| Thread Tools | Rate Thread | Display Modes |
|
#16
|
|||
|
|||
|
Re: Vertical Pipe Hanging
78 hangs from the side bar, but doesn't flip.
|
|
#17
|
|||
|
|||
|
Re: Vertical Pipe Hanging
At Cass Tech they seemed to be doing just fine with the bumps and handeling them.
|
|
#18
|
||||
|
||||
|
Re: Vertical Pipe Hanging
This weekend our hangers gona be much faster (and more colorful). YAAY
PS. to RUSH, I think this makes us arch rivals, In a good kind of way ![]() |
|
#19
|
||||
|
||||
|
Re: Vertical Pipe Hanging
I'd agree they are very nimble while going over the bump now. In fact, I'm not even sure they couldn't go over forwards before their arm was taken off, Its just that it wasn't shown in the video.
|
|
#20
|
|||||
|
|||||
|
Re: Vertical Pipe Hanging
When pit scouting, someone from 910 said they could hang from the vertical bar and drive up it. I NEVER saw this happen however, so I won't stay they can for sure. Did any else hear that and can confirm/deny this data?
|
|
#21
|
||||
|
||||
|
Re: Vertical Pipe Hanging
Well, how recent was this? at Kettering they had nothing of the sort on their robot, although I wouldn't be suprised if they have built something since and are planning on using it this weekend.
|
|
#22
|
|||
|
|||
|
Re: Vertical Pipe Hanging
It had to be at kettering becaue that is the only district they have competed in and i was at kettering and i saw no sign that hey could hang with their robot.
|
|
#23
|
|||||
|
|||||
|
Re: Vertical Pipe Hanging
It was at Kettering they they said that. I'm going to double check it at Troy and confirm or deny this.
|
|
#24
|
||||
|
||||
|
Re: Vertical Pipe Hanging
They could have been kidding, like when people tell you they have a billion wheels on their robot and it can fly. Sometimes some sarcastic team members will tell you this if you ask them something that's obviously not true (asking a kitbot if they can suspend robots, for example)
|
|
#25
|
|||||
|
|||||
|
Re: Vertical Pipe Hanging
Quote:
http://www.youtube.com/watch?v=U7sXWhHfULs |
|
#26
|
|||||
|
|||||
|
Re: Vertical Pipe Hanging
Quote:
From what I can see, it lacks any sort of hanging mechanism... |
|
#27
|
|||
|
|||
|
Re: Vertical Pipe Hanging
910 was working on the whole drive up the pole thing and the parts were on at kettering but not working. They may be ditching that idea to use the weight some place else.
|
|
#28
|
||||
|
||||
|
Re: Vertical Pipe Hanging
1218 hangs form one of the vertical poles
|
|
#29
|
||||
|
||||
|
Re: Vertical Pipe Hanging
Yes we drive up the pole, worked flawlessly during elims at GSR
|
|
#30
|
|||||
|
|||||
|
Re: Vertical Pipe Hanging
Quote:
![]() |
![]() |
| Thread Tools | |
| Display Modes | Rate This Thread |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Rule <G05> vertical pipe structure? | Jeff Sharpe | Rules/Strategy | 2 | 16-01-2004 23:37 |
| hanging off off other robots that are hanging off the horiz bar | Andrew Dahl | Rules/Strategy | 15 | 12-01-2004 19:14 |
| Vertical bar interaction | Madison | Rules/Strategy | 5 | 10-01-2004 16:22 |
| Pipe Diameter | archiver | 2001 | 1 | 23-06-2002 23:45 |
| pipe/flanges | LaCanadaROP | Technical Discussion | 1 | 10-02-2002 22:51 |