Go to Post It's very confusing to other people on the message boards when you make things up that are incorrect and assert them as fact. Please don't do this. - Dave Flowerday [more]
Home
Go Back   Chief Delphi > Competition > Rules/Strategy
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
Closed Thread
Thread Tools Rate Thread Display Modes
  #1   Spotlight this post!  
Unread 28-01-2013, 11:42
rsisk's Avatar
rsisk rsisk is offline
The GURU Channel
AKA: Richard Sisk
FRC #2493 (Robokong)
Team Role: Mentor
 
Join Date: Jan 2008
Rookie Year: 2007
Location: Riverside, CA
Posts: 2,747
rsisk has a reputation beyond reputersisk has a reputation beyond reputersisk has a reputation beyond reputersisk has a reputation beyond reputersisk has a reputation beyond reputersisk has a reputation beyond reputersisk has a reputation beyond reputersisk has a reputation beyond reputersisk has a reputation beyond reputersisk has a reputation beyond reputersisk has a reputation beyond repute
Send a message via MSN to rsisk
Power Distribution Board visibility for inspection

Our team is using a long version of the Kit Bot drive train and we mounted our Power Distribution Board under the motors. We are now concerned about visibility during inspections as covered by the rule...

R42
The PD Board and all circuit breakers must be easily visible for Inspection.

We think it is visible, you can see the wires connected to the board, the breakers on the board, and the connections for the Radio power supply and cRIO. It does take some effort, looking around the motors and removing the battery, but we think the board is visible, the part that worries me is the word "easily".

Reconfiguring the electronics board at this point would be tough.

Looking for opinions of what we might face during inspection.

__________________
Quote:
The views expressed are mine and should not be construed to represent the views of anyone else.
  #2   Spotlight this post!  
Unread 28-01-2013, 11:48
ehochstein's Avatar
ehochstein ehochstein is offline
Coach, Volunteer & Mentor
AKA: Evan Hochstein
FTC #5943 (ESGM)
Team Role: Coach
 
Join Date: Jan 2009
Rookie Year: 2007
Location: Bloomington, Minnesota
Posts: 932
ehochstein has a brilliant futureehochstein has a brilliant futureehochstein has a brilliant futureehochstein has a brilliant futureehochstein has a brilliant futureehochstein has a brilliant futureehochstein has a brilliant futureehochstein has a brilliant futureehochstein has a brilliant futureehochstein has a brilliant futureehochstein has a brilliant future
Re: Power Distribution Board visibility for inspection

Tie the wires together, label and shorten them as much as possible. The longer an inspector spends with your robot the more things they will find wrong.

I believe inspectors have to make sure the correct snap-action breaker is in the correct slot. From the perspective of the picture (I would call this the "easy perspective") you cannot do that therefore you would fail inspection until the breakers were visible. Last time I was an inspector at a regional was 2011, so if I am wrong and something has changed please let me know.

Also if any of your breakers fail during a match how do you expect to replace them? Place your PD on top of the hex tubes instead.
__________________
Minnesota FIRST Senior Mentor | 2013-?

Stratasys Applications Engineering Technician | 2016-?

2009 Regional Win – 2470 @ 10k Lakes (Thanks 2826 and 1714)
2013 WFFA Recipient – 2470 @ 10K Lakes
2016 Ri3D: 'Snow Problem Reveal

The opinions expressed above are the personal opinions of the author and do not necessarily represent the views and opinions of any organization the author is affiliated with.

Last edited by ehochstein : 28-01-2013 at 11:52.
  #3   Spotlight this post!  
Unread 28-01-2013, 12:08
EricVanWyk EricVanWyk is offline
Registered User
no team
 
Join Date: Jan 2007
Rookie Year: 2000
Location: Boston
Posts: 1,597
EricVanWyk has a reputation beyond reputeEricVanWyk has a reputation beyond reputeEricVanWyk has a reputation beyond reputeEricVanWyk has a reputation beyond reputeEricVanWyk has a reputation beyond reputeEricVanWyk has a reputation beyond reputeEricVanWyk has a reputation beyond reputeEricVanWyk has a reputation beyond reputeEricVanWyk has a reputation beyond reputeEricVanWyk has a reputation beyond reputeEricVanWyk has a reputation beyond repute
Send a message via AIM to EricVanWyk
Re: Power Distribution Board visibility for inspection

Quote:
Originally Posted by Wiifi View Post
The longer an inspector spends with your robot the more things they will find wrong.
This is a good thing! The inspectors' job is two fold:
1) Ensure finger count and blood volume constancy.
2) Maximize the time you spend working on the field.

I would argue that R42 should read:
The PD Board and all circuit breakers must be easily visible so that issues with your wiring can be identified and fixed quickly, during inspection or otherwise, because you really really want to spend as much time as possible playing and not fixing.

... but then the rules would reach 200 pages.

So, regardless of whether it would pass their inspection - would it pass yours?
  #4   Spotlight this post!  
Unread 28-01-2013, 12:21
vhcook's Avatar
vhcook vhcook is online now
Reader of Things
AKA: Victoria
FRC #1939 (Kuh-nig-its)
Team Role: Mentor
 
Join Date: Feb 2007
Rookie Year: 2006
Location: Kansas City, MO
Posts: 546
vhcook has a reputation beyond reputevhcook has a reputation beyond reputevhcook has a reputation beyond reputevhcook has a reputation beyond reputevhcook has a reputation beyond reputevhcook has a reputation beyond reputevhcook has a reputation beyond reputevhcook has a reputation beyond reputevhcook has a reputation beyond reputevhcook has a reputation beyond reputevhcook has a reputation beyond repute
Re: Power Distribution Board visibility for inspection

Looking at this picture, inspectors would have to suffer quite a bit to see the breaker ratings and what wire size goes into which wago. It's also going to be a giant pain to work on if it breaks. I'm assuming there's going to be more robot above this part, which is only going to make this harder to deal with.

One other thing to consider is that gearboxes innately tend to leak tiny metal shavings. With this design, gravity is not your friend.
  #5   Spotlight this post!  
Unread 28-01-2013, 12:28
darkember darkember is offline
Registered User
AKA: Billy
FRC #0375 (Robotic Plague)
Team Role: Mentor
 
Join Date: Dec 2006
Rookie Year: 2007
Location: New York
Posts: 133
darkember is a glorious beacon of lightdarkember is a glorious beacon of lightdarkember is a glorious beacon of lightdarkember is a glorious beacon of lightdarkember is a glorious beacon of light
Re: Power Distribution Board visibility for inspection

It seems that you would have a pretty hard time adding/adjusting anything in your electronics with that setup. If you guys have the space, mount the PDB directly above the motors while using some plastic on top of the 2 braces you guys have between the motors. Then send all the wires under the board using the braces to channel and hide any spare wire you guys might have. If that isnt an option then just try to make the wires neater by sending the wires under the current mounts that you have and along the interior so that the inspectors have a clearer view of your electronics. Hope this help.
__________________
  #6   Spotlight this post!  
Unread 28-01-2013, 12:36
MrForbes's Avatar
MrForbes MrForbes is online now
Registered User
AKA: Jim
FRC #1726 (N.E.R.D.S.)
Team Role: Mentor
 
Join Date: Feb 2006
Rookie Year: 2006
Location: Sierra Vista AZ
Posts: 5,951
MrForbes has a reputation beyond reputeMrForbes has a reputation beyond reputeMrForbes has a reputation beyond reputeMrForbes has a reputation beyond reputeMrForbes has a reputation beyond reputeMrForbes has a reputation beyond reputeMrForbes has a reputation beyond reputeMrForbes has a reputation beyond reputeMrForbes has a reputation beyond reputeMrForbes has a reputation beyond reputeMrForbes has a reputation beyond repute
Re: Power Distribution Board visibility for inspection

Richard, I don't know what you'll face during inspection, but I would not want to have to work on your robot with it built like that. We learned that our rookie year.....the electronics need to be easy to get to, period.
  #7   Spotlight this post!  
Unread 28-01-2013, 12:41
Jon Stratis's Avatar
Jon Stratis Jon Stratis is online now
Electrical/Programming Mentor
FRC #2177 (The Robettes)
Team Role: Mentor
 
Join Date: Feb 2007
Rookie Year: 2006
Location: Minnesota
Posts: 3,736
Jon Stratis has a reputation beyond reputeJon Stratis has a reputation beyond reputeJon Stratis has a reputation beyond reputeJon Stratis has a reputation beyond reputeJon Stratis has a reputation beyond reputeJon Stratis has a reputation beyond reputeJon Stratis has a reputation beyond reputeJon Stratis has a reputation beyond reputeJon Stratis has a reputation beyond reputeJon Stratis has a reputation beyond reputeJon Stratis has a reputation beyond repute
Re: Power Distribution Board visibility for inspection

With that setup, you'll make your inspector very unhappy, as they'll have a very difficult time seeing what they need to see.

Rather than reconfigure the board, is it possible to add a hinge on the bottom? Our electrical board is likewise at the very bottom of our robot under other stuff, but we have one side of the board hinged and the other bolted. For inspection, we tip the robot on its side, remove two bolts, and the whole thing is very, very easily visible!
__________________
2007 - Present: Mentor, 2177 The Robettes
LRI: North Star 2012-2016; Lake Superior 2013-2014; MN State Tournament 2013-2014, 2016; Galileo 2016; Iowa 2017
2015: North Star Regional Volunteer of the Year
2016: Lake Superior WFFA
  #8   Spotlight this post!  
Unread 28-01-2013, 12:43
darkember darkember is offline
Registered User
AKA: Billy
FRC #0375 (Robotic Plague)
Team Role: Mentor
 
Join Date: Dec 2006
Rookie Year: 2007
Location: New York
Posts: 133
darkember is a glorious beacon of lightdarkember is a glorious beacon of lightdarkember is a glorious beacon of lightdarkember is a glorious beacon of lightdarkember is a glorious beacon of light
Re: Power Distribution Board visibility for inspection

Quote:
Originally Posted by Jon Stratis View Post
With that setup, you'll make your inspector very unhappy, as they'll have a very difficult time seeing what they need to see.

Rather than reconfigure the board, is it possible to add a hinge on the bottom? Our electrical board is likewise at the very bottom of our robot under other stuff, but we have one side of the board hinged and the other bolted. For inspection, we tip the robot on its side, remove two bolts, and the whole thing is very, very easily visible!
That's pretty cool. Seems easier to do then what I suggested. I kinda want to see that.
__________________
  #9   Spotlight this post!  
Unread 28-01-2013, 13:12
connor.worley's Avatar
connor.worley connor.worley is offline
Registered User
FRC #0973 (Greybots)
Team Role: Mentor
 
Join Date: Mar 2011
Rookie Year: 2010
Location: Berkeley/San Diego
Posts: 601
connor.worley has a reputation beyond reputeconnor.worley has a reputation beyond reputeconnor.worley has a reputation beyond reputeconnor.worley has a reputation beyond reputeconnor.worley has a reputation beyond reputeconnor.worley has a reputation beyond reputeconnor.worley has a reputation beyond reputeconnor.worley has a reputation beyond reputeconnor.worley has a reputation beyond reputeconnor.worley has a reputation beyond reputeconnor.worley has a reputation beyond repute
Re: Power Distribution Board visibility for inspection

Last year, motors (along with a lot of other stuff) obscured most of our PD board from view. We didn't have any problems with inspection.
__________________
Team 973 (2016-???)
Team 5499 (2015-2016)
Team 254 (2014-2015)

Team 1538 (2011-2014)
2014 Driver (25W 17L 1T)
日本語でOK
  #10   Spotlight this post!  
Unread 28-01-2013, 13:36
darkember darkember is offline
Registered User
AKA: Billy
FRC #0375 (Robotic Plague)
Team Role: Mentor
 
Join Date: Dec 2006
Rookie Year: 2007
Location: New York
Posts: 133
darkember is a glorious beacon of lightdarkember is a glorious beacon of lightdarkember is a glorious beacon of lightdarkember is a glorious beacon of lightdarkember is a glorious beacon of light
Re: Power Distribution Board visibility for inspection

Quote:
Originally Posted by connor.worley View Post
Last year, motors (along with a lot of other stuff) obscured most of our PD board from view. We didn't have any problems with inspection.
Even if inspection isnt an issue they still need to be able to reach their electronics with some ease in order to make any adjustments. You always need to plan for the worst and I dont think spending a bunch of time on just reaching the electronics is great especially if they need to make quick repairs or additions during a competition.
__________________
  #11   Spotlight this post!  
Unread 28-01-2013, 15:33
rsisk's Avatar
rsisk rsisk is offline
The GURU Channel
AKA: Richard Sisk
FRC #2493 (Robokong)
Team Role: Mentor
 
Join Date: Jan 2008
Rookie Year: 2007
Location: Riverside, CA
Posts: 2,747
rsisk has a reputation beyond reputersisk has a reputation beyond reputersisk has a reputation beyond reputersisk has a reputation beyond reputersisk has a reputation beyond reputersisk has a reputation beyond reputersisk has a reputation beyond reputersisk has a reputation beyond reputersisk has a reputation beyond reputersisk has a reputation beyond reputersisk has a reputation beyond repute
Send a message via MSN to rsisk
Re: Power Distribution Board visibility for inspection

I sure like the hinged electronics board idea, makes for easy inspection and service. The wires on the voltage side of the Talons run inside the C-Channel and might make it tough to hinge in our case.

I can reach in with my hands and change breakers. The wago connectors on the non-battery side are positioned so I can fit the screwdriver in and change a wire (the battery side is more difficult, but three bolts and the battery case is off the electronics board).

Metal shavings coming out of the gear boxes is now concerning me as well.

Mounting on top of the transmissions is out because the shooter will be above the transmissions and when down will not leave any room to mount anything up there. When the shooter is up, there is plenty of room to see through the motors. Might have to see if there is a way to raise the shooter to make room for the PDB.

Sure would be nice to have a smaller PDB

Thanks for all the input so far.
__________________
Quote:
The views expressed are mine and should not be construed to represent the views of anyone else.
  #12   Spotlight this post!  
Unread 28-01-2013, 15:42
Joe Ross's Avatar Unsung FIRST Hero
Joe Ross Joe Ross is offline
Registered User
FRC #0330 (Beachbots)
Team Role: Engineer
 
Join Date: Jun 2001
Rookie Year: 1997
Location: Los Angeles, CA
Posts: 8,559
Joe Ross has a reputation beyond reputeJoe Ross has a reputation beyond reputeJoe Ross has a reputation beyond reputeJoe Ross has a reputation beyond reputeJoe Ross has a reputation beyond reputeJoe Ross has a reputation beyond reputeJoe Ross has a reputation beyond reputeJoe Ross has a reputation beyond reputeJoe Ross has a reputation beyond reputeJoe Ross has a reputation beyond reputeJoe Ross has a reputation beyond repute
Re: Power Distribution Board visibility for inspection

Prior to wiring the robot, we put together a spreadsheet showing the motor, speed controller, wire size, and breaker size. This comes in handy during inspection, because typically the inspector will look at the spreadsheet, and then spot check one or two breakers.
  #13   Spotlight this post!  
Unread 28-01-2013, 16:02
Conor Ryan Conor Ryan is offline
I'm parking robot yacht club.
FRC #4571 (Robot Yacht Club)
Team Role: Mentor
 
Join Date: Nov 2004
Rookie Year: 2004
Location: Midtown, NYC
Posts: 1,889
Conor Ryan has a reputation beyond reputeConor Ryan has a reputation beyond reputeConor Ryan has a reputation beyond reputeConor Ryan has a reputation beyond reputeConor Ryan has a reputation beyond reputeConor Ryan has a reputation beyond reputeConor Ryan has a reputation beyond reputeConor Ryan has a reputation beyond reputeConor Ryan has a reputation beyond reputeConor Ryan has a reputation beyond reputeConor Ryan has a reputation beyond repute
Re: Power Distribution Board visibility for inspection

Post a picture of the current electronics set up.

Field personnel really need to have easy crio, radio, and main breaker accessibility. Safety is also a significant issue behind this rule.

Also if you plan on hanging, and having anything in zone 3, (even if its a 1/4" of aluminum) make sure you can turn the robot off from the ground easily.
  #14   Spotlight this post!  
Unread 28-01-2013, 16:15
Grim Tuesday's Avatar
Grim Tuesday Grim Tuesday is offline
Registered User
AKA: Simon Bohn
FRC #0639 (Code Red)
Team Role: Alumni
 
Join Date: Jan 2010
Rookie Year: 2010
Location: Baltimore MD (JHU)
Posts: 1,600
Grim Tuesday has a reputation beyond reputeGrim Tuesday has a reputation beyond reputeGrim Tuesday has a reputation beyond reputeGrim Tuesday has a reputation beyond reputeGrim Tuesday has a reputation beyond reputeGrim Tuesday has a reputation beyond reputeGrim Tuesday has a reputation beyond reputeGrim Tuesday has a reputation beyond reputeGrim Tuesday has a reputation beyond reputeGrim Tuesday has a reputation beyond reputeGrim Tuesday has a reputation beyond repute
Re: Power Distribution Board visibility for inspection

Our PD board was pretty obscured last year (we put it vertically behind our collection mechanism) and Big Al gave us a talking to at Champs. It's unlikely they won't pass you because of that considering the amount of work it would take to relocate something the magnitude of the PD board but I can guarantee you the inspectors won't be happy about it. Remember, they say it must be visible for inspection, not visible for gameplay so if you choose to have it mounted on some sort of hinged mechanism it is still legal.
  #15   Spotlight this post!  
Unread 28-01-2013, 16:23
rsisk's Avatar
rsisk rsisk is offline
The GURU Channel
AKA: Richard Sisk
FRC #2493 (Robokong)
Team Role: Mentor
 
Join Date: Jan 2008
Rookie Year: 2007
Location: Riverside, CA
Posts: 2,747
rsisk has a reputation beyond reputersisk has a reputation beyond reputersisk has a reputation beyond reputersisk has a reputation beyond reputersisk has a reputation beyond reputersisk has a reputation beyond reputersisk has a reputation beyond reputersisk has a reputation beyond reputersisk has a reputation beyond reputersisk has a reputation beyond reputersisk has a reputation beyond repute
Send a message via MSN to rsisk
Re: Power Distribution Board visibility for inspection

Quote:
Originally Posted by Conor Ryan View Post
Post a picture of the current electronics set up.

Field personnel really need to have easy crio, radio, and main breaker accessibility. Safety is also a significant issue behind this rule.

Also if you plan on hanging, and having anything in zone 3, (even if its a 1/4" of aluminum) make sure you can turn the robot off from the ground easily.
Main breaker, cRIO, and radio are easily accessible. Will get a pic after work
__________________
Quote:
The views expressed are mine and should not be construed to represent the views of anyone else.
Closed Thread


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -5. The time now is 11:35.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi