|
|
|
![]() |
|
|||||||
|
||||||||
![]() |
| Thread Tools | Rate Thread | Display Modes |
|
#1
|
||||
|
||||
|
2009 controls system pre-ship
I understand that First plans to ship the new control systems (to teams that requested it) by early December. My question is, what will they ship? I assume the CRIO at the minimum, but what about the driver's station? Will they ship an Ethernet camera? How about all the required peripheral stuff, like the power distribution block, sidecars, wireless access point etc? Does anybody know?
Last edited by martin417 : 21-10-2008 at 12:09. |
|
#2
|
||||
|
||||
|
Re: 2009 controls system pre-ship
I would guess what the beta teams got (CRio, PD, digital sidecar(2), camera, router, whatever they are calling the new driver station radio, driver station) but probably not the joysticks
|
|
#3
|
|||||
|
|||||
|
Re: 2009 controls system pre-ship
Quote:
Here is a link to the actual contents... http://www.usfirst.org/uploadedFiles...20(110408).pdf And for those teams in the DC/Baltimore/Morgantown/Pittsburgh area, Team 1629 (GaCo) will be holding a Controller Clinic on Sunday Dec 14th to make sure you get your systems built as painlessly as possible. The goal of the GaCo clinic will be to get all those "Early Ship" teams up and running with their control systems just like the Beta Teams did. So although there will be some quick "presentations", the real focus will be on each team assembling and programming their OWN controller at the clinic. And since GaCo is kinda out in the "sticks", we thought teams might like to come out to Deep Creek Lake on Saturday, spend the day on the Ski Slopes at Wisp Mountain Resort, stay overnight at an area hotel and then get stuck into building on Sunday. End the day by crusing home with your working control system. Sine it's already snowing here, there should be plenty of snow at the tubing park, boarding half-pipe and various slopes. We even have a high-speed mountain coaster. Here's is a link to more info. and a registration page. http://www.gearsinc.org/node/247 Here's a google map link of where we are located. http://maps.google.com/maps?f=q&hl=e...z=8&iwloc=addr Here is some area tourism info: http://www.visitdeepcreek.com/category.php?category=223 http://www.wispresort.com/ Hope you can come and join the build-a-thon. Phil Malone Mentor: FRC, FTC, FLL |
|
#4
|
||||||
|
||||||
|
Re: 2009 controls system pre-ship
Quote:
http://frcdirector.blogspot.com |
|
#5
|
||||
|
||||
|
Re: 2009 controls system pre-ship
Aye, I can confirm that I am watching this Fedex tracking # like a hawk! ETA is ... tomorrow?!
![]() |
|
#6
|
|||||
|
|||||
|
Re: 2009 controls system pre-ship
Are there other teams out there still waiting for their control systems? Our team registered right away, paid the fee with a credit card and indicated we wanted our control system with the pre-ship. I have not heard anything from FIRST about our order and wonder what the delay is.
Anyone else out there in the same situation? Getting anxious, antsy and nervous! |
|
#7
|
||||
|
||||
|
Re: 2009 controls system pre-ship
I would suggest that you call or email team support at FIRST to verify you have not left out a step or fallen through the cracks. I beleive that once it ships notice will be sent to the team's shipping contact that includes a FedEx tracking number.
APS |
|
#8
|
||||
|
||||
|
Re: 2009 controls system pre-ship
I don't believe we have recieved an email either. We'll probably wait a few more days before calling in.
-Vivek |
|
#9
|
|||||
|
|||||
|
Re: 2009 controls system pre-ship
Don't wait! If there's a problem, you want to deal with it immediately. After December 5, there will be no more early shipments, and you'll have to wait to get your Kit of Parts next year.
|
|
#10
|
||||
|
||||
|
Re: 2009 controls system pre-ship
So, should we wait until the 5th before calling?
Are the tracking numbers sent when the package is shipped or before? thanks, Vivek p.s. who get's the tracking number? |
|
#11
|
|||
|
|||
|
Re: 2009 controls system pre-ship
Our control system has also not shipped. I just shot off an email to them making sure everything was in order. You shipping contact should receive the email.
|
|
#12
|
||||
|
||||
|
Re: 2009 controls system pre-ship
Quote:
Quote:
|
|
#13
|
||||
|
||||
|
Re: 2009 controls system pre-ship
That is correct. That is the last day FIRST is shipping them out early. After that date, you will have to wait until Kickoff to receive your control system.
|
|
#14
|
||||||
|
||||||
|
Re: 2009 controls system pre-ship
Quote:
|
|
#15
|
||||
|
||||
|
Re: 2009 controls system pre-ship
I just talked to FIRST and December 5th is the last day to sign-up for early shipping, not the last day they will be shipping kits.
If you haven't received your kit yet, you should verify that you are paid and signed up for early controls shipment before Dec. 5th. Then just wait for your not so early "Christmas". ![]() |
![]() |
| Thread Tools | |
| Display Modes | Rate This Thread |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Pre-Ship Scrimmage | neoshaakti | Fundraising | 10 | 26-06-2008 12:53 |
| batteries,controls, why ship | johnr | General Forum | 17 | 07-02-2007 20:59 |
| Our pre ship | Timmyd | Off-Season Events | 6 | 21-02-2005 14:22 |
| Pre-Ship Competition in southern WI | joe_balint | Off-Season Events | 2 | 07-02-2002 20:42 |
| Pre-Ship party in Indiana | Wayne Doenges | General Forum | 0 | 21-01-2002 16:08 |