|
|
|
![]() |
|
|||||||
|
||||||||
|
|
Thread Tools |
Rating:
|
Display Modes |
|
#2
|
||||
|
||||
|
Re: pic: Updated Sheet Metal Design- Swerve
You probably want to put flanges on the top and bottom of the left and right side plates. It adds quite a bit of strength to the metal. Also, you could remove a bit more metal from the front of the frame.
|
| Thread Tools | |
| Display Modes | Rate This Thread |
|
|