|
Rev. 2 Blueprint corrections
Posted by Paul at 1/9/2001 4:10 PM EST
Engineer on team #365, Miracle of Engineering, from Avon Grove HS and DuPont.
I just recieved some answers from FIRST correcting some mistakes on the playing field blueprints.
1. Center Barrier, P16, upright supports, should be 1-1/4" Schedule 40 Aluminum, quantity should be 6 and length should be 16".
2. Bridge counter wieght support pipe assembly. The 1" pipe is inserted flush in the 1-1/4" pipe and the 3/4" pipe is inserted about 3" in the 1" pipe. Note: use 6, 3# weights on each support.
3. The quantity for PVC1, goal, horizontal supports should be 16.
__________________
This message was archived from an earlier forum system. Some information may have been left out. Start new discussion in the current forums, and refer back to these threads when necessary.
|