|
|
|
![]() |
|
|||||||
|
||||||||
![]() |
|
|
Thread Tools | Rate Thread | Display Modes |
|
|
|
#1
|
||||
|
||||
|
Re: paper: Stop the Stop Build
Quote:
You can introduce as many parts as you want that were machined during the unbag window, into the bag. |
|
#2
|
||||||
|
||||||
|
Re: paper: Stop the Stop Build
This is my main argument for just ripping the band-aide off rather than going with the 8 hour per week window: The rules around withholding are already a hot mess, I can see how this 8 hour per week rule could make this situation worse.
If the only way I can get rid of the stop build rule is to make this half step happen for a few years, then I'll take it and be happy but I would much rather just make a clean break. Kill the bags, kill the tags, kill the entire withholding rules... Dr. Joe J. |
|
#3
|
||||
|
||||
|
Re: paper: Stop the Stop Build
Quote:
Would a withholding even be necessary with a weekly unbag period? I suppose that might hurt teams that use withholding to keep their control system out so that they can use it on a practice/twin or test bed without having to buy duplicates of all the (rather costly for some teams) components. Would also get messy with regards to sending out parts to a sponsor... since it couldn't be withholding and would be impractical to try to have the machining done during the same window of the time the team is meeting (and even if it was practical, that's an awkward interpretation of unbag time). |
![]() |
| Thread Tools | |
| Display Modes | Rate This Thread |
|
|