|
|
|
![]() |
|
|||||||
|
||||||||
| View Poll Results: What should be done with the drive train? | |||
| Keep it |
|
7 | 23.33% |
| Change it |
|
23 | 76.67% |
| Voters: 30. You may not vote on this poll | |||
|
|
Thread Tools | Rate Thread | Display Modes |
|
#1
|
|||
|
|||
|
⁶ CIM drive-train brown out
I have been talking about brownout problems with our drive train design, but no one seems to listen. I have attached the picture of what we were planning. #1 It is a 6 CIM drive train. #2 The CIMs are spaced out (longer wiring) #3 We will sometimes be running 2 mini CIMs or a bag motor along with it.
|
| Thread Tools | |
| Display Modes | Rate This Thread |
|
|