputePat Major has a reputation beyond reputePat Major has a reputation beyond repute
Re: KOP recieved 11 days late

Attached is a history of how the team was started, this was written by Ingrid's mother for our local newspaper. It is a great FIRST story, Ingrid has taken on a lot, we are very proud of her and we are helping mentor the team via video conferences. I put the poll up because I was curious as to how people would feel about an extension. I don't think it will happen, I agree with Dave. I disagree that it is not worth talking about.
Attached Files
File Type: doc Ingrid First Robotics essay.doc (28.0 KB, 42 views)
__________________
A river is powerful because many drops of water have learned the secret of collaboration.
Reply With Quote
  #29   Spotlight this post!  
Unread 21-01-2010, 18:38
gweaver's Avatar
gweaver gweaver is offline
Wandering between rooms...
AKA: Greg Weaver
FRC #0675 (Tech High Robotics)
Team Role: Mentor
 
Join Date: Oct 2008
Rookie Year: 2001
Location: Rohnert Park, CA
Posts: 3
gweaver is on a distinguished road
Re: KOP recieved 11 days late

I know it's a moot point, and all this discussion is academic, but as a previous poster said, it's a rookie team, which suggests, among other things, they don't have any stockpile of old parts to play with. Granted, most of the first week or so is design, but there's still the control system to learn and various systems to become familiar with (pneumo, drive, wiring, etc). I don't know if they should have a full extension of 11 days, but I would not be opposed to an extra 3-4 days.

As was previously mentioned, there don't seem to be any experienced teams to help them in their area.

I'd be curious to see how some of the experienced teams would do, if they were given a challenge (via video) and then a printed document (with conflicting measurements), but not provided with actual parts for almost two weeks. And I'm not talking about an FRC type challenge that those teams are familiar with, but something completely new, that they've had zero experience with. The only resource those teams would have would be the internet. Hmmm...

Just my thoughts,
G
__________________
Greg Weaver
Tech High Robotics
FIRST #675
Reply With Quote
  #30   Spotlight this post!  
Unread 21-01-2010, 18:42
waialua359's Avatar
waialua359 waialua359 is offline
Mentor
AKA: Glenn
FRC #0359 (Hawaiian Kids)
Team Role: Mentor
 
Join Date: Apr 2003
Rookie Year: 2000
Location: Waialua, HI
Posts: 3,315
waialua359 has a reputation beyond reputewaialua359 has a reputation beyond reputewaialua359 has a reputation beyond reputewaialua359 has a reputation beyond reputewaialua359 has a reputation beyond reputewaialua359 has a reputation beyond reputewaialua359 has a reputation beyond reputewaialua359 has a reputation beyond reputewaialua359 has a reputation beyond reputewaialua359 has a reputation beyond reputewaialua359 has a reputation beyond repute
Re: KOP recieved 11 days late

I think the discussion should lean towards how do we get international teams their KOP on time in the future, especially in dealing with teams from new countries that participate in FIRST.
__________________

2016 Hawaii Regional #1 seed, IDesign, Safety Award
2016 NY Tech Valley Regional Champions, #1 seed, Innovation in Controls Award
2016 Lake Superior Regional Champions, #1 seed, Quality Award, Dean's List
2015 FRC Worlds-Carver Division Champions
2015 Hawaii Regional Champions, #1 seed.
2015 Australia Regional Champions, #2 seed, Engineering Excellence Award
2015 Inland Empire Regional Champions, #1 seed, Industrial Design Award
2014 OZARK Mountain Brawl Champions, #1 seed.
2014 Hawaii Regional Champions, #1 seed, UL Safety Award
2014 Dallas Regional Champions, #1 seed, Engineering Excellence Award
2014 Northern Lights Regional Champions, #1 seed, Entrepreneurship Award
2013 Championship Dean's List Winner
2013 Utah Regional Champion, #1 seed, KP&B Award, Deans List
2013 Boilermaker Regional Champion, #1 seed, Motorola Quality Award
2012 Lone Star Regional Champion, #1 seed, Motorola Quality Award
2012 Hawaii Regional Champions #1 seed, Motorola Quality Award
Reply With Quote
Reply


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Never recieved Sensor Panel kitscuzz Programming 7 10-02-2007 12:50
Has anyone recieved their Autodesk package phi.naught Inventor 29 06-12-2005 15:41
arriving late chocolateluvrlr Championship Event 4 18-02-2005 02:54
Any way to see all of the reputation I recieved? Elgin Clock CD Forum Support 8 21-07-2004 12:32
Late night edomus General Forum 3 25-02-2004 19:12


All times are GMT -5. The time now is 23:47.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi