|
|
|
![]() |
|
|||||||
|
||||||||
![]() |
| Thread Tools | Rate Thread | Display Modes |
|
#1
|
||||
|
||||
|
pic: 3 Hour Chassis + 2 Hours
|
|
#2
|
||||
|
||||
|
Re: pic: 3 Hour Chassis + 2 Hours
If you can I would get the extended output shaft that AM sells and make the center wheel direct drive.
Also how do you plan to tension the chains that your using and what size chain are you looking at? Also the chain runs on the bottom look like they will run into the square tube... In inventor with design accelerator you can generate chain runs so that you can check for clearance. If you in solidworks I think there is a way to do the same thing. Last edited by Jeff 801 : 11-05-2010 at 14:12. Reason: More questions |
|
#3
|
||||
|
||||
|
Re: pic: 3 Hour Chassis + 2 Hours
It's looking a ton better!
You'll need some way to attach the tube supports to your outer plate. We use 1.5"x3/4"x3/4" press-fit stock tapped with 1/4-20 to do this. The tubes should have material underneath them. There's no constraint tool in real life, so spacers have a hard time just hanging there. Think about the assembly process when you're designing robots, that helps me the most. You can usually just pound them through with a gentle persuasion tool if the hole is a tad small. If at all possible, the design would be a lot stronger if you move the tube supports so that they are not all along the same line. Are you running both chains on the same side? Last edited by 548swimmer : 11-05-2010 at 14:08. |
|
#4
|
|||
|
|||
|
Re: pic: 3 Hour Chassis + 2 Hours
I agree, get the tubes to at LEAST be in 2 planes.
Perhaps also consider mounting your battery laying down on the bottom of your robot. That way you don't have to reach through anything. I would also only have the cross supports go to the inner side plates. Use the standoffs and some wood blocks to support the outer ones. |
|
#5
|
||||
|
||||
|
Re: pic: 3 Hour Chassis + 2 Hours
I agree with the direct-drive on the center wheels, that will get all of the heaviest objects directly over your primary drive axle, and close to the center of rotation.
It's hard to tell from your drawing if you have done this or not, but if you chose to, you could eliminate the face plate of the toughbox by machining your 1/8" plates with the proper bearing and shaft holes. |
|
#6
|
||||
|
||||
|
Re: pic: 3 Hour Chassis + 2 Hours
Quote:
|
|
#7
|
||||
|
||||
|
Re: pic: 3 Hour Chassis + 2 Hours
Quote:
I've had good luck with carbide tooling and heavy feeds on 6, 2, and 7 series alloys. I assume because you're planning on welding it you're going to use a 5 series alloy, which has a "poor" machinability rating, which may well be your problem. |
|
#8
|
||||
|
||||
|
Re: pic: 3 Hour Chassis + 2 Hours
Quote:
|
|
#9
|
||||
|
||||
|
Re: pic: 3 Hour Chassis + 2 Hours
There's a chain reduction, so direct driving the center wheel isn't possible without a gearing change.
|
|
#10
|
||||
|
||||
|
Re: pic: 3 Hour Chassis + 2 Hours
Quote:
______ |xxxxxx| |xxxxxx| |_____| so the center piece falls out. If you can use a 1/16 or 1/4 bit you can cut past the needed length/width just enough so that you end up with squared corners. |
|
#11
|
||||
|
||||
|
Re: pic: 3 Hour Chassis + 2 Hours
6061 loses its temper when it's welded, so your 6061T6 becomes 6061T0, which according to wikipedia is an 80% loss in strength, which is what I've noticed/experienced with the welding and mechanical testing I've done.
Welding two aluminum alloy's together hasn't been an issue for me. Most, if not all, aluminum alloys will weld fine with the same filler material, so there shouldn't be much of an issue welding different alloys. Haas CNCs are pretty good machines, I used one in college. Tooling, though, shouldn't be confused with the mill itself. You could have the best CNC on the planet, but if a low-quality HSS endmill is chucked up it'll run like crap. Look into solid carbide tooling, if you're CNC'ing plates you could easily get away with a 1/4" end mill, or maybe smaller. McMaster: 8829A19 about $24 for an end mill that will make you many a robot frame. If you have good compressed air for chip clearing you could get a 4-flute which is even less expensive. IMHO, if you want to weld the chassis together (which I heartily approve of) you should CNC your side plates from 5052 (which has no temper and won't lose strength when welded) and then use AndyMark/KOP extrusions for your cross-bracing. It'll be a little less expensive, and you'll get tons of 1/4" mounting holes. My team's most recent chassis was made from CNC'ed and bent 5052 TIG welded to the KOP frame. I did the welding and found the 1/8" 5052 to be a very forgiving material to TIG. We dropped 3-4lbs in fasteners IIRC. |
|
#12
|
||||
|
||||
|
Re: pic: 3 Hour Chassis + 2 Hours
Good point, but in the previous thread on this topic the OP mentioned making custom gearboxes.
|
|
#13
|
||||
|
||||
|
Re: pic: 3 Hour Chassis + 2 Hours
Quote:
Or on the back side of that wheel the sprocket is smaller than all the others and after looking at the AndyMark website the smallest sprocket (#25 I am assuming) is 32 tooth and the sprocket on the toughbox output shaft is still 16 that means the overall reduction is 25.5:1 and the top speed is 4.57ft/s From what I know your average single speed robot is ~9ft/s which would cause me to thing there is some sort of difference in the toughbox or the extra chain reduction can be removed and supplemented with one of the many gearing options AndyMark has for sale. After going back to the old thread I see that your wanting to get ~12ft/s which you can do by using the Toughbox with the optional 9.87:1 and direct drive which would give you ~11.82 ft/s Last edited by Jeff 801 : 11-05-2010 at 17:48. Reason: More info |
|
#14
|
||||
|
||||
|
Re: pic: 3 Hour Chassis + 2 Hours
You could consider a 1x1 bar of 80/20 insead of what you have for the cross pieces. The ends can be tapped for a 1/4 20 bolt and you can just bolt it to the outer plate. This also leaves you a lot of flexibilty on the inside as far as mounting other components.
I think it would work nicely in a prototype like this. My team actually used a very similar frame to this this year, aluminum side plates, cross beams extending to the outer plate, toughbox transmission etc...Anyway the 80/20 worked nicely for us on the cross braces. |
|
#15
|
||||
|
||||
|
Re: pic: 3 Hour Chassis + 2 Hours
Quote:
|
![]() |
| Thread Tools | |
| Display Modes | Rate This Thread |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| pic: 3 Hour Drivetrain | Ty Tremblay | Extra Discussion | 8 | 11-05-2010 16:47 |
| pic: How many hours at robotics to get to this point? | samir13k | Extra Discussion | 8 | 26-02-2009 08:50 |
| pic: Spam Drive Team After Hours | GateRunner | Extra Discussion | 19 | 08-04-2005 17:11 |
| pic: 11 hours from ship (1002) | Jonz0r | Robot Showcase | 4 | 24-02-2005 18:35 |
| One hour Chassis? | Josh Hambright | Technical Discussion | 23 | 07-02-2003 10:08 |