Re: Build Timeline
We do it just like that, except the "fix" thing happens on Thursday of the competition. Now that I think about it, the "test" thing happens then too.
|
|
#2
|
|||||
|
|||||
|
Re: Build Timeline
Quote:
|
|
#3
|
||||
|
||||
|
Re: Build Timeline
Yes, 766's schedule is quite similar; now add in long design sessions (four hours doesn't sound like a lot, but ideas aren't like cans and bottles- there's a limit to recycling dumped ideas), a half CADed robot on Solidworks and the occasional magical smoke, along with a potentiometer mounted backwards blamed on the programmers until someone actually looks at the hardware. Discovered at about 10pm the night before Ship Date. Of all the laws of physics and/or reality, Murphy's seems to be the most often followed. And then, as sleep deprivation rockets higher, common sense begins to be even more commonly needed than possessed than usual...
And here's something I wrote a while ago:Fourth Week Fantasy From red to green the electronics' lights blink Six rugged wheels and their chains smoothly clink Victor fans whir to life Perfect auton ends all strife What an unattainable dream, we all think. Unfortunately, this has never happened in the last two years that I've been here, not even at regionals. Oh well, that's what daydreams are for. |
|
#4
|
||||
|
||||
|
Re: Build Timeline
1583 Timeline. Build season 6 weeks
We must stay on schedule Week 1 Brainstorming Days 1-4 Design Freeze Day 5 Established robot design Mobility system frozen General ideas for all mechanisms Mechanism Prototyping Days 5-8 Build Drive System Days 5-14 Week 2 Mechanism Build Days 8-21 Programmers Begin Coding Day 8 Robot Controls Days 8-14 Drive System Complete Day 14 . Having the robot moving early is crucial!! Week 3 Begin Autonomous Testing Day 15 Week 4 Mechanism Integration Days 22-28 Wiring is not a quick job. Weeks 5&6 Robot Done Day 29 Testing & Perfecting Days 29-40 Driver Training Days 29-40 . Practiced drivers make bad robots win, and unpracticed drivers make good robots lose The Last Few Days Decorations Parts Inventory Photographs Packing The Crate |
|
#5
|
|||||
|
|||||
|
Re: Build Timeline
We're going for something of an accelerated schedule this year.
Kick Off Weekend: Strategy selected, drive train finished End of Week 1: Design finished End of Week 4: Finished Robot End of Week 6: Long, well-deserved rest. We'll see how it goes. |
|
#6
|
||||
|
||||
|
Re: Build Timeline
Quote:
Quote:
|
|
#7
|
||||
|
||||
|
Re: Build Timeline
Week one brainstorm & create design
Week two finish design & get matterials Week three build Week four build/test/redesign (if needed) Week five build/test/redesign (if needed) Week six build/program & ship |
![]() |
| Thread Tools | |
| Display Modes | Rate This Thread |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| vex timeline? | Morenoh149 | FIRST Tech Challenge | 2 | 17-10-2005 17:50 |
| Timeline, The Book | LBK Rules | Chit-Chat | 6 | 07-12-2003 09:31 |
| timeline | archiver | 2000 | 1 | 23-06-2002 22:08 |
| Regional Timeline | archiver | 2000 | 2 | 23-06-2002 22:08 |
| Timeline? | Pengiun Joe | Chairman's Award | 2 | 27-01-2002 16:35 |