| Thread Tools | Rate Thread | Display Modes |
|
#16
|
|||||
|
|||||
|
Re: Charging pneumatics system before match
Quote:
The kicker cannot leave the frame perimeter due to a mechanical stop (Steel Shaft) so it will be within the frame perimeter at match start. I've found that we can prove this quickly with a level or other straight edge. Knowing that, would you say that that is an acceptable starting configuration? In terms of legality and safety? I feel that it should be. |
|
#17
|
|||||
|
|||||
|
Re: Charging pneumatics system before match
Dustin,
This is the primary rule and it references other rules... <G30> ROBOT Volume – During a MATCH, no part of the ROBOT shall extend outside the vertical projection of the FRAME PERIMETER, except as follows: a. BALL Interaction Volume – Solely for the purposes of interacting with a BALL, MECHANISMS that are below the BUMPER may extend up to the BUMPER PERIMETER, for a period not exceeding two seconds. After returning inside the FRAMER PERIMETER, such MECHANISMS are not permitted to re-extend beyond the FRAME PERIMETER for at least two seconds. And... <G10> ROBOT Size – Prior to the MATCH, each ROBOT shall not exceed the NORMAL CONFIGURATION maximum weight or volume specified in Rule <R10>. The Head Referee may call for an inspector's recertification of the ROBOT size and weight prior to the start of any MATCH. Violation (for ROBOTS prior to the match): Prohibition from participating in the MATCH. Referenced is this... NORMAL CONFIGURATION – The physical configuration and orientation of the ROBOT when the MATCH is started. This is the state of the ROBOT immediately before being enabled by the Field Management System, before the ROBOT takes any actions, deploys any mechanisms, or moves away from the starting location. This configuration is static, and does not change during a single MATCH (although it may change from MATCH to MATCH). So as you describe it, I would think it is acceptable. |
|
#18
|
||||
|
||||
|
Re: Charging pneumatics system before match
Quote:
At least when I was a student pre-charging the pneumatics was never an issue. |
|
#19
|
|||||
|
|||||
|
Re: Charging pneumatics system before match
It is hard to visualize without a picture. Your LRI will make the decision when he/she sees it.
|
|
#20
|
||||
|
||||
|
Re: Charging pneumatics system before match
Quote:
Your statement that the air pressure holds the system in a safe configuration begs the question of what happens if an air hose lets loose. Regards, Mike |
|
#21
|
||||
|
||||
|
Re: Charging pneumatics system before match
We've tried that scenario by venting the air pressure, it lets the kicker out nice and slow. I would be worried if a spring came loose though, that would be dangerous.
|
|
#22
|
|||||
|
|||||
|
Re: Charging pneumatics system before match
We have added a 3 second delay to our auto to let the compressor run. This delay with the short drive time to the first ball assures that the pneumatic can release the kicker bar.
|
|
#23
|
||||
|
||||
|
Re: Charging pneumatics system before match
Quote:
My robot's being inspected at your events, and I'm not 100% sure if a vented piston will hold the kicker back, since I don't have the robot in front of me. |
|
#24
|
||||
|
||||
|
Re: Charging pneumatics system before match
Quote:
Like you, I do not have the robot in front of me. From what I have gathered, teams only have seconds to place their robots on the field and many kicker mechanisms have incredibly strong spring implementations. Detaching and reattaching springs may not be feasible for many... For stored energy systems, it all comes down to the trigger mechanism. Let's assume that the trigger is a ratchet latch with a piston actuator. If the piston is the only force holding the ratchet latched, I would likely require a positive fail safe be added so that the rachet can not move if the piston is depressurized. If the ratchet latch is held by a spring and the piston pulls the latch back to fire the kicker, it sounds like it would be OK dependent upon the ratchet, latch & spring being a good solid design. It's all subjective so I'll end by asking this... If you took this robot to your local elementary school for a demo, set it up as you will when going onto & off the field or traveling through the pits or going into the size box for inspection, could you walk out of the room secure in the knowledge that none of the inquiring kids will accidentally trip your mechanism and get hurt? If your honest answer is yes, you will pass my inspection. If you are feeling a bit of a knot in your gut, think seriously about adding a fail safe device... Regards, Mike |
|
#25
|
||||
|
||||
|
Re: Charging pneumatics system before match
We have the same need to enter the field with full pressure, and it has never been a problem for us to turn on and charge the system while waiting in queue for the match. The field director at your event could have his own rules, but I think this will be a common need this year.
However there is a pitfall that you need to be aware of. Running your DS just before your match can cause communication problems. If you start up before your team number has come up in the field system, your DS will may not link up properly. We had problems with our DS not communicating and other teams had problems caused by turning on too early. If you turn on in queue to charge your pneumatics, make sure you turn off your robot and log out of the DS before you go on. Wait 15 seconds or so after your team number comes up on the field banner before logging back in and starting your DS. Wait until the DS is ready and confirms the link before turning on your robot on the field. We don't want to see anyone have the same problem that struck us a couple of times in week 1. Last edited by jspatz1 : 08-03-2010 at 12:57. |
|
#26
|
||||
|
||||
|
Re: Charging pneumatics system before match
As long as the robot is disabled there is both a latch and the pistons keeping the kicker stored, I would consider the pistons to be the "fail safe" feature.
I don't think I would leave any unsupervised robot energized and/or turned on with inexperienced users, that just seems like a bad idea in the first place! Energized pneumatics system could cause hearing damage if discharged improperly, almost any piston has enough force to hurt someone pretty badly in the wrong circumstance, and there are numerable things that could go wrong with the electrical system. Hands can get caught in chains, overheating motors can burn... I could go on... My point being that these robots aren't little-kid-proof, and they never will be, there will always be some risk involved with working with a FIRST robot. I think we've done the best reasonable job we can do of minimizing that risk. |
|
#27
|
|||||
|
|||||
|
Re: Charging pneumatics system before match
An unsuspecting student programmer in front of you in the Queue or a volunteer field resetter on their first day (or a robot inspector) is for all intents and purposes a "little kid" and safety should be measured in light of that fact. I am stressing that the programmer who backs into your robot, the field resetter who bumps your robot cart while moving around in the dark off field or the inspector who is reaching in to check wiring or breakers doesn't get hurt.
|
|
#28
|
||||
|
||||
|
Re: Charging pneumatics system before match
Quote:
Please don't put words in my mouth because I cause myself enough trouble already... ![]() I never said the robot would be on. I said in the condition that you will enter and leave the field or travel though the pits or enter the sizing box for inspection... Many teams will want their robots to do these tasks with springs loaded and/or pneumatics charged and I have absolutely no philosophical problem with that. As long as it is done safely... My primary concern is for your students as they carry the robot on and off the field. But my elementary school analogy is not really that far off base. Realize that, while "children under 12 must be accompanied in the Pit by an adult at all times" and I am sure you would never leave your robot unsupervised, the Pit is a chaotic and very crowded environment. Little fingers will reach out to explore and it only takes a second... As you describe your system, it sounds like it would take a double failure to cause an accidental deployment. If so, and I can not say for sure until I see it, you will have no problem with me. Having said that, I know that I will see many mechanisms which I will find lacking. I have been doing this for 16 years now. I have been injured by my own creations and by the creations of others. As an example, a few tears ago, the top of my head was cut by a robot arm while I was inspecting the operation of gears within the drive train. I had them file the sharp edge smooth but spent the rest of the day with blood matted in my hair... I would be most interested if you can find any team who has found me to be unfair in my past inspections. Regardless, both you and I have a responsibility to insure the safety of those around us. Just as your team has done "the best reasonable job we can do of minimizing that risk", I will do the best reasonable job I can do to insure that you have. I look forward to talking to you in Hartford. Regards, Mike |
|
#29
|
||||
|
||||
|
Re: Charging pneumatics system before match
I did not mean to put words in your mouth! I'm sorry if it came across that way. You strike me as very reasonable. I think we're on the same page here and I hope we don't give you TOO hard a time in CT
![]() |
![]() |
| Thread Tools | |
| Display Modes | Rate This Thread |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Charging a System | Zultraranger | Pneumatics | 7 | 05-02-2008 21:08 |
| pic: MARS making repairs before the last match | Billfred | Extra Discussion | 3 | 10-09-2007 16:52 |
| Spring pulling before match or while in match?? | Bomberofdoom | Technical Discussion | 3 | 11-01-2007 08:03 |
| pic: 1072 before the match | Billfred | Extra Discussion | 1 | 06-01-2007 22:30 |
| Pump operation before match | Jeff Waegelin | Pneumatics | 19 | 29-04-2003 09:42 |