#1
|
|||||
|
|||||
|
Re: pic: Iron Devil's Critical Design Review at Lockheed Martin - Moorestown
About how long does it take to get through a single team's full review? We're wanting to do something similar and just need some guidance on how long a subteam's presentation should be, and how long to allocate for review comments. I was thinking 3 hours total, is that about right?
|
|
#2
|
|||||
|
|||||
|
Re: pic: Iron Devil's Critical Design Review at Lockheed Martin - Moorestown
Don,
The presentations in all took about 2 1/2 hours at maximum. I believe that our final review was about 75 slides and took from 30-45 minutes for our team. If you would like I can upload the presentation as a paper to give you an idea of how it looked. |
|
#3
|
|||||
|
|||||
|
Re: pic: Iron Devil's Critical Design Review at Lockheed Martin - Moorestown
I was curious because we do a similar review with engineers from our major sponsors. I know there are a few teams that do this and it is always good to understand what others do.
Ours is about 2 - 2-1/2 hours long and we have the review around week 4 of the build season. |
|
#4
|
|||||
|
|||||
|
Re: pic: Iron Devil's Critical Design Review at Lockheed Martin - Moorestown
Thanks for posting this Rob.
This really is a great experience for our students as they get to present their design process and other team projects to key stakeholders at Lockheed Martin and our school district. The CDR is usually run at the end of week 4. The students work with their mentors to make up the slideshow and practice their 30-40 minute presentation. After the 30-40 minute presentation, the students who presented all come onto the stage to answer questions from the VIP panel and audience. |
![]() |
| Thread Tools | |
| Display Modes | Rate This Thread |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Lockheed Martin/5th Gear Game Simulator... | ttldomination | General Forum | 1 | 27-01-2009 21:44 |
| Lockheed Martin Teams | Martinez | General Forum | 10 | 27-10-2007 15:55 |
| looking for Lockheed Martin Sponsored Teams | GeorgeTheEng | General Forum | 11 | 24-07-2005 22:33 |
| White Paper Discuss: Cyber Blue 234 Design Review Process 2004 | CD47-Bot | Extra Discussion | 1 | 18-03-2004 22:51 |
| Lockheed Martin + F-35 = Good... | David Kelly | General Forum | 3 | 02-11-2001 18:47 |