| Thread Tools | Rate Thread | Display Modes |
|
#1
|
|||
|
|||
|
Team Drawing Field BOM?
Has anyone found a BOM for the parts/wood needed to build the field? If not how much woods if you purchase to build the field?
|
|
#2
|
||||
|
||||
|
Re: Team Drawing Field BOM?
You can find the official team version drawings of the field elements in the file titled "2016TeamVersions" in this zipped folder: https://firstfrc.blob.core.windows.n...wings-2016.zip
I went through that document last night to make a listing of how much of material each field element would require, and how many of each field elements you would need to have a full field*: *It was a late night, so please feel free to make any corrections Quote:
Last edited by Hallry : 12-01-2016 at 14:27. |
|
#3
|
||||
|
||||
|
Thanks for putting this list together!
|
|
#4
|
||||
|
||||
|
Re: Team Drawing Field BOM?
Has anyone found the specifications for the Drawbridge "Spring and Threaded Connector"?
|
|
#5
|
|||
|
|||
|
Re: Team Drawing Field BOM?
I'm pretty sure your quantities of pipe clamps, bolts and nuts for Cheval de Frise are wrong.
There are 4 teetering platforms, each of which needs 2 pipe clamps and each pipe clamp needs 2 bolts and nuts. Therefore under miscellaneous for CdF I think it should be: (8 x) pipe clamp, cheval de fries (16 x) flat head screw, 3/8-16 x 1.25” (16 x) nut, nylock 3/8-16 Thanks for putting this list together. |
|
#6
|
||||
|
||||
|
Re: Team Drawing Field BOM?
Quote:
|
|
#7
|
|||
|
|||
|
Re: Team Drawing Field BOM?
Quote:
HW-00099 : Extension Screen Door Spring, 15"-18 1/2" HW-00100 : Screen Door Spring, 16-3/8" Long For each : 2 Oval Threaded Connectors, 3/16" Diam Last edited by JV_Mentor_1306 : 14-01-2016 at 09:45. Reason: additional info |
|
#8
|
|||
|
|||
|
Re: Team Drawing Field BOM?
Thank you so much for putting this together - I started looking through the field components and almost immediately got a (figurative) headache. You're wonderful!
|
|
#9
|
|||
|
|||
|
Re: Team Drawing Field BOM?
We are building the Chin-up bar with two ramp corners (1&&2). Then Put a low goal door in it. Then a opening at the top to simulate the High Goal. Kills the whole tower in one device.
Then a Outer reach receptacle to insert the obstacles we are choosing to focus on. |
|
#10
|
|||
|
|||
|
Re: Team Drawing Field BOM?
Here is a link to assist with BOM - our team already has field side walls and the driver stations built from previous years so they are not included. Also, this plans for only one of the 8 defense elements for the field. You may want to build two of each. Estimated sheet totals of plywood and 2X4s are in green cells. We also use OSB for some vertical walls on some elements.
https://drive.google.com/open?id=0B6...HpPRDI3U21XeUk |
|
#11
|
||||
|
||||
|
Re: Team Drawing Field BOM?
Has anyone else noticed the difference in the angle of the defense ramp. C.A.D. Files say 14.5 manual says 13.5
|
|
#12
|
|||
|
|||
|
Re: Team Drawing Field BOM?
Quote:
We're really interested in our angle of attack for the low bar, so quick clarification would be appreciated. |
|
#13
|
|||
|
|||
|
Re: Team Drawing Field BOM?
[quote=JV_Mentor_1306;1523434]From competition drawings :
HW-00099 : Extension Screen Door Spring, 15"-18 1/2" HW-00100 : Screen Door Spring, 16-3/8" Long Can anyone explain the need for two different springs on the drawbridge? |
|
#14
|
|||
|
|||
|
Re: Team Drawing Field BOM?
On the sally port, the plan says 3 25" 2 by 4s, put I only see two used in the construction.
Also the 4 ft 2 by 4 18 degree angle cut can be tricky. Really needs a table saw and someone who knows how to do it safely. |
|
#15
|
||||
|
||||
|
Re: Team Drawing Field BOM?
Quote:
However, we also found that the door is so heavy on the short little wall, it is pulling it over. Will reinforce with brackets and possibly lighter weight door. |
![]() |
| Thread Tools | |
| Display Modes | Rate This Thread |
|
|