Go to Post Here is more data, Because we all love data. - Bochek [more]
Home
Go Back   Chief Delphi > FIRST > General Forum
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
 
 
Thread Tools Rate Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Spotlight this post!  
Unread 13-09-2013, 14:33
Jon Stratis's Avatar
Jon Stratis Jon Stratis is offline
Electrical/Programming Mentor
FRC #2177 (The Robettes)
Team Role: Mentor
 
Join Date: Feb 2007
Rookie Year: 2006
Location: Minnesota
Posts: 3,753
Jon Stratis has a reputation beyond reputeJon Stratis has a reputation beyond reputeJon Stratis has a reputation beyond reputeJon Stratis has a reputation beyond reputeJon Stratis has a reputation beyond reputeJon Stratis has a reputation beyond reputeJon Stratis has a reputation beyond reputeJon Stratis has a reputation beyond reputeJon Stratis has a reputation beyond reputeJon Stratis has a reputation beyond reputeJon Stratis has a reputation beyond repute
FRC Blogged - 2015 Control System Alpha Testing

http://www.usfirst.org/roboticsprogr...-alpha-testing
Quote:
Blog Date:
Friday, September 13, 2013 - 12:56

Kate Pilotte, the FRC Kit of Parts Manager, is leading the development of the 2015 Control System. She has this update on Alpha Testing:

Hopefully by now you’re aware of the transition to a new control system for the 2015 season. There’s much preparation that goes in to releasing a new system, and we want to make it as safe, robust, simple, cost effective, and powerful as possible. One of the ways we’ll do this is through early “Alpha Testing,” and I’d like to use this post to help you understand more about what that means…

The goals of the Alpha Test phase are as follows:

- Give a select group of diverse teams early hands-on exposure to the 2015 control system;

- Use Alpha Team feedback to refine/develop supporting documentation and training materials;

- Test the features and functions of the new control system to uncover problems and provide solution suggestions;

- Develop a supporting network/knowledge database to ease the transition to the new system;

- Allow teams to become “Control System Experts” and serve as area leaders to mentor other teams;

- Share information to minimize strategic advantages; and

- Understand the difficulties and issues that Teams may encounter with the new control system.

The general Alpha Test timeline is below.

- September, 2013

o Hardware & software distribution to Alpha Teams

o Posting of detailed test plan documents/instructions

- October, 2013

o Alpha teams test hardware/software locally

o Test plan documents updated/revised as needed

o Feedback to FIRST per more detailed schedule to be determined

o Alpha team community outreach activities re: features/use of the 2015 control system (online, at events, etc).

- November , 2013

o Test plan documents updated/revised as needed

o Feedback to FIRST per more detailed schedule to be determined

o Event-like testing in NH

o Alpha team community outreach activities re: features/use of the 2015 control system (online, at events, etc).

- December , 2013

o All feedback from Alpha Testing due to FIRST

- January – April, 2014

o Alpha team community outreach activities re: features/use of the 2015 control system (online, at events, etc).



We’d like to publically acknowledge and thank the nine teams that will be helping us run the system through its paces this fall…

Language Team # Team Name City State Country

C++ 16 Bomb Squad Mountain Home AR USA

C++ 294 Beach Cities Robotics Redondo Beach CA USA

C++ 987 HIGHROLLERS Las Vegas NV USA

Java 610 The Coyotes Toronto ON Canada

Java 2168 Aluminum Falcons Groton CT USA

Java 2177 The Robettes Mendota Heights MN USA

LabVIEW 836 RoboBees Leonardtown MD USA

LabVIEW 1208 Metool Brigade O’Fallon IL USA

LabVIEW 1718 The Fighting Pi Armada MI USA



These teams will be crucial in helping us make the system ready for the 2015 season, and we’re so grateful for their help.



Here’s what we told the Alpha Teams we expect of them…

A) Act as ambassadors for FIRST and the 2015 Control System

B) Direct all concerns and issues regarding the new control system to FIRST first. (communication to/with the public should be constructive).

C) Transplant the 2015 Control System hardware into an existing Ultimate Ascent FRC competition robot to perform basic functionality testing in two venues: at home and in an event-like atmosphere (assume Ultimate Ascent);

D) Designate one lead student and one technical Mentor to serve as the communicators of test results;

E) Post findings on a bi-weekly basis (including but not limited to bugs, incompatibilities, documentation edits, best-practices, etc.);

F) Agree to serve as “Control Systems Experts” and provide support to teams in their surrounding areas for the 2015 season;

a. Be available to answer questions from local Teams and from the broader FRC community;

b. Release every piece of Team-developed code;

c. Open facility to local teams to observe or assist in the test program;

d. Retain the test hardware through the 2014 FRC season to show/demo at competitions and workshops.

e. Hold at least one Saturday controls training seminar open to all neighboring teams prior to the 2015 Kickoff (this schedule is to be posted publically);

G) Commit to sending 1-2 technical designees (preferably the same people from part D) and their robot to NH for event-like testing in November

H) Agree to return 2015 Control System components to  FIRST within 14 days upon request;

I) Sign and adhere to the requirements defined in the Alpha Team Disclosure Agreement;

J) Not to sign up for 2014 Beta Testing;

K) Exhibit the highest degree of Gracious Professionalism in their communications both public and private; and

L) Flexibility

It goes two ways – here’s what we told them they can expect from FIRST:

A) The hardware and software suite shipped in September;

B) Disclosure about the system and the evolution of the system;

C) Timely responses in forums and email (w/in 24 hours);

D) Preliminary, but clear, concise documentation;

E) Coverage of travel and shipping expenses for the November event-like testing in NH;

F) Exhibition of the highest degree of Gracious Professionalism in communications, both public and private; and

G) Flexibility.



This means that you can expect them to be open, honest, and constructive about their experiences with the new system and also that they’re resources to the community for more information.



They’re up for a very busy fall!
I've been itching to say something about Alpha testing ever since my team found out... thanks for the blog post, Kate!
__________________
2007 - Present: Mentor, 2177 The Robettes
LRI: North Star 2012-2016; Lake Superior 2013-2014; MN State Tournament 2013-2014, 2016; Galileo 2016; Iowa 2017
2015: North Star Regional Volunteer of the Year
2016: Lake Superior WFFA

Last edited by Jon Stratis : 13-09-2013 at 14:38.
Reply With Quote
 


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -5. The time now is 04:59.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi