|
|
|
![]() |
|
|||||||
|
||||||||
|
|
Thread Tools | Rate Thread | Display Modes |
|
#1
|
|||
|
|||
|
Need Your Input - Is my OI panel still legal?
Outside of the "fix-it window" I drilled some holes in my OI panel. I do not plan to use these holes during competition, and plan to restore the state of my OI to it's original configuration, except for the holes, before I arrive at Nationals.
What is the majority opinion of this forum? Is it: 1) To be legal, I now have to build a new OI panel when I arrive at Nationals OR 2) It is OK to use the existing OI panel as long as I do not use the illegal holes I drilled. This is my first post ever, thanks for your input. |
| Thread Tools | |
| Display Modes | Rate This Thread |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Auton digital input | ten3brousone | Programming | 7 | 20-03-2005 22:23 |
| Arm Design Input -- Four Bar Linkages | Sachiel7 | Technical Discussion | 4 | 18-01-2005 01:29 |
| Breaker Panel | Gal Longin | Electrical | 1 | 13-01-2005 16:01 |
| Programming port input? | Rickertsen2 | Rumor Mill | 1 | 21-01-2003 17:26 |
| Pulling robot off ramp legal? | archiver | 2000 | 2 | 24-06-2002 00:14 |