|
|
|
![]() |
|
|||||||
|
||||||||
![]() |
|
|
Thread Tools | Rate Thread | Display Modes |
|
|
|
#1
|
|||||
|
|||||
|
Re: Inspection oversight DQ's team in the quarters
The robots in question were called on this to my knowledge...
<G10> ROBOT Size – Prior to the MATCH, each ROBOT shall not exceed the NORMAL CONFIGURATION maximum weight or volume specified in Rule <R10>. The Head Referee may call for an inspector's recertification of the ROBOT size and weight prior to the start of any MATCH. Violation (for ROBOTS prior to the match): Prohibition from participating in the MATCH. The robot in question was not able to remove the cover easily to correct the problem. The team removed the cover and cut the lexan to insure that cover movement did not take them outside the frame perimeter for the remaining matches. |
|
#2
|
|||
|
|||
|
Re: Inspection oversight DQ's team in the quarters
ok thanks i was just wandering about the thinking behind the DQ
|
![]() |
| Thread Tools | |
| Display Modes | Rate This Thread |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| pic: Inspection at the MN Regional | vivek16 | Extra Discussion | 8 | 03-10-2008 22:31 |
| How to pass your inspection at Nationals, the EASY way | Matt Reiland | Championship Event | 0 | 04-04-2003 18:39 |
| Have you seen the Inspection Checklist? | Matthew_H | General Forum | 20 | 23-02-2003 19:55 |
| CDI Oversight | archiver | 2000 | 1 | 24-06-2002 00:29 |
| World Cup Quarters | D.J. Fluck | Chit-Chat | 17 | 21-06-2002 17:34 |