Go to Post TL, DR: You may be skilled at karate on your own, but imagine how much better you'll be with Mr. Miyagi mentoring you. - artdutra04 [more]
Home
Go Back   Chief Delphi > Technical > Motors
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
Closed Thread
 
Thread Tools Rate Thread Display Modes
  #1   Spotlight this post!  
Unread 16-01-2005, 22:05
colt527 colt527 is offline
Registered User
AKA: Ken Colton
FRC #0527
Team Role: Mentor
 
Join Date: Feb 2004
Rookie Year: 2002
Location: Long Island
Posts: 123
colt527 is a splendid one to beholdcolt527 is a splendid one to beholdcolt527 is a splendid one to beholdcolt527 is a splendid one to beholdcolt527 is a splendid one to beholdcolt527 is a splendid one to beholdcolt527 is a splendid one to behold
Send a message via AIM to colt527
Blowing the 120A breaker?

OK, well here is the deal. We are planning to use 4 CIM's to drive the robot using the gearbox that FIRST supplied us, and 1 motor, probably a window motor to raise a pulley system. To move our main arm, we have 2 designs:

1.) Use a series of pistons that has the ability to raise the arm to various different levels.
2.) Use motors (Probably 2 Taigene motors) to raise the main arm.

We have ran into some road blocks with the pneumatic approach, and I personally would like to go with the motors to raise the arm. But, here is my biggest concern. Let's say we are just plain moving around, lifting the main arm, and using the pulley system, will the main 120A breaker pop? Has any team successfully used 7 motors running at the same time to operate their robots? If so, did you ever experience this problem, or any other problems for that matter.

PS: Do the Taigene motors back drive if you apply 100 ft-lbs of torque to them? I have to test that out one of these days.

Thanks for your time =)
__________________
Mentor, Team 527 -- Plainedge Red Dragons
FIRST Volunteer
SUNY Stony Brook Computer Science 2010
kcolton@gmail.com
  #2   Spotlight this post!  
Unread 16-01-2005, 22:10
Cory's Avatar
Cory Cory is offline
Registered User
AKA: Cory McBride
FRC #0254 (The Cheesy Poofs)
Team Role: Engineer
 
Join Date: May 2002
Rookie Year: 2001
Location: Redwood City, CA
Posts: 6,807
Cory has a reputation beyond reputeCory has a reputation beyond reputeCory has a reputation beyond reputeCory has a reputation beyond reputeCory has a reputation beyond reputeCory has a reputation beyond reputeCory has a reputation beyond reputeCory has a reputation beyond reputeCory has a reputation beyond reputeCory has a reputation beyond reputeCory has a reputation beyond repute
Send a message via AIM to Cory
Re: Blowing the 120A breaker?

First off, you should not have trouble with breakers blowing. Your drivetrain should have the wheels slipping before you reach the stall current, so you'll never be pulling that much. Many teams have used 6 motor drives successfully in the past, and that's with all 6 running the entire match. If you have a total of 7 and are only driving 4 the majority of the time, you should be fine.

Second, the van door motor can be backdriven if you apply enough force to it, if I remember correctly.
__________________
2001-2004: Team 100
2006-Present: Team 254
  #3   Spotlight this post!  
Unread 16-01-2005, 22:43
sanddrag sanddrag is offline
On to my 16th year in FRC
FRC #0696 (Circuit Breakers)
Team Role: Teacher
 
Join Date: Jul 2002
Rookie Year: 2002
Location: Glendale, CA
Posts: 8,510
sanddrag has a reputation beyond reputesanddrag has a reputation beyond reputesanddrag has a reputation beyond reputesanddrag has a reputation beyond reputesanddrag has a reputation beyond reputesanddrag has a reputation beyond reputesanddrag has a reputation beyond reputesanddrag has a reputation beyond reputesanddrag has a reputation beyond reputesanddrag has a reputation beyond reputesanddrag has a reputation beyond repute
Re: Blowing the 120A breaker?

Also, there is only one Taigene Van Door Motor in the kit. You may not use two. As far as backdriving, I would say yes. Do this, take your motor (not hooked up to anything) and put an adjustable crescent wrench on the flat spots and crank it. It is not too hard to backdrive. You can reduce the effect by setting the jumper on the speed control to "brake" but this will only reduce it a little. To try that by hand, do the same thing as above but touch the two wires from the motor together while cranking. It should be a little harder.

The concern of tripping the 120A breaker does not directly relate to the number of motors but how much current those motors are drawing. You could probably run 30 motors at the same time on that breaker if they didn't have any load.

Theoretically it would be easily possible to do under an intense pushing match but in reality that breaker can sustain much more current for a substantial amount of time. The only time we've tripped ours was in 2003 when we were practicing for a long time and driving with lots of binding in the drive system and the "suckers" were deployed and dragging on the carpet for a long time. But beyond that I've never heard of anyone trip it.
__________________
Teacher/Engineer/Machinist - Team 696 Circuit Breakers, 2011 - Present
Mentor/Engineer/Machinist, Team 968 RAWC, 2007-2010
Technical Mentor, Team 696 Circuit Breakers, 2005-2007
Student Mechanical Leader and Driver, Team 696 Circuit Breakers, 2002-2004

Last edited by sanddrag : 16-01-2005 at 22:53.
  #4   Spotlight this post!  
Unread 16-01-2005, 22:49
Ali Ahmed's Avatar
Ali Ahmed Ali Ahmed is offline
Registered User
FRC #0004 (Team 4 ELEMENT)
Team Role: Mentor
 
Join Date: Mar 2004
Rookie Year: 2002
Location: Los Angeles, CA
Posts: 371
Ali Ahmed is a splendid one to beholdAli Ahmed is a splendid one to beholdAli Ahmed is a splendid one to beholdAli Ahmed is a splendid one to beholdAli Ahmed is a splendid one to beholdAli Ahmed is a splendid one to beholdAli Ahmed is a splendid one to behold
Re: Blowing the 120A breaker?

There should not be a problem with using 7 motors at the same time. Last year we had 6 motors and the compressor running at the same and we didn't trip the 120 breaker.
__________________

Student: Team 22
Mentor: Team 4


  #5   Spotlight this post!  
Unread 16-01-2005, 23:36
sciguy125 sciguy125 is offline
Electrical Engineer
AKA: Phil Baltar
FRC #1351
Team Role: College Student
 
Join Date: Jan 2005
Rookie Year: 2004
Location: Sunnyvale, CA
Posts: 519
sciguy125 has a reputation beyond reputesciguy125 has a reputation beyond reputesciguy125 has a reputation beyond reputesciguy125 has a reputation beyond reputesciguy125 has a reputation beyond reputesciguy125 has a reputation beyond reputesciguy125 has a reputation beyond reputesciguy125 has a reputation beyond reputesciguy125 has a reputation beyond reputesciguy125 has a reputation beyond reputesciguy125 has a reputation beyond repute
Send a message via AIM to sciguy125 Send a message via MSN to sciguy125 Send a message via Yahoo to sciguy125
Re: Blowing the 120A breaker?

If you look at the specs, you'll see that you can draw a lot of current without blowing it for awhile. 120A takes 500s and 240A (200% of rating) takes 10s. You'll probably be fine unless something really bad is happening.

Last year, however, we had serious problems with our drill motors in the drive train constantly blowing the 40A breakers....
__________________

-----BEGIN GEEK CODE BLOCK-----
Version: 3.12
GE/S/P a-- e y-- r-- s:++ d+ h! X+++
t++ C+ P+ L++ E W++ w M-- V? PS+ PE+
5- R-- tv+ b+ DI+++ D- G
------END GEEK CODE BLOCK------
  #6   Spotlight this post!  
Unread 17-01-2005, 07:44
Unsung FIRST Hero
Al Skierkiewicz Al Skierkiewicz is offline
Broadcast Eng/Chief Robot Inspector
AKA: Big Al WFFA 2005
FRC #0111 (WildStang)
Team Role: Engineer
 
Join Date: Jun 2001
Rookie Year: 1996
Location: Wheeling, IL
Posts: 10,770
Al Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond repute
Re: Blowing the 120A breaker?

Quote:
Originally Posted by colt527
OK, well here is the deal. We are planning to use 4 CIM's to drive the robot using the gearbox that FIRST supplied us, and 1 motor, probably a window motor to raise a pulley system.

Ken,
The First supplied gearbox has been designed for efficient driving using two Chalupas for each box. The 120 amp circuit breaker should not trip in a two minute match with those motors and a normal array of other motors. It is unlikely that you will be running all the motors at the sme time, and a two minute match should keep you under the trip charachteristics of the breaker.
__________________
Good Luck All. Learn something new, everyday!
Al
WB9UVJ
www.wildstang.org
________________________
Storming the Tower since 1996.
Closed Thread


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
breaker rules Joe Ross Electrical 4 14-01-2005 22:50
Keyang Motor Thermal breaker. archiver 2000 1 24-06-2002 00:24
circuit breaker archiver 2001 2 23-06-2002 23:18
60 amp breaker Anne Lam Technical Discussion 10 10-01-2002 15:13
Chain and chain breaker source? kmcclary Off-Season Events 4 22-10-2001 22:51


All times are GMT -5. The time now is 05:53.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi