Go to Post If you cannot complete relatively simple tasks, why would anyone assign you something more challenging?? - Chris Fultz [more]
Home
Go Back   Chief Delphi > Technical > Kit & Additional Hardware
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
Closed Thread
Thread Tools Rate Thread Display Modes
  #1   Spotlight this post!  
Unread 22-07-2010, 02:41
Katie_UPS's Avatar
Katie_UPS Katie_UPS is offline
Registered User
AKA: Katie Widen
no team
Team Role: Engineer
 
Join Date: Feb 2008
Rookie Year: 2008
Location: Wisconsinite lost in Texas
Posts: 957
Katie_UPS has a reputation beyond reputeKatie_UPS has a reputation beyond reputeKatie_UPS has a reputation beyond reputeKatie_UPS has a reputation beyond reputeKatie_UPS has a reputation beyond reputeKatie_UPS has a reputation beyond reputeKatie_UPS has a reputation beyond reputeKatie_UPS has a reputation beyond reputeKatie_UPS has a reputation beyond reputeKatie_UPS has a reputation beyond reputeKatie_UPS has a reputation beyond repute
Chassis Connections

So, I'm on a team that does a lot of welding. And by a lot, I mean that every robot since I've been on the team has been welded- the arms, the frames and -the title of the thread- the chassis. The other three robots that our team has made have been kit frames. So, to incite your responses:

How do you keep your 'bot -but more specifically, your chassis- together?
  #2   Spotlight this post!  
Unread 22-07-2010, 07:16
blayde5's Avatar
blayde5 blayde5 is offline
Registered User
AKA: Abhi
FRC #3504 (Girls of Steel)
Team Role: Mentor
 
Join Date: Feb 2009
Rookie Year: 2008
Location: Pittsburgh
Posts: 71
blayde5 is a glorious beacon of lightblayde5 is a glorious beacon of lightblayde5 is a glorious beacon of lightblayde5 is a glorious beacon of lightblayde5 is a glorious beacon of light
Re: Chassis Connections

From as far back as any of the mentors and alumni have remembered, we've used Bosch-Rexroth's 3-way gussets and 2-way gussets to keep the chassis together. We used to be able to weld part of it but our welder got stolen 5 years or so back. Usually we don't find any problems with these and our chassis never really fails.
  #3   Spotlight this post!  
Unread 22-07-2010, 08:01
Billfred's Avatar
Billfred Billfred is offline
...and you can't! teach! that!
FRC #5402 (Iron Kings); no team (AndyMark)
Team Role: Mentor
 
Join Date: Feb 2004
Rookie Year: 2004
Location: The Land of the Kokomese, IN
Posts: 8,552
Billfred has a reputation beyond reputeBillfred has a reputation beyond reputeBillfred has a reputation beyond reputeBillfred has a reputation beyond reputeBillfred has a reputation beyond reputeBillfred has a reputation beyond reputeBillfred has a reputation beyond reputeBillfred has a reputation beyond reputeBillfred has a reputation beyond reputeBillfred has a reputation beyond reputeBillfred has a reputation beyond repute
Re: Chassis Connections

Most of the robots I've had a hand in were held together with bolts--then again, most of those robots have used the kit frame.

What 1618 did in 2008 (and 2815/1398 in 2010) was use rivets. 1618 used the IFI kit frame that year and simply substituted a rivet in each place where a bolt was used originally. The result (click for the big image) was rock-solid, with no problems the entire Chesapeake Regional. (Bumpers likely aided that.)

2815 and 1398 used a custom sheetmetal frame, which naturally I can't find a good photo of this morning. (The next best thing is this photo.) We had about five 3/16" rivets on each edge of the frames, along with support from running dead axles. There was then a back plate and a belly pan, also riveted together. While I wasn't in the pits as much this year, I can't think of a single report of frame trouble across two teams and five events. And just as a bonus, we were able to rip apart both drivetrains to shake out drivetrain bugs by drilling out ten rivets and undoing three bolts holding the axles in place. (Okay, fixing the drivetrain issues didn't really seem like a bonus at the time...)

I wouldn't consider rivets an automatic decision on the frame, but they're certainly a strong choice each year.
__________________
William "Billfred" Leverette - Gamecock/Jessica Boucher victim/Marketing & Sales Specialist at AndyMark

2004-2006: FRC 1293 (D5 Robotics) - Student, Mentor, Coach
2007-2009: FRC 1618 (Capital Robotics) - Mentor, Coach
2009-2013: FRC 2815 (Los Pollos Locos) - Mentor, Coach - Palmetto '09, Peachtree '11, Palmetto '11, Palmetto '12
2010: FRC 1398 (Keenan Robo-Raiders) - Mentor - Palmetto '10
2014-2016: FRC 4901 (Garnet Squadron) - Co-Founder and Head Bot Coach - Orlando '14, SCRIW '16
2017-: FRC 5402 (Iron Kings) - Mentor

94 events (more than will fit in a ChiefDelphi signature), 14 seasons, over 61,000 miles, and still on a mission from Bob.

Rule #1: Do not die. Rule #2: Be respectful. Rule #3: Be safe. Rule #4: Follow the handbook.
  #4   Spotlight this post!  
Unread 22-07-2010, 08:52
Brandon Holley's Avatar
Brandon Holley Brandon Holley is offline
Chase perfection. Catch excellence.
AKA: Let's bring CD back to the way it used to be
FRC #0125 (NU-TRONs, Team #11 Alumni (GO MORT))
Team Role: Engineer
 
Join Date: Jan 2004
Rookie Year: 2001
Location: Boston, MA
Posts: 2,593
Brandon Holley has a reputation beyond reputeBrandon Holley has a reputation beyond reputeBrandon Holley has a reputation beyond reputeBrandon Holley has a reputation beyond reputeBrandon Holley has a reputation beyond reputeBrandon Holley has a reputation beyond reputeBrandon Holley has a reputation beyond reputeBrandon Holley has a reputation beyond reputeBrandon Holley has a reputation beyond reputeBrandon Holley has a reputation beyond reputeBrandon Holley has a reputation beyond repute
Send a message via AIM to Brandon Holley
Re: Chassis Connections

In the past couple of years I've developed a pretty cool method for putting our frames (chassis) together.

Basically we have our own gussets made out of ~.060" aluminum and make them in two varieties, 'T' or 'L' (this is usually done by waterjet, and we can get the parts for around ~$1/piece). The Ts have 4, 1/8" holes and are 3" long while being 2" tall. The Ls are 3 holed around 2" X 2".

We pretty much use 1" box beam for all of our framing needs. This then allows us to put a simple hole pattern of 1/8" holes 1" apart, and 1/2" from any edge to rivet our frames together. For most applications the riveted frame is strong enough as is. However, the nice thing about doing it this way is that you have created a welding jig once riveted. If you then want to go back and beef up certain or all joints, you simply just start welding. The gussets will hold the frame extremely square, especially if you put the holes in the frame members on a bridgeport or mill.

I'll try to dig up some pictures to make life easier, but in the meantime if you have any questions feel free to ask.

EDIT: Picture found




-Brando
__________________
MORT (Team 11) '01-'05 :
-2005 New Jersey Regional Chairman's Award Winners
-2013 MORT Hall of Fame Inductee

NUTRONs (Team 125) '05-???
2007 Boston Regional Winners
2008 & 2009 Boston Regional Driving Tomorrow's Technology Award
2010 Boston Regional Creativity Award
2011 Bayou Regional Finalists, Innovation in Control Award, Boston Regional Finalists, Industrial Design Award
2012 New York City Regional Winners, Boston Regional Finalists, IRI Mentor of the Year
2013 Orlando Regional Finalists, Industrial Design Award, Boston Regional Winners, Pine Tree Regional Finalists
2014 Rhode Island District Winners, Excellence in Engineering Award, Northeastern University District Winners, Industrial Design Award, Pine Tree District Chairman's Award, Pine Tree District Winners
2015 South Florida Regional Chairman's Award, NU District Winners, NEDCMP Industrial Design Award, Hopper Division Finalists, Hopper/Newton Gracious Professionalism Award

Last edited by Brandon Holley : 23-07-2010 at 08:39.
  #5   Spotlight this post!  
Unread 22-07-2010, 09:35
Jon Stratis's Avatar
Jon Stratis Jon Stratis is offline
Mentor, LRI, MN RPC
FRC #2177 (The Robettes)
Team Role: Mentor
 
Join Date: Feb 2007
Rookie Year: 2006
Location: Minnesota
Posts: 3,813
Jon Stratis has a reputation beyond reputeJon Stratis has a reputation beyond reputeJon Stratis has a reputation beyond reputeJon Stratis has a reputation beyond reputeJon Stratis has a reputation beyond reputeJon Stratis has a reputation beyond reputeJon Stratis has a reputation beyond reputeJon Stratis has a reputation beyond reputeJon Stratis has a reputation beyond reputeJon Stratis has a reputation beyond reputeJon Stratis has a reputation beyond repute
Re: Chassis Connections

We welded a custom chassis in our second year, but have stuck with the kit-bot frame bolted together ever since. For us, welding the frame together ended up taking too long and was too mentor-intensive (and less student participation) than we want.
  #6   Spotlight this post!  
Unread 22-07-2010, 10:25
JamesCH95's Avatar
JamesCH95 JamesCH95 is offline
Hardcore Dork
AKA: JCH
FRC #0095 (The Grasshoppers)
Team Role: Engineer
 
Join Date: Dec 2004
Rookie Year: 2001
Location: Enfield, NH
Posts: 1,869
JamesCH95 has a reputation beyond reputeJamesCH95 has a reputation beyond reputeJamesCH95 has a reputation beyond reputeJamesCH95 has a reputation beyond reputeJamesCH95 has a reputation beyond reputeJamesCH95 has a reputation beyond reputeJamesCH95 has a reputation beyond reputeJamesCH95 has a reputation beyond reputeJamesCH95 has a reputation beyond reputeJamesCH95 has a reputation beyond reputeJamesCH95 has a reputation beyond repute
Re: Chassis Connections

My team has used bolt-together frames, typically plywood with angle-aluminum brackets or the kit frame. For 2010 we welded the kit frame together (saves several pounds of weight over fasteners) with some custom wheel brackets. Took 1 mentor (me) less than two hours to do at work (we had no welder at our work space). We then bolted on everything else, including some 3/8" plywood for a deck.

I would highly recommend welding the kit-frame together for the weight lost and stiffness/strength gained. It's 5052 aluminum, so it has no temper to lose through welding. If you are just welding the kit frame together it should take less than 1 hour to assemble, prep, and weld. The kit hardware holds it in place very nicely.
__________________
Theory is a nice place, I'd like to go there one day, I hear everything works there.

Maturity is knowing you were an idiot, common sense is trying to not be an idiot, wisdom is knowing that you will still be an idiot.
  #7   Spotlight this post!  
Unread 22-07-2010, 15:28
548swimmer's Avatar
548swimmer 548swimmer is offline
CAD Leader
AKA: Alec Wagner
FRC #0548 (Robostangs)
Team Role: CAD
 
Join Date: Apr 2010
Rookie Year: 2005
Location: Michigan
Posts: 299
548swimmer has much to be proud of548swimmer has much to be proud of548swimmer has much to be proud of548swimmer has much to be proud of548swimmer has much to be proud of548swimmer has much to be proud of548swimmer has much to be proud of548swimmer has much to be proud of
Re: Chassis Connections

Our team uses bolts. What we have is a "modular" system of cross supports and drive "modules."

http://www.chiefdelphi.com/forums/sh...ad.php?t=85712

Each of the side plates is .188 aluminum (6061 T6 I believe) despite my best efforts to use .125...

The round spacers between the side plates are half inch aluminum round stock tapped with 1/4-20 on each end and secured with 3/4 inch panheads.

The square tubes run from outside plate to outside plate and are 1/8 wall (I keep pushing for 1/16...) with 2 inch long inserts tapped one inch deep 1/4-20 and secured with 3/4 inch panheads.

We have found this system to be fairly lightweight, especially if you use your spacers for axles. In addition to weight, the outermost module can be quickly detached from the rest of the chassis by removing the bolts in square tubes. For wheel/chain repairs, you can simply remove the outermost side plate.
__________________
My religion is physics, it can explain everything.

WINNER -- 2011 Waterford District
District Chairman's -- 2011 Waterford District
Finalist -- 2011 Ann Arbor District
State Chairman's -- 2011 Michigan State Championship
Quarter-finalist -- 2011 Galileo
2011 Championship -- Highest Ranking Score
  #8   Spotlight this post!  
Unread 22-07-2010, 15:51
Hawiian Cadder's Avatar
Hawiian Cadder Hawiian Cadder is offline
Registered User
AKA: Isaak
FRC #0159 (Alpine Robotics)
Team Role: CAD
 
Join Date: Feb 2010
Rookie Year: 2003
Location: Fort Colins Colorado
Posts: 573
Hawiian Cadder is a name known to allHawiian Cadder is a name known to allHawiian Cadder is a name known to allHawiian Cadder is a name known to allHawiian Cadder is a name known to allHawiian Cadder is a name known to all
Re: Chassis Connections

we have always used the pancake design with aluminum plate. typically this takes around 150 metal screws. however when designing the robot this year we didn't really do the math and ended up with around 1400 holes. the box of screws, (2000 8-32 5/8 long button head) weighed almost 10 LBS. lock tight application for the whole robot took 5 people around 10 hours.

due to this, we are going for angle gussets with 1 inch box tube this year, hopefully it will be easier.
  #9   Spotlight this post!  
Unread 22-07-2010, 15:53
Jeffy's Avatar
Jeffy Jeffy is offline
Retired, for now
AKA: Jeff Gier
FRC #2410 (Metal Mustang Robotics) #159 (Alpine Robotics)
Team Role: College Student
 
Join Date: Mar 2008
Rookie Year: 2008
Location: Fort Collins
Posts: 523
Jeffy has a brilliant futureJeffy has a brilliant futureJeffy has a brilliant futureJeffy has a brilliant futureJeffy has a brilliant futureJeffy has a brilliant futureJeffy has a brilliant futureJeffy has a brilliant futureJeffy has a brilliant futureJeffy has a brilliant futureJeffy has a brilliant future
Re: Chassis Connections

We have welded our chassis all of our years as a team. For a while our rookie year we were going to use the kit chassis, so we bolted it together, welded, then removed all the bolts. I don't remember the specific weight of the bolts and supports, but it was well over 5 lbs. We ran into trouble with the kit frame warping during the welding, so we made our own, and have done so every year so far.
If you are trying to decide what to do, I would definitely weld to save some weight. The next best option (imho) are aluminum rivets. I don't know enough about them or have enough experience to give a big recomendation, but I have seen them work very well.
__________________
Metal Mustang Robotics 2410 (2008-2011)
2008 STL Rookie All-Star
2010 GKC Finalists
2010 OKC Champions
Alpine Robotics 159 (2012-)
2012 CO Finalists

700 miles from home, 2 miles from FRC. Life is good.
  #10   Spotlight this post!  
Unread 22-07-2010, 16:03
JamesCH95's Avatar
JamesCH95 JamesCH95 is offline
Hardcore Dork
AKA: JCH
FRC #0095 (The Grasshoppers)
Team Role: Engineer
 
Join Date: Dec 2004
Rookie Year: 2001
Location: Enfield, NH
Posts: 1,869
JamesCH95 has a reputation beyond reputeJamesCH95 has a reputation beyond reputeJamesCH95 has a reputation beyond reputeJamesCH95 has a reputation beyond reputeJamesCH95 has a reputation beyond reputeJamesCH95 has a reputation beyond reputeJamesCH95 has a reputation beyond reputeJamesCH95 has a reputation beyond reputeJamesCH95 has a reputation beyond reputeJamesCH95 has a reputation beyond reputeJamesCH95 has a reputation beyond repute
Re: Chassis Connections

Quote:
Originally Posted by Hawiian Cadder View Post
we have always used the pancake design with aluminum plate. typically this takes around 150 metal screws. however when designing the robot this year we didn't really do the math and ended up with around 1400 holes. the box of screws, (2000 8-32 5/8 long button head) weighed almost 10 LBS. lock tight application for the whole robot took 5 people around 10 hours.

due to this, we are going for angle gussets with 1 inch box tube this year, hopefully it will be easier.
I'd love to see a picture of this "pancake design" that used 10lbs of fasteners...
__________________
Theory is a nice place, I'd like to go there one day, I hear everything works there.

Maturity is knowing you were an idiot, common sense is trying to not be an idiot, wisdom is knowing that you will still be an idiot.
  #11   Spotlight this post!  
Unread 22-07-2010, 16:58
rahilm's Avatar
rahilm rahilm is offline
Registered User
AKA: Rahil Mehta
FRC #0668 (The Apes of Wrath)
Team Role: Mentor
 
Join Date: Oct 2009
Rookie Year: 2007
Location: San Jose, CA
Posts: 116
rahilm has a spectacular aura aboutrahilm has a spectacular aura about
Re: Chassis Connections

This year, we used lots and lots of bolts. Our whole robot was basically various sizes of aluminum angle, so we just had angle inside angle bolted together with at least 2 bolts.

In the past, we have welded (only drivetrains), used gussets and rivets, and used 80/20 extrusion.
__________________
Team 668 - Apes of Wrath - 2008-2011
Team 668 - Apes of Wrath - 2011-Present (Mentor)
  #12   Spotlight this post!  
Unread 22-07-2010, 17:12
s_forbes's Avatar
s_forbes s_forbes is offline
anonymous internet person
FRC #0842 (Falcon Robotics)
Team Role: Engineer
 
Join Date: Jan 2006
Rookie Year: 2006
Location: Phoenix, AZ
Posts: 1,147
s_forbes has a reputation beyond reputes_forbes has a reputation beyond reputes_forbes has a reputation beyond reputes_forbes has a reputation beyond reputes_forbes has a reputation beyond reputes_forbes has a reputation beyond reputes_forbes has a reputation beyond reputes_forbes has a reputation beyond reputes_forbes has a reputation beyond reputes_forbes has a reputation beyond reputes_forbes has a reputation beyond repute
Re: Chassis Connections

Through the years, we have built a bolted chassis, a riveted chassis, a glued and nailed chassis, and a welded chassis. All have held up to the stress of 2+ regionals without issues.

You can build a chassis that is strong and light in countless ways if you put enough design work into it. The thing you need to ask yourself is how you can best utilize your resources to build a strong/light chassis as quickly as possible. The faster you can finish fabricating it during the build season, the better.

I would also encourage you to take a look at the big picture when you are designing your chassis. Robot functions change drastically from year to year and greatly influence the design of the drivetrain (hence why we have gone through so many different forms). Remember that you are designing and building a complete robot; the chassis and manipulators are not always independent systems.
  #13   Spotlight this post!  
Unread 22-07-2010, 17:13
PAR_WIG1350's Avatar
PAR_WIG1350 PAR_WIG1350 is offline
Registered User
AKA: Alan Wells
FRC #1350 (Rambots)
Team Role: Alumni
 
Join Date: Dec 2009
Rookie Year: 2009
Location: Rhode Island
Posts: 1,190
PAR_WIG1350 has a reputation beyond reputePAR_WIG1350 has a reputation beyond reputePAR_WIG1350 has a reputation beyond reputePAR_WIG1350 has a reputation beyond reputePAR_WIG1350 has a reputation beyond reputePAR_WIG1350 has a reputation beyond reputePAR_WIG1350 has a reputation beyond reputePAR_WIG1350 has a reputation beyond reputePAR_WIG1350 has a reputation beyond reputePAR_WIG1350 has a reputation beyond reputePAR_WIG1350 has a reputation beyond repute
Re: Chassis Connections

1350 uses bolts and nyloc nuts everywhere. It makes prototyping easy since we can easily build, test, and rebuild any part (easy until you find you built an integral structural or functional component directly over the bolt head you need to get to which can't be moved since EVERYTHING is bolted onto it, but thats OK, it builds dexterity). The real issue comes when everyone is fighting to use one drill bit or wrench that is the only one of its size and happens to be the correct one for EVERY bolt on the robot.

We also like zip-ties, but not so much for the chassis.
__________________
  #14   Spotlight this post!  
Unread 22-07-2010, 17:18
Chris is me's Avatar
Chris is me Chris is me is offline
no bag, vex only, final destination
AKA: Pinecone
FRC #0228 (GUS Robotics); FRC #2170 (Titanium Tomahawks)
Team Role: Mentor
 
Join Date: Dec 2008
Rookie Year: 2006
Location: Glastonbury, CT
Posts: 7,737
Chris is me has a reputation beyond reputeChris is me has a reputation beyond reputeChris is me has a reputation beyond reputeChris is me has a reputation beyond reputeChris is me has a reputation beyond reputeChris is me has a reputation beyond reputeChris is me has a reputation beyond reputeChris is me has a reputation beyond reputeChris is me has a reputation beyond reputeChris is me has a reputation beyond reputeChris is me has a reputation beyond repute
Send a message via AIM to Chris is me
Re: Chassis Connections

Quote:
Originally Posted by Katie_UPS View Post
So, I'm on a team that does a lot of welding. And by a lot, I mean that every robot since I've been on the team has been welded- the arms, the frames and -the title of the thread- the chassis. The other three robots that our team has made have been kit frames. So, to incite your responses:

How do you keep your 'bot -but more specifically, your chassis- together?
This isn't strictly true. http://www.chiefdelphi.com/media/photos/24740

Anyway, Shaker used a pretty simple - if non optimized - chassis with some 1/4" AL plate, standoffs, and 80/20 extrusion to connect the two wheel modules. Standoffs were made on a lathe and secured with 1/4-20 bolts (1/2 bolts for the combination standoffs and axles), and the 80-20 was fastened by tapping the extrusion's holes and bolting them onto the chassis. It weighed a fairly reasonable weight: I think a fully driving base with compressor and everything was 65-70 pounds, with no attempts at all to reduce weight. (We wanted a low CG and we were consistently underweight the entire year)



The chassis worked just fine all year, but it really isn't that well designed. Look at the cross section and you'll see it's a lot more C-shaped than we wanted. Prechargning a pneumatic kicker caused it to noticeably deflect. We also had the electronics mounted several inches higher than we needed to which took room away from a hanger. If we did it again I would take the 80-20 structure and mount it much lower on the chassis.
__________________
Mentor / Drive Coach: 228 (2016-?)
--2016 Waterbury SFs (with 3314, 3719), RIDE #2 Seed / Winners (with 1058, 6153), Carver QFs (with 503, 359, 4607)
Mentor / Consultant Person: 2170 (2017-?)
.
College Mentor: 2791 (2010-2015)
-- 2015 TVR Motorola Quality, FLR GM Industrial Design -- 2014 FLR Motorola Quality / SFs (with 341, 4930)
-- 2013 BAE Motorola Quality, WPI Regional #1 Seed / Delphi Excellence in Engineering / Finalists (with 20, 3182)
-- 2012 BAE Imagery / Finalists (with 1519, 885), CT Xerox Creativity / SFs (with 2168, 118)
Student: 1714 (2009) - 2009 MN 10K Lakes Regional Winners (with 2826, 2470)
2791 Build Season Photo Gallery - Look here for mechanism photos My Robotics Blog (Updated April 11 2014)
  #15   Spotlight this post!  
Unread 22-07-2010, 23:35
Aren Siekmeier's Avatar
Aren Siekmeier Aren Siekmeier is offline
on walkabout
FRC #2175 (The Fighting Calculators)
Team Role: Mentor
 
Join Date: Apr 2008
Rookie Year: 2008
Location: 대한민국
Posts: 735
Aren Siekmeier has a reputation beyond reputeAren Siekmeier has a reputation beyond reputeAren Siekmeier has a reputation beyond reputeAren Siekmeier has a reputation beyond reputeAren Siekmeier has a reputation beyond reputeAren Siekmeier has a reputation beyond reputeAren Siekmeier has a reputation beyond reputeAren Siekmeier has a reputation beyond reputeAren Siekmeier has a reputation beyond reputeAren Siekmeier has a reputation beyond reputeAren Siekmeier has a reputation beyond repute
Re: Chassis Connections

2007 we used kit chassis with LOTS of loose bolts (I wasn't around then, but many alumni have memories of the robot dropping things everywhere during matches and in the pits)

2008 was a little different. We used kit chassis rails that we bent around a bunch a bunch to make a cool looking but structurally weak octagonal frame with an indent in front for the trackball, and then bolted a bunch of 80/20 up off of that. The 80/20 was quite strong, and fortunately the chassis rail didn't have any problems.

2009 (yay for the basement!) we had kitbot chassis on the bottom and then two sheets of plywood up the sides. Everything inside the bot was then bolted to this plywood, with a nice plywood roof to top it off, making for a rather sturdy setup.

2010 we welded for the first time thanks to a local prototyping company who did it for free . It was definitely the strongest we had ever made. We used the chassis for wheel mounting convenience and then aluminum box tube for a superstructure around that. Initially it was all riveted together, and then we sent it in to be welded, with gusset plates at the corners.

Attached are pictures from the years I could find.
Attached Thumbnails
Click image for larger version

Name:	2008.JPG
Views:	76
Size:	145.0 KB
ID:	9222  Click image for larger version

Name:	2009.JPG
Views:	73
Size:	141.0 KB
ID:	9223  Click image for larger version

Name:	2010.JPG
Views:	96
Size:	146.8 KB
ID:	9224  
Closed Thread


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Encoder Connections TonyP CAN 1 08-02-2010 22:26
Jumper Connections Lord Byron Electrical 4 26-01-2009 20:43
Field Connections? xxMORT11xx FRC Control System 4 24-01-2009 21:51
New AM C-Base Chassis vs. Old IFI KitBot Chassis? ChuckDickerson Kit & Additional Hardware 5 06-01-2009 08:36
Frame connections manleycor Technical Discussion 15 18-11-2003 01:14


All times are GMT -5. The time now is 02:13.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi