Go to Post Mentors need to be sure that the team is on track to have a working robot ready. Students can do almost everything, but they need help watching the calender. Even if your ideas turn out bad, if your robot is inspectable and running when you arrive at your first event, anything can happen. - AcesPease [more]
Home
Go Back   Chief Delphi > ChiefDelphi.com Website > Extra Discussion
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
 
 
Thread Tools Rate Thread Display Modes
Prev Previous Post   Next Post Next
  #14   Spotlight this post!  
Unread 29-01-2007, 10:39
Ray Jenkins Ray Jenkins is offline
Registered User
FRC #0449
 
Join Date: Dec 2006
Location: East Coast
Posts: 2
Ray Jenkins is an unknown quantity at this point
Post Re: pic: MiniMe

Quote:
Originally Posted by dhoizner View Post
Did you find that the diamond plate provided an adequate grip for robots to climb up? For some reason, in my mind diamond plate equals slippery, and im not sure if all robots will be able to climb that (Please correct me if I'm wrong).

Other than that, it looks great!
Team 449 Found Fiberglass reinforced resin Grid. Used as grating in corrosive chemical conditions. Has embedded grit on side and smooth on the other. 1%deflection with 3 foot span and 260Ib load. 2.2 Ibs /Sqft. Is there any reason to have the middle? 1’ of a ramp? To save weight is there a wheel configuration that would have a problem with a ramp made of 2 tracks say 12” wide?
Reply With Quote
 


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -5. The time now is 11:13.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi