Re: pic: Team 1538's Machined Parts (C)
I believe there were somewhere around 10 lathe operations and 1 CNC operation on a Fadal. Roughly 1.5-2 hours per wheel. Of the 10 lathe operations, 6 were to create the recesses on each side (3 per side), 2 were to true up up both sides (1 per side), 1 to take the diameter down to size and the last was to create the groove where the tread goes. The Fadal operation was used to break some of the edges and then cut out the pattern in the middle.
|
| Thread Tools | |
| Display Modes | Rate This Thread |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Pinion not machined correctly | Coachmac | Kit & Additional Hardware | 2 | 14-01-2005 10:28 |
| Must Return Spare Parts to Small Parts? | Pierson | Rules/Strategy | 10 | 20-03-2004 09:34 |
| pic: Team 60 Drive Train Parts | CD47-Bot | Robot Showcase | 17 | 07-02-2004 01:58 |
| Parts dropped from the 2003 Kit of Parts? | D.J. Fluck | Rumor Mill | 38 | 03-01-2003 19:29 |
| Machined Wheels | sanddrag | Technical Discussion | 6 | 20-09-2002 23:01 |