|
|
|
![]() |
|
|||||||
|
||||||||
![]() |
|
|
Thread Tools |
Rating:
|
Display Modes |
|
|
|
#1
|
|||||
|
|||||
|
**FIRST EMAIL**/ALA Sponsorship, Forums Open and Control System Update
Greetings Teams:
Be FIRST with ALA! The Association for Laboratory Automation (ALA) is a nonprofit scientific society whose mission is to advance science and education related to laboratory automation. And that is why ALA is a proud sponsor of FIRST! ALA and FIRST have partnered for the second year to celebrate FIRST at ALA’s annual conference and exhibition LabAutomation2009, January 24-28, Palm Springs, CA, USA. LabAutomation2009 is a five-day event comprising a diverse group of over 5,000 scientists, academicians, and business leaders from more than 45 countries. Visit www.labautomation.org/LA09 for details: * Premier FIRST team; Team Spyder from Poway, CA will be featured in the Exhibit Hall alongside 250 multi-national companies featuring the latest in laboratory robotics and technology. Come see these outstanding young scientists as they display and operate their winning robots in the ALA Member Center. * John Abele, Founder and Chairman - Retired, Boston Scientific & FIRST Chairman of the Board, joins LabAutomation2009’s elite series of Plenary Speakers. Join FIRST at LabAutomation2009 this January in Palm Springs, CA, USA. For complete details on the LabAutomation conference and exhibition, visit www.labautomation.org/LA09. FIRST Forums Now Open The FIRST Forums are now open again with enhanced security features. If you have not posted to the FIRST Forums since March 1, 2008 you will need to re-register as a new user. When registering in the forums, you will encounter a security question. This security question is "What is the Core Value of FIRST? (GP)". Spoiler for GP:
Once you have completed the information, an e-mail verification notice will be sent to the email address entered. You must follow the link in this email to activate your forum account. Early Release of Control System – Shipping Update In order for teams to receive their control system early they must: * indicate they would like to receive the control system early in TIMS; * pay for their initial event and; * provide FIRST with a valid FedEx or UPS shipping account number in TIMS. Shipping is anticipated to start the last week of November, based upon availability. The control systems will be shipped via "Ground" service. Most teams will receive their shipments in 5 days or less and shipping costs will likely be $60 or under. You can calculate exact costs and times via online estimators from FedEx and UPS. The shipment will be leaving from Merrimack, NH (03054). It weighs approximately 60 lbs and is packaged in a box approximately 24" L x 16" W x 12" D. Additional details on the early release can be found here: http://www.usfirst.org/community/frc/content.aspx?id=10856 Go Teams! Last edited by Mark McLeod : 27-10-2008 at 22:42. |
|
#2
|
||||
|
||||
|
Re: **FIRST EMAIL**/ALA Sponsorship, Forums Open and Control System Update
"The shipment will be leaving from Merrimack, NH (03054). It weighs approximately 60 lbs and is packaged in a box approximately 24" L x 16" W x 12" D."
Does anyone know what will be included in the shipment, the 60 lbs seems awfully heavy. I could come up with my own conclusions that would justify this, however I would much rather know the true facts if someone else could verify it instead of speculating. Thanks |
|
#3
|
|||||
|
|||||
|
Re: **FIRST EMAIL**/ALA Sponsorship, Forums Open and Control System Update
Quote:
|
|
#4
|
||||
|
||||
|
Re: **FIRST EMAIL**/ALA Sponsorship, Forums Open and Control System Update
1 FIRST specific cRIO
2 analog modules 2 analog bumpers 2 digital I/O modules 2 pneumatic bumpers 1 digital output sourcing module 1 power distribution board 1 driver station 1 wireless adapter set 1 camera 2 joysticks assorted cables and connectors a DVD of software that will be shipped by NI Here is the list, I knew about this I just didn't think it would wiegh 60 lbs. Unless they ship the batteries with it so that rookie teams could power the system. |
|
#5
|
|||||
|
|||||
|
Re: **FIRST EMAIL**/ALA Sponsorship, Forums Open and Control System Update
Quote:
Even throwing 2 batteries in with a generous estimate of 15 lbs each should end up with 45 lbs. What the heck is in this box? Could the box + packing materials possibly add to 15 lbs? The weights for the cRIO, modules, and Distribution panel came from a seminar given by 1816, one of the beta test teams. Weights for the camera and wireless hardware came from data sheets. I gave the driver station .75 lbs, USB joysticks .4 lbs apiece and was still under 10 lbs before "assorted cables and connectors" and a DVD. |
|
#6
|
||||
|
||||
|
Re: **FIRST EMAIL**/ALA Sponsorship, Forums Open and Control System Update
1 FIRST specific cRIO 4
2 analog modules 2 2 analog bumpers 2 2 digital I/O modules 2 2 pneumatic bumpers 2 1 digital output sourcing module 1 1 power distribution board 2 1 driver station 1 1 wireless adapter set 1 1 camera 2 2 joysticks 2 assorted cables and connectors 1 a DVD of software that will be shipped by NI 0.5 batteries 30 Crate 4 Total 56.5 Packaging added to each device are why numbers are high, but this is what I got I guess it is fairly close. |
|
#7
|
|||||
|
|||||
|
Re: **FIRST EMAIL**/ALA Sponsorship, Forums Open and Control System Update
They must have ran out of static proof bags, so everything was shipped in lead foil...
![]() |
|
#8
|
|||
|
|||
|
Re: **FIRST EMAIL**/ALA Sponsorship, Forums Open and Control System Update
I don't see "digital sidecars" on anyone's list?
With 2 digital modules you'd think we should get 2 digital sidecars to boot. |
|
#9
|
||||
|
||||
|
Re: **FIRST EMAIL**/ALA Sponsorship, Forums Open and Control System Update
That would be the digital input / output.
Also, the "bumpers" are now "breakouts" if I remember correctly. |
|
#10
|
||||
|
||||
|
Re: **FIRST EMAIL**/ALA Sponsorship, Forums Open and Control System Update
Quote:
2 analog modules (including bumpers) 0.8 2 analog bumpers 0 2 digital I/O modules 0.6 2 pneumatic bumpers 0.8 1 digital output sourcing module 0.25 1 power distribution board 1.6 1 driver station 0.3 1 wireless adapter set 0.5 1 camera 0.39 2 joysticks 2 assorted cables and connectors 0.5 a DVD of software that will be shipped by NI 0.3 batteries (2) 27.64 Total 37.68 This was the conclusion I came to when I added it up I then added extra since these were approxiamate and to just try and justify a 60 lb shipping wieght. Obviously something substantial is missing from the list. All I am asking is does anyone actually know. It is pretty clear the answer is only the people sending it. |
|
#11
|
|||||
|
|||||
|
Included in Early Control System Shipment
Bill's posted what Kate plans to include in the early control system shipment.
http://www.usfirst.org/uploadedFiles/DRAFT%20CONTROLS%20KIT%20-%202009%20KoP%20Checklist%20%28110408%29.pdf The screwdriver is a nice touch. per the Bill's Blog: http://frcdirector.blogspot.com/sear...max-results=15 Last edited by Mark McLeod : 04-11-2008 at 14:45. |
|
#12
|
|||||
|
|||||
|
Re: Included in Early Control System Shipment
Quote:
![]() |
|
#13
|
||||||
|
||||||
|
Re: Included in Early Control System Shipment
|
|
#14
|
|||||
|
|||||
|
Re: **FIRST EMAIL**/ALA Sponsorship, Forums Open and Control System Update
But 4 Jaguars to make up for the single victor.
P.S. Odd that the control kit includes 5' of red 14 awg wire but not black, while offering samples of both red & black 10awg. Last edited by Mark McLeod : 04-11-2008 at 14:49. Reason: Type too slow |
|
#15
|
||||||
|
||||||
|
Re: Included in Early Control System Shipment
The screwdriver is specifically designed to operate the WAGO connectors on the Power Distribution Board.
|
![]() |
| Thread Tools | |
| Display Modes | Rate This Thread |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| **FIRST EMAIL**/ FRC 2009 Control System Early Release Update | dlavery | FIRST E-Mail Blast Archive | 12 | 15-10-2008 19:30 |
| 2009 FRC Control System Forums Open now | BornaE | FRC Control System | 7 | 01-10-2008 19:02 |
| **FIRST EMAIL**/ALA Membership | KathieK | FIRST E-Mail Blast Archive | 0 | 25-06-2008 07:42 |
| **FIRST EMAIL**/Championship Hotel Reservation System Open | Mike Schroeder | FIRST E-Mail Blast Archive | 3 | 05-12-2007 22:52 |
| **IMPORTANT FIRST EMAIL BLAST**/Championship Hotel Reservation System to Open Decemb | miketwalker | FIRST E-Mail Blast Archive | 4 | 20-12-2003 13:12 |