Re: pic: Dean Kamen with 2630
David,
The pits were outside the arena in a very big and long tent, a small sleeve (like in an airport when boarding a plane) connected the pits to the stadium directly.
The setup was changed because there were 36 teams this year which meant that if they were to be housed inside we would again have to go for the split-pit (funny word) setup where half are inside, close to the floor, and half are on the outskirts of the building (in the peripheral rings).
this causes some problems:
1)there is no 1 pit administration.
2)teams on the outskirts feel neglected and they are not viewed as much as the other teams.
also, the peripheral rings were almost entirely closed off due to renovations.
all in all it was a very good call in my opinion and I hope they go for a similar setup next year....
-Leav
__________________
"We choose to build robots this season and do the other things; Not because they are easy, but because they are hard." -Paraphrasing JFK
Participated in FIRST as a student: 2005-2006 (But still learning every season!)
Mentor: 2008 - ? (Team 2630 2008-2011, and Team 3316 since 2013)
Engineer: 2011 - ? (B.Sc. and M.Sc. in Mech. Eng. from the Technion IIT)
FIRST Volunteer - 2007 - ? (MC, FTA, FIRST Aid etc.)
|