- Prototype before final design
- Design before build
- Build to the design
- Accuracy and neatness counts
I'm on the electrical team so we run wires neatly and together. We use #10 wire for primary power so an extra inch or two won't make an electrical difference. Label everything, cable ends, connection points, Jag/Spikes/etc. Zip tie the power wires into neat bundles and the control wires into different neat bundles. Zip ties every 3-4" keep things neatly together.
Devices like Jags are mounted on panels close to their motors. This year the 8 Jags are mounted on the sides of the robot in a neat row.