|
|
|
![]() |
|
|||||||
|
||||||||
|
|
Thread Tools | Rate Thread | Display Modes |
|
#9
|
||||
|
||||
|
Re: paper: Killer Bees 2011 Robotics Season Journal
One point I got out of it was the significant advantage of the bag-n-tag events for your first event. We basically had to shut down testing on ship day at noon to get the robot crated for FedEx pickup. Killer Bees worked until 11:30 P.M. before bagging and tagging.
We could have done a lot of tuning and testing during that last day. (And we needed it) ![]() |
| Thread Tools | |
| Display Modes | Rate This Thread |
|
|