|
|
|
![]() |
|
|||||||
|
||||||||
|
|
Thread Tools | Rate Thread | Display Modes |
|
#8
|
||||
|
||||
|
Re: Vertical Pipe Hanging
Maybe I'm in the wrong thread here, but does anyone have a video to show of a robot "driving" up a pole. I think I know what your talking about, but need to see it in action.
BTW: In a match at SVR, 254 was scoring a ball with 10 seconds left, then drove to the tower, lined up and hung with 4 seconds still left in the match. This was on Friday at their first comp. I bet they will get this manuever (depending on defense of course) down to just a few seconds. VERY FAST!! |
| Thread Tools | |
| Display Modes | Rate This Thread |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Rule <G05> vertical pipe structure? | Jeff Sharpe | Rules/Strategy | 2 | 16-01-2004 23:37 |
| hanging off off other robots that are hanging off the horiz bar | Andrew Dahl | Rules/Strategy | 15 | 12-01-2004 19:14 |
| Vertical bar interaction | Madison | Rules/Strategy | 5 | 10-01-2004 16:22 |
| Pipe Diameter | archiver | 2001 | 1 | 23-06-2002 23:45 |
| pipe/flanges | LaCanadaROP | Technical Discussion | 1 | 10-02-2002 22:51 |