Go to Post Now if you'll excuse me, I need to develop the edible transistor. - sciguy125 [more]
Home
Go Back   Chief Delphi > FIRST > General Forum
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
Reply
 
Thread Tools Rating: Thread Rating: 2 votes, 5.00 average. Display Modes
  #1   Spotlight this post!  
Unread 20-02-2010, 22:32
Brandon_L Brandon_L is offline
Someone told me there was food here
AKA: Brandon Liatys
FRC #2180 (Zero Gravity)
Team Role: Mentor
 
Join Date: Jan 2008
Rookie Year: 2007
Location: Newark, NJ
Posts: 1,200
Brandon_L has a reputation beyond reputeBrandon_L has a reputation beyond reputeBrandon_L has a reputation beyond reputeBrandon_L has a reputation beyond reputeBrandon_L has a reputation beyond reputeBrandon_L has a reputation beyond reputeBrandon_L has a reputation beyond reputeBrandon_L has a reputation beyond reputeBrandon_L has a reputation beyond reputeBrandon_L has a reputation beyond reputeBrandon_L has a reputation beyond repute
Re: Inspection Checklist posted!

Quote:
Originally Posted by Joe Ross View Post
Better to find out now when you have a few days to fix it, then at the competition.
We don't even have any 12.
__________________
FRC 2495 - Hamilton West Robotics [2007-2014] - whats a..."hive mind"?
FRC 3929 - Atomic Dragons [2012-2013]
FRC 2180 - Zero Gravity [2017-]

Just trying to collect all the possible team colors

Last edited by Brandon_L : 20-02-2010 at 22:35.
Reply With Quote
  #2   Spotlight this post!  
Unread 20-02-2010, 22:47
Gary Dillard's Avatar Unsung FIRST Hero
Gary Dillard Gary Dillard is offline
Generator of Entropy
AKA: you know, the old bald guy
FRC #2973 (The Mad Rockers)
Team Role: Engineer
 
Join Date: Nov 2001
Rookie Year: 1998
Location: Huntsville, AL
Posts: 1,582
Gary Dillard has a reputation beyond reputeGary Dillard has a reputation beyond reputeGary Dillard has a reputation beyond reputeGary Dillard has a reputation beyond reputeGary Dillard has a reputation beyond reputeGary Dillard has a reputation beyond reputeGary Dillard has a reputation beyond reputeGary Dillard has a reputation beyond reputeGary Dillard has a reputation beyond reputeGary Dillard has a reputation beyond reputeGary Dillard has a reputation beyond repute
Send a message via AIM to Gary Dillard
Re: Inspection Checklist posted!

Quote:
Originally Posted by Brandon_L View Post
We don't even have any 12.
Then use 10; you got 10 feet each of red and black in the Kit of Parts.
__________________
Close enough to taste it, too far to reach it
Reply With Quote
  #3   Spotlight this post!  
Unread 21-02-2010, 15:27
Russ Beavis Russ Beavis is offline
Registered User
no team
 
Join Date: Nov 2005
Location: Manchester, NH - DEKA R&D Corp.
Posts: 341
Russ Beavis has a reputation beyond reputeRuss Beavis has a reputation beyond reputeRuss Beavis has a reputation beyond reputeRuss Beavis has a reputation beyond reputeRuss Beavis has a reputation beyond reputeRuss Beavis has a reputation beyond reputeRuss Beavis has a reputation beyond reputeRuss Beavis has a reputation beyond reputeRuss Beavis has a reputation beyond reputeRuss Beavis has a reputation beyond reputeRuss Beavis has a reputation beyond repute
Re: Inspection Checklist posted!

Gary,
Regarding the distinction between CAPABLE and NOT INTENDED TO with respect to having balls intrude by more than 3" and whether such capability (regardless of intention) is a violation of rule <R19> (see below) - this sounds like a great question for the GDC and the formal Q&A. When I read the rules and crafted the checklist task, I interpreted the rule such that simply having the ability to intrude by > 3" was a violation of <R19>.

It can get even fuzzier - I saw a few robots at Suffield Shakedown with "squishy" barriers around their robot's lower perimeter (eg rubber bands or belts). It was very easy for the robot to "hop" over a ball and trap it underneath (even though, under normal operation, the "squishy" barrier did a fine job of keep balls from being lodged under the robot). In this case, I would have been tempted to allow the robot design to pass inspection and left enforcement of the (hopefully rare) ball entrapments to the referees.

A formal Q&A thread sounds like an appropriate action to take.

Russ

<R19> ROBOTS must be designed so that in normal operation BALLS cannot extend more than 3 inches inside
a) the FRAME PERIMETER below the level of the BUMPER ZONE (see Figure 8-5),
b) a MECHANISM or feature designed or used to deflect BALLS in a controlled manner that is above the level of the BUMPER ZONE.
Reply With Quote
  #4   Spotlight this post!  
Unread 21-02-2010, 15:29
Trying to Help Trying to Help is offline
Registered User
FRC #1729 (Monadnock 4-H Robotics)
Team Role: Mentor
 
Join Date: Feb 2009
Rookie Year: 2007
Location: New Hampshire
Posts: 298
Trying to Help has much to be proud ofTrying to Help has much to be proud ofTrying to Help has much to be proud ofTrying to Help has much to be proud ofTrying to Help has much to be proud ofTrying to Help has much to be proud ofTrying to Help has much to be proud ofTrying to Help has much to be proud of
Re: Inspection Checklist posted!

For those 4-H teams, have you used 4-H as your school name also?

Thank you,

Trying to Help
Reply With Quote
  #5   Spotlight this post!  
Unread 21-02-2010, 15:36
Phreadumb's Avatar
Phreadumb Phreadumb is offline
FRC 2188 Alumnus
AKA: Dakotah Jones
no team
Team Role: College Student
 
Join Date: Oct 2008
Rookie Year: 2008
Location: Michigan
Posts: 94
Phreadumb has a spectacular aura aboutPhreadumb has a spectacular aura about
Re: Inspection Checklist posted!

Hey, I was just checking out the inspection sheet, and I noticed in the electrical catagory it said "Motors - 5 CIM, 2 Denso Left, 2 Denso Right, 2 Fisher Price, and 2 Mabuchi. <R52. A,D,E>" So I was wondering if I needed to uses 2 left and 2 right left denso motors, and not somthing like 4 left as intended? I looked at A, D, and E and what I'm doing seems to be in compliance.
__________________
I will be trekking into territories where FIRST teams do not exist, perhaps I should start one? Oh, but that's a lot of work.
Reply With Quote
  #6   Spotlight this post!  
Unread 21-02-2010, 15:56
Russ Beavis Russ Beavis is offline
Registered User
no team
 
Join Date: Nov 2005
Location: Manchester, NH - DEKA R&D Corp.
Posts: 341
Russ Beavis has a reputation beyond reputeRuss Beavis has a reputation beyond reputeRuss Beavis has a reputation beyond reputeRuss Beavis has a reputation beyond reputeRuss Beavis has a reputation beyond reputeRuss Beavis has a reputation beyond reputeRuss Beavis has a reputation beyond reputeRuss Beavis has a reputation beyond reputeRuss Beavis has a reputation beyond reputeRuss Beavis has a reputation beyond reputeRuss Beavis has a reputation beyond repute
Re: Inspection Checklist posted!

Did you receive four left-side Denso window motors in your Kit of Parts? You should have received 2 lefts and 2 rights and are limited to using 2 of each per rules <R52> and <R53>.

What do you mean by using "4 left as intended"?

Russ
Reply With Quote
Reply


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Robot Size- R11 vs. Inspection Checklist Toby314 Rules/Strategy 4 07-01-2008 10:09
Robot Inspection Checklist ChuckDickerson Technical Discussion 2 16-02-2006 21:30
Update 11 is posted, with Inspection Checklist Tristan Lall General Forum 2 15-02-2005 21:34
Inspection Checklist Draft Available Yan Wang General Forum 1 26-02-2004 20:14
Have you seen the Inspection Checklist? Matthew_H General Forum 20 23-02-2003 19:55


All times are GMT -5. The time now is 08:27.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi