Go to Post Stop being LAWYERS and start being ENGINEERS! - dlavery [more]
Home
Go Back   Chief Delphi > ChiefDelphi.com Website > Extra Discussion
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
Reply
 
Thread Tools Rate Thread Display Modes
  #1   Spotlight this post!  
Unread 07-09-2016, 13:45
nuclearnerd's Avatar
nuclearnerd nuclearnerd is offline
Speaking for myself, not my team
AKA: Brendan Simons
FRC #5406 (Celt-X)
Team Role: Engineer
 
Join Date: Jan 2014
Rookie Year: 2014
Location: Hamilton, Ontario, Canada
Posts: 440
nuclearnerd has much to be proud ofnuclearnerd has much to be proud ofnuclearnerd has much to be proud ofnuclearnerd has much to be proud ofnuclearnerd has much to be proud ofnuclearnerd has much to be proud ofnuclearnerd has much to be proud ofnuclearnerd has much to be proud ofnuclearnerd has much to be proud ofnuclearnerd has much to be proud of
Re: paper: Stop the Stop Build

Quote:
Originally Posted by Chris is me View Post
The compromise solution presented here is brilliant, and is something that could be implemented immediately without any logistical changes on FIRST's end. 8 hours of unbag time a week for all teams would be a huge improvement over the current system, and I suspect it would eliminate the need for practice robots for many mid tier teams. Upper level teams may still choose to build one, but the advantage gained over everyone else would be reduced.
+1.

The only question I have with the compromise (and this applies to existing district rules) is: Doesn't unbag time become an unlimited withholding allowance? What is stopping teams from tying a bunch of spare parts to the robot before re-bagging it? If that's not really a concern, is there any point in keeping a 30lb withholding allowance?
Reply With Quote
  #2   Spotlight this post!  
Unread 07-09-2016, 13:59
FrankJ's Avatar
FrankJ FrankJ is offline
Robot Mentor
FRC #2974 (WALT)
Team Role: Mentor
 
Join Date: Feb 2011
Rookie Year: 2009
Location: Marietta GA
Posts: 1,886
FrankJ has a reputation beyond reputeFrankJ has a reputation beyond reputeFrankJ has a reputation beyond reputeFrankJ has a reputation beyond reputeFrankJ has a reputation beyond reputeFrankJ has a reputation beyond reputeFrankJ has a reputation beyond reputeFrankJ has a reputation beyond reputeFrankJ has a reputation beyond reputeFrankJ has a reputation beyond reputeFrankJ has a reputation beyond repute
Re: paper: Stop the Stop Build

Quote:
Originally Posted by nuclearnerd View Post
+1.

The only question I have with the compromise (and this applies to existing district rules) is: Doesn't unbag time become an unlimited withholding allowance? What is stopping teams from tying a bunch of spare parts to the robot before re-bagging it? If that's not really a concern, is there any point in keeping a 30lb withholding allowance?
Under current rules, District teams are suppose to respect the withholding allowance during the unbag time. Admittedly the only thing that keeps teams from unlimited spare parts is respect for the rules.

One advantage of district unbag is you are in your shop. You are allowed to fabricate unlimited amount of parts during the unbag window.
__________________
If you don't know what you should hook up then you should read a data sheet
Reply With Quote
  #3   Spotlight this post!  
Unread 07-09-2016, 14:03
Chris is me's Avatar
Chris is me Chris is me is offline
no bag, vex only, final destination
AKA: Pinecone
FRC #0228 (GUS Robotics); FRC #2170 (Titanium Tomahawks)
Team Role: Mentor
 
Join Date: Dec 2008
Rookie Year: 2006
Location: Glastonbury, CT
Posts: 7,587
Chris is me has a reputation beyond reputeChris is me has a reputation beyond reputeChris is me has a reputation beyond reputeChris is me has a reputation beyond reputeChris is me has a reputation beyond reputeChris is me has a reputation beyond reputeChris is me has a reputation beyond reputeChris is me has a reputation beyond reputeChris is me has a reputation beyond reputeChris is me has a reputation beyond reputeChris is me has a reputation beyond repute
Send a message via AIM to Chris is me
Re: paper: Stop the Stop Build

Quote:
Originally Posted by nuclearnerd View Post
+1.

The only question I have with the compromise (and this applies to existing district rules) is: Doesn't unbag time become an unlimited withholding allowance? What is stopping teams from tying a bunch of spare parts to the robot before re-bagging it? If that's not really a concern, is there any point in keeping a 30lb withholding allowance?
The withholding allowance rules also apply during unbag windows. You cannot introduce more than 30 pounds of non-COTS parts machined outside of the window, during the unbag window. You also get just one withholdling allowance for both the unbag window and the district event the same week as the window (District unbag times are tied to competing at events) - so it's not like you can put 30 pounds on at the shop and 30 pounds more at the event.

You can introduce as many parts as you want that were machined during the unbag window, into the bag.
__________________
Mentor / Drive Coach: 228 (2016-?)
...2016 Waterbury SFs (with 3314, 3719), RIDE #2 Seed / Winners (with 1058, 6153), Carver QFs (with 503, 359, 4607)
Mentor / Consultant Person: 2170 (2017-?)
---
College Mentor: 2791 (2010-2015)
...2015 TVR Motorola Quality, FLR GM Industrial Design
...2014 FLR Motorola Quality / SFs (with 341, 4930)
...2013 BAE Motorola Quality, WPI Regional #1 Seed / Delphi Excellence in Engineering / Finalists (with 20, 3182)
...2012 BAE Imagery / Finalists (with 1519, 885), CT Xerox Creativity / SFs (with 2168, 118)
Student: 1714 (2009) - 2009 Minnesota 10,000 Lakes Regional Winners (with 2826, 2470)
2791 Build Season Photo Gallery - Look here for mechanism photos My Robotics Blog (Updated April 11 2014)
Reply With Quote
  #4   Spotlight this post!  
Unread 07-09-2016, 14:16
Joe Johnson's Avatar Unsung FIRST Hero
Joe Johnson Joe Johnson is offline
Engineer at Medrobotics
AKA: Dr. Joe
FRC #0088 (TJ2)
Team Role: Engineer
 
Join Date: May 2001
Rookie Year: 1996
Location: Raynham, MA
Posts: 2,629
Joe Johnson has a reputation beyond reputeJoe Johnson has a reputation beyond reputeJoe Johnson has a reputation beyond reputeJoe Johnson has a reputation beyond reputeJoe Johnson has a reputation beyond reputeJoe Johnson has a reputation beyond reputeJoe Johnson has a reputation beyond reputeJoe Johnson has a reputation beyond reputeJoe Johnson has a reputation beyond reputeJoe Johnson has a reputation beyond reputeJoe Johnson has a reputation beyond repute
Re: paper: Stop the Stop Build

This is my main argument for just ripping the band-aide off rather than going with the 8 hour per week window: The rules around withholding are already a hot mess, I can see how this 8 hour per week rule could make this situation worse.

If the only way I can get rid of the stop build rule is to make this half step happen for a few years, then I'll take it and be happy but I would much rather just make a clean break. Kill the bags, kill the tags, kill the entire withholding rules...

Dr. Joe J.
__________________
Joseph M. Johnson, Ph.D., P.E.
Mentor
Team #88, TJ2
Reply With Quote
  #5   Spotlight this post!  
Unread 07-09-2016, 14:17
Allison K's Avatar
Allison K Allison K is offline
Registered User
AKA: Allison Kneisler
FRC #3538 (Avondale RoboJackets)
Team Role: Mentor
 
Join Date: Sep 2003
Rookie Year: 2003
Location: Troy, MI
Posts: 585
Allison K has a reputation beyond reputeAllison K has a reputation beyond reputeAllison K has a reputation beyond reputeAllison K has a reputation beyond reputeAllison K has a reputation beyond reputeAllison K has a reputation beyond reputeAllison K has a reputation beyond reputeAllison K has a reputation beyond reputeAllison K has a reputation beyond reputeAllison K has a reputation beyond reputeAllison K has a reputation beyond repute
Re: paper: Stop the Stop Build

Quote:
Originally Posted by Chris is me View Post
The withholding allowance rules also apply during unbag windows. You cannot introduce more than 30 pounds of non-COTS parts machined outside of the window, during the unbag window. You also get just one withholdling allowance for both the unbag window and the district event the same week as the window (District unbag times are tied to competing at events) - so it's not like you can put 30 pounds on at the shop and 30 pounds more at the event.

You can introduce as many parts as you want that were machined during the unbag window, into the bag.
While definitely a sound interpretation of the 2016 withholding rules, that sounds awful to try to keep track of in the context of a weekly unbag period... Uh, how many pounds did we add on last week? Was that part made inside or outside of the window? What's the total weight of parts we made outside of the window between last event and our next one?

Would a withholding even be necessary with a weekly unbag period? I suppose that might hurt teams that use withholding to keep their control system out so that they can use it on a practice/twin or test bed without having to buy duplicates of all the (rather costly for some teams) components. Would also get messy with regards to sending out parts to a sponsor... since it couldn't be withholding and would be impractical to try to have the machining done during the same window of the time the team is meeting (and even if it was practical, that's an awkward interpretation of unbag time).
__________________
FRC3538 : RoboJackets : 2014-??? : Head Coach & Drive Coach
FRC226 : Hammerheads : 2003-2013 : Strategist
Reply With Quote
Reply


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -5. The time now is 10:44.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi