Go to Post Maybe this thread should be re-titled "Waiting impatiently for the 2011 hint!" since having over 100 posts doesn't seem very patient. - Joe Ross [more]
Home
Go Back   Chief Delphi > ChiefDelphi.com Website > Extra Discussion
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
 
 
Thread Tools Rate Thread Display Modes
Prev Previous Post   Next Post Next
  #6   Spotlight this post!  
Unread 21-01-2013, 14:42
Mk.32's Avatar
Mk.32 Mk.32 is offline
Registered User
AKA: Mark
FRC #2485 (W.A.R. Lords)
Team Role: Engineer
 
Join Date: Jan 2011
Rookie Year: 2011
Location: San Diego
Posts: 769
Mk.32 has much to be proud ofMk.32 has much to be proud ofMk.32 has much to be proud ofMk.32 has much to be proud ofMk.32 has much to be proud ofMk.32 has much to be proud ofMk.32 has much to be proud ofMk.32 has much to be proud ofMk.32 has much to be proud ofMk.32 has much to be proud of
Re: pic: 3647 Frame

Quote:
Originally Posted by AllenGregoryIV View Post
I'm a believer in the standardized bolt pattern and we did them with hand drawn lines and a cheap drill press. One of my students did 1700 holes over a 3 day weekend. I tried to get her help but she said it would be faster if she drilled everyone and just had other team members mark them for her. We hand cut the gussets on a band saw and drilled them with printed templates.

Some of the bars can be seen in this post.

We ended up needing the holes very often for design changes. We added a separate section to our ball elevator in about an hour because we already had all the holes ready. I'd really like to see more teams use this construction method.

Are you using all 1/8" or is most of that 1/16"? We did all 1/16" and only had a few poles bend due to ramming into the bridges but otherwise it worked out perfectly.
Wow.. I can't even think about doing all those holes by hand...... #SpoiledByCNC

The 2x1 is all 1/8th and the rest of the structure is a mix depending on what joints require more strength, we did have some bending issues with 1/16th last year and the bridge as well.
__________________
Engineering mentor: Team 2485: WARLords 2013-

Team President: Team 3647 2010-2013
Reply With Quote
 


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -5. The time now is 19:18.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi